xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

CHAPTER IIU.K. MONITORING PLAN

SECTION 2 U.K. Technical feasibility and unreasonable costs

Article 17U.K.Technical feasibility

Where an operator or aircraft operator claims that applying a specific monitoring methodology is technically not feasible, the competent authority shall assess the technical feasibility taking the operator’s or aircraft operator’s justification into account. That justification shall be based on the operator or aircraft operator having technical resources capable of meeting the needs of a proposed system or requirement that can be implemented in the required time for the purposes of this Regulation. Those technical resources shall include availability of required techniques and technology.