Introductory Text
PART 1
1.Citation, commencement, extent and application
2.Interpretation
PART 2
3.Water supply zones
PART 3
4.Wholesomeness: public water supplies
PART 4
5.Application and interpretation
6.Monitoring: general provisions
7.Random samples from consumers’ taps
8.Authorisation of samples from alternative points
9.Numbers of samples
10.Additional sampling
11.Sampling at treatment works
12.Sampling at service reservoirs
13.Sampling: water supplied by tanker
14.Sampling: new sources
15.Collection and analysis of samples
PART 5
16.Drinking water abstraction points: monitoring sites
PART 6
17.Scottish Water to investigate immediately any failure or likely failure
18.Scottish Water to notify immediately any potential danger to human health
19.Scottish Water to report on its investigation etc.
20.Scottish Water to restore water quality
21.Scottish Water to protect human health
22.Powers to require further action by Scottish Water
23.Power to direct local authorities in relation to domestic distribution systems
PART 7
24.Authorisation of temporary supply of water that is not wholesome
25.Authorisations: terms and conditions
26.Authorisations: other limitations
27.Authorisations: publicity
28.Authorisations: revocation and modification
PART 8
29.Treatment of raw water
30.Risk assessment of each treatment works and its connected supply system
31.Procedure following risk assessment and prohibition of supply
32.Copper and lead contamination from pipes
PART 9
33.Application and introduction of substances and products
34.Use of processes
PART 10
35.Offences
36.Offences by bodies corporate
PART 11
37.Maintenance of records
38.Notification of health risk events
39.Publication of information
PART 12
40.Power to enter
41.Entry warrants
42.Approved persons
43.Taking steps
44.Obstruction offence
45.Compensation
PART 13
46.Powers of the Scottish Ministers on default of Scottish Water
PART 14
47.Local authority functions in relation to public water supplies
PART 15
48.Amendment of the Water (Scotland) Act 1980
49.Amendment of the Building (Scotland) Act 2003
50.Revocations
PART 16
51.Water supply zones
52.Authorised departures
Signature
SCHEDULE 1
PRESCRIBED CONCENTRATIONS AND VALUES
SCHEDULE 2
MONITORING
SCHEDULE 3
ANALYSIS: METHODS AND CAPABILITIES
Explanatory Note