SCHEDULES

SCHEDULE 1Scheduled works

In the London Boroughs of Barking & Dagenham and Havering–

  • Work No. 2/13– A railway (2,273 metres in length, partly in tunnel) commencing by a junction with the existing Electric Lines of the Great Eastern Main Line Railway at a point 210 metres south of the junction of Whalebone Lane South with Morden Road, passing eastwards and under that railway and terminating within a proposed depot at a point 220 metres north of the junction of Oldchurch Road and Nursery Walk. Work No. 2/13 includes a new bridge over Jutsums Lane and a depot;

  • Work No. 2/13A– A railway (679 metres in length) commencing by a junction with Work No. 2/13 at a point 255 metres south-east of the junction of Whalebone Lane South with Morden Road, passing eastwards and terminating by a junction with the Great Eastern Main Line Railway at a point 362 metres south-west of the junction of Eddy Close with Bridport Avenue;