Part 2Legislative and executive competence: further provision
Planning for electricity generating stations
43Alignment of associated development consent
1
Section 115 of the Planning Act 2008 (development for which development consent may be granted) is amended as follows.
2
In subsection (2)(c), for “or (4)” substitute “, (4) or (4A)”.
3
After subsection (4) insert—
4A
Development is within this subsection if the development within subsection (1)(a) with which it is associated is—
a
the construction or extension of a generating station that is or (when constructed or extended) is expected to be within section 15(3A) or (3B), or
b
the installation of an electric line that is or (when installed) is expected to be within section 14(1)(b).