SCHEDULES

SCHEDULE 5Acquisition of land for particular purposes

Section 4(2)

The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.

Area

Number of land shown on deposited plans

Purpose for which land may be acquired or used

London Borough of Camden

4, 13, 79a, 99

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051

Diversion or installation of, or works to, utilities apparatus

78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22

Provision of worksite and access for construction

140a, 142

Provision of worksite and access for construction

Diversion or installation of, or works to utilities apparatus

Installation of ground anchors

90, 151 to 154, 157, 159, 177, 180, 181

Installation of ground anchors

363

Provision of electricity supply system and access

434

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

AP3-5

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

London Borough of Brent

28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15

Diversion or installation of, or works to, utilities apparatus

53a, 54a, AP4-6, AP4-10

Provision of worksite and access for construction

Royal Borough of Kensington & Chelsea

1 to 3

Provision of worksite and access for construction

Provision and renewal of railway systems for operational purposes and drainage

16, 19

Diversion or installation of, or works to, utilities apparatus

London Borough of Hammersmith & Fulham

5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11

Provision of worksite and access for construction

12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76

Diversion or installation of, or works to, utilities apparatus

77

Provision of environmental mitigation

AP4-1

Provision of worksite and access for construction and maintenance

London Borough of Ealing

5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17

Provision of worksite and access for construction

103, 106

Provision of worksite and access for construction

Provision and renewal of railway systems for operational purposes and drainage

Diversion or installation of, or works to, utilities apparatus

119, 121, 150, 151, 157, 158, 165

Provision of worksite and access for construction

Reinstatement of businesses or facilities

Diversion or installation of, or works to, utilities apparatus

133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26

Diversion or installation of, or works to, utilities apparatus

213

Provision and renewal of railway systems for operational purposes and drainage

454

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

AP4-1

Reinstatement of businesses or facilities

London Borough of Hillingdon

1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14

Diversion or installation of, or works to, utilities apparatus

25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39

Provision of environmental mitigation

25a, 470, 494b

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

50, 51

Provision of access for construction and maintenance of utility diversions

101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

377, 379, 411, 414, 415, 535

Provision of worksite and access for construction

412, 413, 416 to 419, AP4-26

Provision of worksite and access for construction and maintenance

424, 425, 460, 536, 540, AP4-17 to AP4-19

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

465a, 511

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

474

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

496a, 498, 499, 526 to 534

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

Diversion and installation of overhead electric lines

501, 507

Diversion and installation of overhead electric lines

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

510, AP4-21

Provision of worksite and access for construction

Provision of environmental mitigation

545

Diversion and installation of overhead electric lines

Provision of worksite and access for construction and maintenance

548, 550, 556 to 558, 563, AP2-1

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

562

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

564, 590b, AP2-3, AP2-4

Diversion and installation of overhead electric lines

606, 614, 615, 618

Provision of worksite and access for construction and maintenance

Provision and renewal of railway systems for operational purposes and drainage

Provision of new public right of way

Diversion and installation of overhead electric lines

Diversion or installation of, or works to, utilities apparatus

611, 613

Provision of worksite and access for construction and maintenance

Provision and renewal of railway systems for operational purposes and drainage

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

612

Provision of worksite and access for construction and maintenance

Provision and renewal of railway systems for operational purposes and drainage

Diversion or installation of, or works to, utilities apparatus

616

Provision of worksite and access for construction and maintenance

Provision and renewal of railway systems for operational purposes and drainage

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

496, 654, 655

Provision of environmental mitigation

Provision of flood mitigation measures

496a, 498

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c

Diversion and installation of overhead electric lines

558

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

565

Diversion and installation of overhead electric lines

Provision of electricity supply system and access

566 to 568

Provision of access for construction and maintenance of utility diversions

Provision of electricity supply system and access

603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789

Provision of environmental mitigation

621

Provision of balancing pond and associated works and access for maintenance

Provision of electricity supply system and access

Provision of new public right of way

622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738

Diversion or installation of, or works to, utilities apparatus

633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783

Provision of worksite and access for construction and maintenance

642, 758

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

663, 672

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

692

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Provision of electricity supply system and access

Provision of flood mitigation measures

Provision of new public right of way

Diversion and installation of overhead electric lines

726, 731, 734, 740, 745, 746

Provision of worksite and access for construction

751, 755

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

759

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

AP2-5, AP2-6

Provision of access for construction and maintenance

AP4-40 to AP4-42

Reinstatement of businesses or facilities

County of Buckinghamshire, District of South Bucks,Parish of Iver

AP2-1, AP2-3

Provision and renewal of railway systems for operational purposes and drainage

AP2-9 to AP2-11, AP2-14, AP2-15

Provision of worksite and access for construction

Borough of Slough

AP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34

Provision of worksite and access for construction

AP2-12, AP2-26

Provision and renewal of railway systems for operational purposes and drainage

AP2-13, AP2-20

Provision of worksite and access for construction

Provision and renewal of railway systems for operational purposes and drainage

AP2-17, AP2-22, AP2-23, AP2-28

Provision of worksite and access for construction

Provision of flood mitigation measures

AP2-35

Provision of access for construction and maintenance of utility diversions

AP2-37

Diversion or installation of, or works to, utilities apparatus

County of Buckinghamshire District of South Bucks Parish of Denham

1, 2

Provision of flood mitigation measures

1d, 1f

Diversion and installation of overhead electric lines

11, 17, 19, 32

Provision of environmental mitigation

25, 26, 28 to 31, 33, 46, 52

Provision of worksite and access for construction

14, 15, 23, 27

Provision of balancing pond and associated works and access for maintenance

26

Provision of worksite and access for construction

34

Provision of environmental mitigation

Provision of worksite and access for construction

42, 43

Diversion or installation of, or works to, utilities apparatus

37 to 39, 47 to 49, AP2-3

Provision of access for construction and maintenance

AP4-1, AP4-2, AP4-4 to AP4-9

Provision of worksite and access for construction

Provision of drainage and associated works

Parish of Wexham

AP4-1

Provision of environmental mitigation

County of Hertfordshire District of Three Rivers

5

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104

Provision of worksite and access for construction

12

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

23, 53, 80

Provision of balancing pond and associated works and access for maintenance

32, 36, 37

Provision of worksite and access for construction

Provision of drainage and associated works

40, 46, 61, 63, 64

Provision of drainage and associated works

49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17

Provision of environmental mitigation

75

Provision of environmental mitigation

Provision of worksite and access for construction

107, 109

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of electricity supply system and access

Diversion and installation of overhead electric lines

116

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

10

Diversion or installation of, or works to, utilities apparatus

AP4-18

Reinstatement of businesses or facilities

County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter

1, 7, 21, 30, 31, 35

Provision of worksite and access for construction

16

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

19

Diversion and installation of overhead electric lines

70, 75, 76, 83, 85

Provision of environmental mitigation

Parish of Chalfont St Giles

4 to 6

Provision of environmental mitigation

131

Provision of worksite and access for construction

134, 135, 139, 141, 142, 147

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Parish of Amersham

7, 22, 24, 28, 34, 37

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

10

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

27

Diversion or installation of, or works to, utilities apparatus

31

Provision of environmental mitigation

Provision of worksite and access for construction

59, 66, 67, 74, 76, 77

Provision of protective works to watercourse

Parish of Coleshill

4

Provision of environmental mitigation

8

Diversion or installation of, or works to, utilities apparatus

Parish of Little Missenden

2 to 4

Provision of protective works to watercourse

11, 16

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

14

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

15, 17, 19, 20

Diversion or installation of, or works to, utilities apparatus

AP2-2, AP2-3

Provision of new public right of way

Parish of Great Missenden

142, 158, 174, 178, AP4-55, AP4-56

Provision of environmental mitigation

135 to 137

Provision of drainage and associated works

155, 184

Provision of environmental mitigation

Provision of drainage and associated works

AP4-80, AP4-81

Provision of environmental mitigation

Provision of new public right of way

170, 171

Provision of environmental mitigation

Provision of worksite and access for construction

AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74

Diversion and installation of overhead electric lines

173, 179, 188, 189

Diversion or installation of, or works to, utilities apparatus

112, 117

Provision of environmental mitigation

Diversion and installation of overhead electric lines

Diversion or installation of, or works to, utilities apparatus

157, 159 to 161, 163, 167, AP4-15

Provision of worksite and access for construction

128, 139

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

138, 147

Diversion and installation of overhead electric lines

166

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

162a, 162b

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

180, AP4-51, AP4-52, AP4-75

Provision of environmental mitigation

Diversion and installation of overhead electric lines

AP2-2

Provision of balancing pond and associated works and access for maintenance

AP4-54, AP4-78

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

AP4-57

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

Provision of new public right of way

AP4-58, AP4-69, AP4-70

Provision of worksite and access for construction and maintenance

Provision of drainage and associated works

AP4-65

Provision of balancing pond and associated works and access for maintenance

AP4-67

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

AP4-68

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

Parish of The Lee

2, 42 to 45

Provision of environmental mitigation

5, 22, 24, 28, 34

Reprofiling of ground

8, 9, 26

Provision of worksite and access for construction

Reprofiling of ground

11, 12, 18, 19, 31

Provision of environmental mitigation

Diversion and installation of overhead electric lines

16

Diversion and installation of overhead electric lines

27

Provision of environmental mitigation

Reprofiling of ground

Diversion or installation of, or works to, utilities apparatus

32

Provision of environmental mitigation

Reprofiling of ground

36

Reprofiling of ground

Provision of worksite and access for construction and maintenance

39, 40

Provision of environmental mitigation

Provision of worksite and access for construction

AP2-1

Provision of access for construction

District of Aylesbury Vale Parish of Wendover

1, 3, 14, 48, 150, 153, 233

Provision of environmental mitigation

Diversion and installation of overhead electric lines

5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220

Provision of drainage and associated works

7, 251a

Provision of environmental mitigation

Provision of drainage and associated works

9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257

Provision of environmental mitigation

18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224

Provision of worksite and access for construction

24

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

29

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

31

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Provision of drainage and associated works

32, 58, 108, 109, 142, 212, 214, 223, 241

Diversion and installation of overhead electric lines

34, 55, 94, 124, 204

Provision of environmental mitigation

Diversion and installation of overhead electric lines

Provision of worksite and access for construction

35, 169, 172, 185, 205, 206

Diversion or installation of, or works to, utilities apparatus

38 to 41, 52, 96, 103, 110, 111

Provision of environmental mitigation

Provision of worksite and access for construction

47, 56, 62, 63, 165, 211, 235

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

54

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

61, 221

Provision of worksite and access for construction

Provision of drainage and associated works

64

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of drainage and associated works

91, 213, 215

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

95

Provision of worksite and access for construction and maintenance

100

Provision of environmental mitigation

Provision of drainage and associated works

Diversion and installation of overhead electric lines

135, 136

Provision of balancing pond and associated works and access for maintenance

Diversion and installation of overhead electric lines

156, 159, 217

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

171

Provision of worksite and access for construction

Provision of new public right of way

173

Installation of ground anchors

203

Provision of worksite and access for construction

Provision of new public right of way

Diversion and installation of overhead electric lines

219

Provision of worksite and access for construction

Provision of environmental mitigation

Provision of drainage and associated works

Diversion and installation of overhead electric lines

230

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

AP1-11

Provision of environmental mitigation

Provision of worksite and access for construction and provision of balancing pond and associated works

Access for maintenance

AP2-1

Provision of balancing pond and associated works and access for maintenance

AP2-3a

Minor highway alterations

AP2-4

Reinstatement of businesses or facilities

District of Wycombe Parish of Ellesborough

2

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

4, 15, 74

Provision of worksite and access for construction

5

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

10

Provision of environmental mitigation

Provision of drainage and associated works

13, 17, 32, 33

Diversion or installation of, or works to, utilities apparatus

34, 44, 66, 70

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2

Provision of environmental mitigation

50, 51, 54 to 57

Provision of flood mitigation measures

52

Provision of worksite and access for construction and maintenance

53, 61 to 64, 71, 72

Provision of drainage and associated works

69, 80

Diversion and installation of overhead electric lines

11, 12

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

AP4-1

Provision of environmental mitigation

Provision of worksite and access for construction

District of Aylesbury Vale Parish of Stoke Mandeville

4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161

Provision of environmental mitigation

6, 69, 113

Provision of worksite and access for construction and maintenance

8, 9, 94, 95, 120

Provision of flood mitigation measures

10

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

18

Provision of worksite and access for construction and maintenance

Provision of new public right of way

22, 48, 56, 122, 132, 144

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

24, 59, 63, 116, 149, 151

Provision of worksite and access for construction

25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141

Diversion or installation of, or works to, utilities apparatus

28

Provision of balancing pond and associated works and access for maintenance

43, 84, 103, 129

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

61

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

62

Provision of drainage and associated works

74, 92, 93, 152

Provision of drainage and associated works

Provision of environmental mitigation

83, AP2-2

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

118

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

119

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

123, 131, 134, AP1-3, AP1-4, 150

Provision of environmental mitigation

Provision of worksite and access for construction

126

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

146

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

District of Wycombe Parish of Great and Little Kimble cum Marsh

1

Provision of drainage and associated works

3, 7, 9

Provision of worksite and access for construction

District of Aylesbury Parish of Stone with Bishopstone and Hartwell

6, 65, 86

Diversion or installation of, or works to, utilities apparatus

17, 18, 23, 32

Provision of environmental mitigation

Diversion and installation of overhead electric lines

27, 29, 30, 37, 69, 79, 81

Provision of environmental mitigation

28, 28b

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

33

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

Provision of worksite and access for construction

35

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

36

Provision of environmental mitigation

Provision of access for construction and maintenance

39

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

Provision of access for construction and maintenance

40

Provision of worksite and access for construction and maintenance

44, 46, 53, 57, 59

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

45

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

47

Provision of worksite and access for construction

Provision of a turning head

48, 85, 90

Provision of worksite and access for construction

51, 55

Provision of worksite and access for construction

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

60

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of a turning head

61, 72

Provision of environmental mitigation

Provision of worksite and access for construction

66a, 66b, 71b, 73b

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

Provision of drainage and associated works

Provision of flood mitigation measures

74a, 75, 89

Provision of flood mitigation measures

76a

Provision of environmental mitigation

Provision of drainage and associated works

87

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

88

Provision of flood mitigation measures

Provision of drainage and associated works

AP4-2

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

Parish of Aylesbury

1

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

6, 18

Provision of environmental mitigation

Diversion and installation of overhead electric lines

20 to 22, 24

Provision of environmental mitigation

Parish of Coldharbour

2 to 7, 10, 11

Provision of environmental mitigation

Parish of Fleet Marston

4

Provision of worksite and access for construction and maintenance

5, 11

Provision of environmental mitigation

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

6, 7

Diversion or installation of, or works to, utilities apparatus

8, 9

Provision of flood mitigation measures

10

Provision of worksite and access for construction

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

13, 26

Provision of environmental mitigation

14, 18, 30

Provision of drainage and associated works

15, 21

Provision of worksite and access for construction

16, 19

Provision of environmental mitigation

Provision of new public right of way

20

Provision of environmental mitigation

Provision of worksite and access for construction

23

Provision of worksite and access for construction

Provision of drainage and associated works

25

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

12b

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Parish of Waddesdon

1, 16

Provision of flood mitigation measures

2, 73, 79

Provision of environmental mitigation

Provision of new public right of way

3, 32, 45, 107, 128, 129

Provision of drainage and associated works

6

Provision of environmental mitigation

Provision of drainage and associated works

Provision of new public right of way

7, 9, 113, 120, 126, 127

Provision of environmental mitigation

Provision of worksite and access for construction

8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103

Provision of environmental mitigation

17, 46, 52, 56, 66, 72, 78, 84, 106, 114

Provision of worksite and access for construction

18

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of electricity supply system and access

31, 54, 109, 112

Provision of worksite and access for construction and maintenance

33, 40, 58

Provision of balancing pond and associated works and access for maintenance

68, 93, 110, 111

Diversion or installation of, or works to, utilities apparatus

91

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

94

Provision of new public right of way

97

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

105

Provision of drainage and associated works

Provision of worksite and access for construction and maintenance

123

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of flood mitigation measures

Parish of Quainton

3, 35, 61, 66

Provision of environmental mitigation

Provision of flood mitigation measures

8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2

Provision of balancing pond and associated works and access for maintenance

9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250

Provision of worksite and access for construction

11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24

Provision of environmental mitigation

17, 75, 127, 210, 212

Diversion or installation of, or works to, utilities apparatus

19

Provision of worksite and access for construction

Removal of utility apparatus

21

Provision of environmental mitigation

Provision of worksite and access for construction

Removal of utility apparatus

31

Provision of balancing pond and associated works and access for maintenance

Removal of utility apparatus

32, 50, 68, 151, 219, 220, 224

Provision of flood mitigation measures

33, 72

Provision of worksite and access for construction and maintenance

87

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20

Provision of environmental mitigation

Provision of worksite and access for construction

38

Provision of environmental mitigation

Provision of diversion or installation of, or works to, utilities apparatus

40

Provision of environmental mitigation

Provision of drainage and associated works

46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10

Provision of drainage and associated works

47

Provision of a turning head

Provision of environmental mitigation

49

Provision of a turning head

Diversion or installation of, or works to, utilities apparatus

93

Provision of balancing pond and associated works and access for maintenance

Provision of flood mitigation measures

118c, 176

Provision of environmental mitigation

Diversion and installation of overhead electric lines

124

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233

Diversion and installation of overhead electric lines

136a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of new public right of way

Provision of electricity supply system and access

143

Diversion and installation of overhead electric lines

Provision of access for construction and maintenance

160

Provision of access for construction and maintenance

166

Provision of electricity supply system and access

173

Provision of environmental mitigation

Diversion and installation of overhead electric lines

Provision of drainage and associated works

174, 175

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

204

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of flood mitigation measures

206b, 207a

Provision of environmental mitigation

Provision of electricity supply system and access

243

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

251

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

AP2-6, AP2-7 to AP2-9

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

Parish of Grendon Underwood

3, 5, 10, 28, 30

Provision of environmental mitigation

20, 23, 26

Provision of worksite and access for construction

4

Provision of environmental mitigation

Provision of drainage and associated works

21 and 24

Provision of environmental mitigation

Provision of worksite and access for construction

12a

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

AP2-6

Provision of worksite and access for construction and maintenance

Provision of new public right of way

16a

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Provision of new public right of way

29

Provision of balancing pond and associated works and access for maintenance

AP1-1, AP1-5, AP1-6, AP1-9

Diversion and installation of overhead electric lines

Parish of Middle Claydon

1, 2

Provision of environmental mitigation

Parish of East Claydon

4, 4a, 5, 7

Diversion and installation of overhead electric lines

Parish of Calvert Green

1, 9, 11

Provision of environmental mitigation

2

Provision of environmental mitigation

Provision of new public right of way

AP2-1

Provision of new public right of way

6

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of flood mitigation measures

Provision of new public right of way

8

Provision of flood mitigation measures

23

Diversion or installation of, or works to, utilities apparatus

24

Diversion or installation of, or works to, utilities apparatus

Provision of access for construction and maintenance

25

Provision of worksite and access for construction

18a

Provision of access for construction and maintenance

Provision of new public right of way

AP4-2

Provision of access for construction

AP4-6

Provision of balancing pond and associated works and access for maintenance

Parish of Steeple Claydon

3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4

Provision of environmental mitigation

24, 26a, 27, 31, 33, 97

Provision of worksite and access for construction

72

Provision of environmental mitigation

Provision of access for construction and maintenance

9c, 9d

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of access for construction and maintenance

9a, 100, 117, 119, 120

Diversion or installation of, or works to, utilities apparatus

21

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

52a, 76

Provision of environmental mitigation

Provision of worksite and access for construction

51a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

75

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

98, 99, 112

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

109

Provision of flood mitigation measures

124, 125

Provision of drainage and associated works

69, 71

Provision of new public right of way

102, 103, AP1-8, AP2-1 to AP2-4

Provision of worksite and access for construction and maintenance

Parish of Charndon

2, 3

Diversion or installation of, or works to, utilities apparatus

Parish of Twyford

5, 6, 13, 62, 67, 92, 101

Provision of worksite and access for construction

14

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of new public right of way

24, 26, 44, 49, 54

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

27, 48

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

38, 60, 81, 82, 89, 90

Provision of flood mitigation measures

39

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction

47, 63, 64, 69

Provision of environmental mitigation

Provision of worksite and access for construction

52

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of access for construction and maintenance

53, 76

Provision of worksite and access for construction and maintenance

58, 88

Provision of environmental mitigation

Provision of new public right of way

71, 75, 77, 83, 84, 95, 97, 99, 100

Provision of environmental mitigation

72

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

78

Provision of drainage and associated works

80

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

87

Diversion or installation of, or works to, utilities apparatus

91

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

94

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of access for construction and maintenance

Provision of new public right of way

Parish of Preston Bissett

1 to 4

Provision of flood mitigation measures

6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1

Provision of environmental mitigation

8, 15a, 16b, 28a, 29a, 52

Provision of worksite and access for construction

12a, 12b, AP4-1

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

20, 21

Provision of environmental mitigation

Provision of drainage and associated works

23a

Provision of environmental mitigation

Provision of new public right of way

Provision of drainage and associated works

Provision of worksite and access for construction and maintenance

37

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction and maintenance

16c, 16d, 18b, 41, 47 to 51

Provision of environmental mitigation

Provision of worksite and access for construction

40, 42, 43, 61

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

County of Oxfordshire District of Cherwell Parish of Godington

5a, 5b, 12, AP2-1

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

6a

Provision of worksite and access for construction

8a, 8b, 14, 15

Provision of flood mitigation measures

County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode

1 to 3, 8, 9

Provision of flood mitigation measures

5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87

Provision of environmental mitigation

17a, 17b, 17c, 17d

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of drainage and associated works

19 to 21, 95, 96

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

25, 27, 34, 91

Provision of worksite and access for construction

30

Provision of environmental mitigation

Provision of drainage and associated works

41, 86, 88

Diversion or installation of, or works to, utilities apparatus

51

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

54

Provision of drainage and associated works

Removal of utility apparatus

63

Provision of drainage and associated works

65

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

71, 90

Provision of environmental mitigation

Provision of new public right of way

76

Provision of worksite and access for construction

Removal of utility apparatus

Parish of Barton Hartshorn

2a, AP2-5

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

6a

Provision of environmental mitigation

7a, 16

Provision of worksite and access for construction

9, 10, 22

Provision of flood mitigation measures

13

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

14

Provision of worksite and access for construction

Provision of drainage and associated works

19, 24

Provision of drainage and associated works

25, 26

Provision of environmental mitigation

Provision of new public right of way

County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell

1, 8, 17, 39, 49, 66

Provision of environmental mitigation

Provision of worksite and access for construction

4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86

Provision of environmental mitigation

10, 22, 27, 55, 69, 75, 82, 83

Provision of worksite and access for construction

21, 26, 63, 67, 74, 76

Provision of drainage and associated works

32

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

Provision of worksite and access for construction

37, 59

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

30, 56, 58

Provision of worksite and access for construction and maintenance

57, 62

Provision of flood mitigation measures

Provision of drainage and associated works

61

Provision of worksite and access for construction and maintenance

Provision of new public right of way

64

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

72

Provision of worksite and access for construction

Provision of flood mitigation measures

85, 88

Diversion or installation of, or works to, utilities apparatus

92

Provision of worksite and access for construction

Provision of new public right of way

Parish of Finmere

5, 9, 54

Provision of environmental mitigation

7, 15

Provision of environmental mitigation

Provision of new public right of way

8, 12

Provision of environmental mitigation

Provision of worksite and access for construction

24, 33, 36, 37

Provision of worksite and access for construction

18

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

18a, 25, 40, 42

Diversion or installation of, or works to, utilities apparatus

48

Provision of access for utility works

52

Provision of environmental mitigation

Removal of utility apparatus

Parish of Mixbury

7, 24, 26, 40

Diversion or installation of, or works to, utilities apparatus

8, 13a

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

12, 17a, 45, 46, 57, AP2-8 to AP2-11

Provision of environmental mitigation

15a, 18, AP2-5a

Provision of environmental mitigation

Diversion and installation of overhead electric lines

34, 43a, 43b, 51

Provision of worksite and access for construction

28a, 37, 38

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

31

Provision of balancing pond and associated works and access for maintenance

Provision of electricity supply system and access

31a

Provision of environmental mitigation

Removal of utility apparatus

Diversion or installation of, or works to, utilities apparatus

39

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

40b, 40c, 49

Provision of environmental mitigation

Provision of worksite and access for construction

41a, 63

Provision of drainage and associated works

48

Provision of environmental mitigation

Provision of new public right of way

53, 54

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

Provision of drainage and associated works

52

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

Provision of drainage and associated works

Removal of utility apparatus

62

Provision of flood mitigation measures

Removal of utility apparatus

66

Removal of utility apparatus

County of Buckinghamshire District of Aylesbury Vale Parish of Westbury

1

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

Provision of drainage and associated works

1a

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of new public right of way

5, 6

Provision of drainage and associated works

7

Provision of environmental mitigation

Provision of drainage and associated works

Provision of new public right of way

Provision of worksite and access for construction and maintenance

14

Provision of flood mitigation measures

19, 21 to 25, 27

Provision of environmental mitigation

28

Provision of environmental mitigation

Provision of new public right of way

29

Provision of worksite and access for construction

Provision of new public right of way

30, 33 to 35, 38

Provision of worksite and access for construction

18, 20

Diversion or installation of, or works to, utilities apparatus

Parish of Turweston

3, 4, 45, 46

Provision of new public right of way

11

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100

Provision of worksite and access for construction

18, 21, 89, 91

Provision of environmental mitigation

29

Diversion or installation of, or works to, utilities apparatus

62, 73

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Removal of utility apparatus

81

Provision of worksite and access for construction and maintenance

37

Diversion and installation of overhead electric lines

38, 104, 106

Provision of environmental mitigation

Provision of worksite and access for construction

40, 57

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

42, 61, 67

Diversion and installation of overhead electric lines

43, 48

Diversion and installation of overhead electric lines

Provision of new public right of way

49

Provision of worksite and access for construction

Provision of new public right of way

65

Provision of worksite and access for construction

Removal of utility apparatus

Provision of balancing pond and associated works and access for maintenance

84

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

88

Provision of environmental mitigation

Diversion and installation of overhead electric lines

90

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

102, 110

Provision of drainage and associated works

109

Provision of environmental mitigation

Provision of flood mitigation measures

AP2-1 to AP2-4

Reinstatement of businesses or facilities

County of Northamptonshire District of South Northamptonshire Parish of Whitfield

1

Provision of balancing pond and associated works and access for maintenance

Diversion and installation of overhead electric lines

4, 9, 13, 14

Provision of drainage and associated works

6

Provision of environmental mitigation

Diversion and installation of overhead electric lines

Provision of worksite and access for construction

Provision of drainage and associated works

Provision of electricity supply system, and access

10

Provision of environmental mitigation

Provision of flood mitigation measures

Provision of new public rights of way

Provision of drainage and associated works

16, AP2-3

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

20, 35

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

26

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

30

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

17

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

25

Provision of flood mitigation measures

Provision of new public right of way

27

Provision of flood mitigation measures

28

Provision of environmental mitigation

29, 37, 40, 42, 48 to 50

Provision of worksite and access for construction

41

Provision of balancing pond and associated works and access for maintenance

44

Provision of environmental mitigation

Provision of worksite and access for construction

Parish of Brackley

1

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

4, 6

Provision of worksite and access for construction and maintenance

7

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

9

Provision of worksite and access for construction

12

Provision of environmental mitigation

Provision of worksite and access for construction

13

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

14, 15

Diversion or installation of, or works to, utilities apparatus

Parish of Radstone

1, 2, 22

Provision of worksite and access for construction

5, 7a

Provision of worksite and access for construction

Provision of new public right of way

6a, 6b, 20

Provision of environmental mitigation

Provision of worksite and access for construction

9

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

7

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

8a, 16a, 16c, 18a, 18c, 40, 41, 47

Provision of environmental mitigation

10, 17, 21, 23, 38, AP2-4, AP2-6

Provision of environmental mitigation

Provision of drainage and associated works

19, 26, 32, 33

Provision of environmental mitigation

Provision of drainage and associated works

Provision of balancing pond and associated works and access for maintenance

27, 37a, 37b, 41a

Provision of balancing pond and associated works and access for maintenance

28, 29

Provision of flood mitigation measures

30

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of environmental mitigation

Provision of new public right of way

Removal of utility apparatus

36

Provision of environmental mitigation

Removal of utility apparatus

AP2-7

Provision of new public right of way

46

Provision of flood mitigation measures

Parish of Greatworth

1

Provision of new public right of way

3

Provision of drainage and associated works

Provision of flood mitigation measures

4

Provision of environmental mitigation

Provision of drainage and associated works

5

Provision of flood mitigation measures

8, 11, 15, 75, 76

Provision of environmental mitigation

9

Provision of worksite and access for construction

Provision of new public right of way

12, AP2-1

Provision of worksite and access for construction

Provision of new public right of way

Removal of utility apparatus

13

Provision of environmental mitigation

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

Provision of worksite and access for construction

19

Provision of environmental mitigation

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

15a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

16, 17, 17a, 38

Diversion or installation of, or works to, utilities apparatus

18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5

Provision of worksite and access for construction

10

Provision of environmental mitigation

Provision of new public right of way

20, 21

Provision of drainage and associated works

23

Provision of worksite and access for construction

Provision of drainage and associated works

Removal of utility apparatus

30, 70, 73

Provision of worksite and access for construction

Removal of utility apparatus

24

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

25

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

39a, 39b

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

26

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

28, 31, 32, 34, 52, 56, 83, 99

Provision of worksite and access for construction

Provision of environmental mitigation

29a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

Provision of drainage and associated works

Provision of balancing pond and associated works and access for maintenance

33

Provision of balancing pond and associated works and access for maintenance

43

Provision of flood mitigation measures

Diversion or installation of, or works to, utilities apparatus

44

Provision of worksite and access for construction and maintenance

57, 61a

Provision of worksite and access for construction and maintenance

Provision of new public right of way

Parish of Marston St Lawrence

4, 23

Provision of environmental mitigation

5, 8, 11, 14

Provision of worksite and access for construction

7, 9

Provision of environmental mitigation

Provision of worksite and access for construction

15

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

17

Provision of environmental mitigation

Provision of drainage and associated works

AP4-1

Provision of drainage and associated works

Parish of Sulgrave

1

Provision of environmental mitigation

Provision of new public right of way

Parish of Thorpe Mandeville

3

Provision of new public right of way

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

4, 16, 48, 54

Provision of worksite and access for construction

18, 47

Diversion or installation of, or works to, utilities apparatus

15, 31, 35

Provision of environmental mitigation

25, 41, 42

Provision of drainage and associated works

26

Provision of environmental mitigation

Provision of drainage and associated works

Provision of balancing pond and associated works and access for maintenance

Removal of utility apparatus

28, 33, 36, 40, 43

Provision of flood mitigation measures

29, 51

Provision of environmental mitigation

Provision of worksite and access for construction

60, 62

Provision of balancing pond and associated works and access for maintenance

69

Provision of environmental mitigation

Provision of drainage and associated works

Removal of utility apparatus

Diversion or installation of, or works to, utilities apparatus

71

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

AP2-3

Provision of a turning head

Provision of access for construction

Parish of Culworth

1

Diversion or installation of, or works to, utilities apparatus

7, 8, 13, 16

Provision of environmental mitigation

Provision of worksite and access for construction

11

Provision of environmental mitigation

Provision of drainage and associated works

12, 20, 23

Provision of environmental mitigation

17

Provision of worksite and access for construction

Provision of electricity supply system and access

18

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of new public right of way

19, AP4-1

Provision of balancing pond and associated works and access for maintenance

21a

Provision of worksite and access for construction and maintenance

22, 25, 44

Provision of worksite and access for construction

29

Provision of drainage and associated works

34

Provision of worksite and access for construction

Provision of drainage and associated works

39

Provision of flood mitigation measures

Parish of Chipping Warden and Edgcote

2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2

Provision of environmental mitigation

35, 36, 39

Diversion or installation of, or works to, utilities apparatus

11

Provision of worksite and access for construction

Provision of flood mitigation measures

3, 14, 41

Provision of flood mitigation measures

15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13

Provision of worksite and access for construction

18a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

25

Provision of worksite and access for construction and maintenance

47, AP2-1

Provision of balancing pond and associated works and access for maintenance

58

Provision of environmental mitigation

Provision of new public right of way

65a

Provision of environmental mitigation

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

71, AP1-3, AP2-15

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

72a, AP2-21

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

94a, 99

Provision of worksite and access for construction

Provision of new public right of way

AP2-3, AP2-5, AP2-13

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

AP2-14

Provision of a turning head

AP2-9

Provision of drainage and associated works

AP4-3

Provision of drainage and associated works

AP4-10, AP4-11

Provision of access for construction

Parish of Aston Le Walls

3, 32, AP4-1

Provision of worksite and access for construction

9

Diversion or installation of, or works to, utilities apparatus

10

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

17

Provision of worksite and access for construction

Provision of new public right of way

20

Provision of environmental mitigation

23, 25, AP2-1

Provision of environmental mitigation

Provision of worksite and access for construction

28a, 31, AP2-2, AP2-3

Provision of balancing pond and associated works and access for maintenance

39, AP2-4

Provision of drainage and associated works

Parish of Boddington

11, 29, 39, 52, 54, 66, AP2-1, AP4-3

Provision of drainage and associated works

3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2

Provision of worksite and access for construction

2a, 40a, 87, 96, 98, 114, 123b, AP2-2

Provision of environmental mitigation

Provision of worksite and access for construction

18

Provision of environmental mitigation

Provision of new public right of way

Provision of worksite and access for construction

97, 100a, 107a, 109a

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

85

Diversion or installation of, or works to, utilities apparatus

16, 56, 86

Provision of flood mitigation measures

91

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121

Provision of environmental mitigation

97a and 99

Diversion or installation of, or works to, utilities apparatus

Removal of utility apparatus

101

Provision of worksite and access for construction and maintenance

14a

Provision of balancing pond and associated works and access for maintenance

Provision of flood mitigation measures

22

Provision of environmental mitigation

Provision of new public right of way

Provision of worksite and access for construction

28

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

61

Provision of environmental mitigation

Removal of utility apparatus

69

Provision of balancing pond and associated works and access for maintenance

74

Provision of environmental mitigation

Provision of worksite and access for construction

Removal of utility apparatus

81

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

103a

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction and maintenance

County of Warwickshire District of Stratford-on-Avon Parish of Stoneton

5, 7, 8, 13, 14, 16a, 28

Provision of environmental mitigation

15

Diversion or installation of, or works to, utilities apparatus

16, 18

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

19

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

6b, 9b, 22, 24

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Parish of Wormleighton

21

Provision of environmental mitigation

12, AP2-4

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

11, 15, 17, 18, 20

Provision of worksite and access for construction and maintenance

13

Diversion or installation of, or works to, utilities apparatus

23, 25

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

26

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

Provision of access for construction and maintenance of utility diversions

28

Provision of environmental mitigation

Provision of access for construction and maintenance of utility diversions

31b

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

34a, 47

Provision of environmental mitigation

Provision of worksite and access for construction

50

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

52

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

55

Provision of worksite and access for construction

Parish of Radbourn

2, 13b, 19, 28

Provision of worksite and access for construction

3

Provision of worksite and access for construction

Reprofiling of ground

Provision of drainage and associated works

6

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

7

Provision of worksite and access for construction

Reprofiling of ground

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

8, 8c

Provision of flood mitigation measures

8b

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Reprofiling of ground

Provision of new public right of way

9

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

Provision of new public right of way

Provision of environmental mitigation

11

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

Provision of new public right of way

13a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

15

Provision of environmental mitigation

16

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

5

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

Provision of access for construction and maintenance of utility diversions

8d

Provision of environmental mitigation

Provision of worksite and access for construction

Parish of Ladbroke

5, 19, 20, 25 to 27

Diversion or installation of, or works to, utilities apparatus

7, 12, 15, 39, 41, 42, 52

Provision of environmental mitigation

8, 18

Reprofiling of ground

Provision of drainage and associated works

Provision of worksite and access for construction

24, 28, 32

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

29, 33, 71, 72

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

35, 56, 62, 63, 76

Provision of environmental mitigation

Provision of drainage and associated works

36, 61

Provision of worksite and access for construction

37, AP4-2, AP4-3

Provision of new public right of way

53, 59, 69

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction

66

Provision of balancing pond and associated works and access for maintenance

AP4-1

Minor highway alterations

Parish of Southam

5, 31, 63, 65, 70, 72, 90, 93

Provision of environmental mitigation

54, 56, 58, 60 to 62, 87, AP1-1, AP1-2

Diversion or installation of, or works to, utilities apparatus

6, 9, 111

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

13, 94, 95

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

8, 14, 103

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

24, 32

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

34, 39, 55, 68, 80

Provision of environmental mitigation

Provision of worksite and access for construction

16, 41, 53, 91

Provision of worksite and access for construction

28, 29

Provision of drainage and associated works

45

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

47

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

49, 51, 52, AP4-1 to AP4-3

Provision of new public right of way

75

Provision of environmental mitigation

Provision of access for construction and maintenance of utility diversions

100

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

107

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

112, 118

Provision of worksite and access for construction and maintenance

Parish of Long Itchington

1, 15, 19, 30a, 35a, 37, 47, AP4-4

Provision of environmental mitigation

2

Provision of worksite and access for construction and maintenance

6

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

7

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

7a

Provision of drainage and associated works

9

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of access for construction and maintenance of utility diversions

12, 49, 50, 52, 63, 64

Diversion or installation of, or works to, utilities apparatus

20, 22, 31, 32

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

53

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction and maintenance

48, 57

Provision of worksite and access for construction

58

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

59, 61

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

11a

Removal of utility apparatus

Parish of Ufton

2

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

8, 21, 23, 24

Diversion or installation of, or works to, utilities apparatus

9

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

15

Provision of environmental mitigation

Provision of worksite and access for construction

Drainage and associated work

11, 18

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

Provision of flood mitigation measures

AP4-4 to AP4-7

Provision of access for construction

District of Warwick Parish of Offchurch

4, 6, 32, 49, 50, 51a, 54a

Provision of environmental mitigation

7, 10, 98a

Provision of worksite and access for construction and maintenance

11

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

12, AP2-1

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Provision of drainage and associated works

13, 19, 28, 36, 42 to 44, 53a

Provision of environmental mitigation

Provision of worksite and access for construction

15

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

18

Provision of environmental mitigation

Minor highway alterations

21, 45, 58, 59b, 60, 62

Provision of worksite and access for construction

23

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

24

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

27

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

29, 66, 89

Diversion or installation of, or works to, utilities apparatus

37, 73

Provision of balancing pond and associated works and access for maintenance

57a

Provision of worksite and access for construction

Provision of drainage and associated works

68, 70, 84

Reprofiling of ground

Provision of worksite and access for construction

69

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

71, 75

Provision of new public right of way

78, 79, 87

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

Diversion or installation of, or works to, utilities apparatus

80

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

Provision of access for construction and maintenance of utility diversions

91a

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

92a

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

47a

Provision of a turning head

51b

Provision of a turning head

Provision of environmental mitigation

AP2-2, AP2-3

Minor highway alterations

Parish of Cubbington

1a

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

19, 21, 41, 46, 49, 53, 57, 61, 65

Provision of worksite and access for construction

23, 27, 28, 50, 52, 67

Provision of environmental mitigation

4

Diversion or installation of, or works to, utilities apparatus

5, 6

Provision of access for construction and maintenance

Provision of access for construction and maintenance of utility diversions

9

Provision access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

11a, 14, 15

Provision of environmental mitigation

Drainage and associated works

Provision of worksite and access for construction

32

Provision of drainage and associated works

Provision of worksite and access for construction

35

Provision of environmental mitigation

Provision of drainage and associated works

Installation of ground anchors

39, 48

Provision of environmental mitigation

Provision of worksite and access for construction

44

Provision of new public right of way

47

Provision of access for construction and maintenance

AP4-3

Provision of environmental mitigation

Parish of Weston Under Wetherley

1, 2

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

4, 5a, AP4-1 to AP4-3

Provision of environmental mitigation

AP4-4

Provision of worksite and access for construction and maintenance

Parish of Stoneleigh

1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8

Provision of worksite and access for construction

8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11

Provision of environmental mitigation

21, 24, 28, 29, 31, 34, 43, 77a, 83

Diversion or installation of, or works to, utilities apparatus

22, 42, 144, 158, 163

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction

33, 62

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b

Provision of environmental mitigation

Provision of worksite and access for construction

55

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

63

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

73, AP4-1

Provision of drainage and associated works

79a, 87, 112, 139

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

84

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

136, 141

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

97, 100, 143

Provision of worksite and access for construction and maintenance

99

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

104

Provision of balancing pond and associated works and access for maintenance

105

Provision of environmental mitigation

Provision of flood mitigation measures

132

Provision of flood mitigation measures

133, AP4-12

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

140b, 146

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

166, 182

Provision of environmental mitigation

Provision of new public right of way

171a

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

178

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

184

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

Parish of Kenilworth

12, 30a, AP2-3

Provision of environmental mitigation

13, 16, 21, AP2-1, AP2-2

Provision of worksite and access for construction

5, 6, 23, 25a

Provision of environmental mitigation

Provision of worksite and access for construction

9, 11, 15

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

20

Provision of worksite and access for construction

Provision of new public right of way

Parish of Burton Green

4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12

Provision of environmental mitigation

Provision of worksite and access for construction

7, 19, 59, 63, AP4-1 to AP4-4

Provision of environmental mitigation

11, 21, AP1-1a

Provision of worksite and access for construction

28a, 28b, 28c

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

29, 31

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

32, AP2-3

Provision of worksite and access for construction and maintenance

33a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

Provision of new public right of way

35

Reinstatement of businesses or facilities

72

Provision of environmental mitigation

Provision of new public right of way

77

Provision of new public right of way

98

Provision of worksite and access for construction

Provision of new public right of way

AP2-1

Provision of worksite and access for construction

Provision of environmental mitigation

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

AP2-6

Provision of passing places

District of North Warwickshire Parish of Great Packington

1, 6

Provision of worksite and access for construction

7, 8

Provision of balancing pond and associated works and access for maintenance

Parish of Little Packington

2

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

4

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

10, 12, 15, 16

Diversion and installation of overhead electric lines

17, 19

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

AP1-1

Reinstatement of businesses or facilities

Parish of Coleshill

1c

Provision of environmental mitigation

Diversion and installation of overhead electric lines

1f, 1g, 1r

Provision of balancing pond and associated works and access for maintenance

1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22

Diversion and installation of overhead electric lines

33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a

Diversion or installation of, or works to, utilities apparatus

38

Provision of balancing pond and associated works and access for maintenance

48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a

Provision of worksite and access for construction

50

Diversion and installation of overhead electric lines

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of balancing pond and associated works and access for maintenance

116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28

Provision of environmental mitigation

51, 440, 495a

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

73

Provision of environmental mitigation

Removal of existing utilities

546a

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

74, 321, 452a, 452b, 546

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

75, 233a, 322, 377, 391, 396

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

112b

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

127a

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

108a, 310, 315, 354, 506 to 508, 580a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

100, 427

Provision of worksite and access for construction and maintenance

164

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Diversion and installation of overhead electric lines

283, 289, 297, 312a, 335, 346, 366, 369

Provision of environmental mitigation

Provision of worksite and access for construction

188

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction

195, 196

Provision of worksite and access for construction

Diversion and installation of overhead line equipment

199

Provision of balancing pond and associated works and access for maintenance

Diversion and installation of overhead line equipment

247, 257a

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of new public right of way

253, 388, 416, 451, 459, 460, 502

Provision of environmental mitigation

Diversion and installation of overhead line equipment

308, 318, 467

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

358

Diversion and installation of overhead line equipment

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of balancing pond and associated works and access for maintenance

404, 409

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

432

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

412

Provision of environmental mitigation

Diversion and installation of overhead line equipment

419, 517a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of new public right of way

481

Provision of environmental mitigation

Provision of new public right of way

491a, 491b

Provision of environmental mitigation

Provision of new public right of way

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

511, 559a, 559b, AP2-20

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of balancing pond and associated works and access for maintenance

526a, 526b

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

593a, 593b

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead line equipment

439, 485, 486

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

492, 500

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Parish of Water Orton

6, 132

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

9a, 10, 27, 28, 37, 40, 43a, 82a

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

13a, 42, 50, 57, 64, 65, 67 to 69, 74

Provision of environmental mitigation

23, 34, 35, 38, 39, 41, 77a

Provision of environmental mitigation

Provision of worksite and access for construction

43, AP4-5

Reinstatement of businesses or facilities

44, 89a, 126, 130, 142, AP4-25, AP4-26

Provision of worksite and access for construction

48

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

52

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

53, 54, 56

Provision of balancing pond and associated works and access for maintenance

76

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

100a, 100b, 100c, 118

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

119a, 123

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

124a, 124b, 129, 139a

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20

Diversion and installation of overhead electric lines

138a

Diversion or installation of, or works to, utilities apparatus

133, 140, 143

Provision of worksite and access for construction and maintenance

155a, 155b

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

Provision of balancing pond and associated works and access for maintenance

AP4-14, AP4-16, AP4-17

Provision of worksite and access for construction

Minor highway alterations

Parish of Shustoke

AP4-1 to AP4-3, AP4-5, AP4-6

Provision of environmental mitigation

Parish of Curdworth

1a, 49, 70, 72, 77, 78, 80, 106, 215

Diversion or installation of, or works to, utilities apparatus

2

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

3a, 6, 7, 113a, 201, 202, 223, 241, 244

Provision of worksite and access for construction

5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32

Diversion and installation of overhead electric lines

13, AP2-6

Provision of worksite and access for construction

Provision of environmental mitigation

16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9

Provision of environmental mitigation

10a, 25a, 26 to 28, 31, 32, 45, 48, 69

Provision of environmental mitigation

Diversion and installation of overhead electric lines

35, 191, 194

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246

Provision of worksite and access for construction and maintenance

51a, 68a

Provision of balancing pond and associated works and access for maintenance

Diversion and installation of overhead electric lines

65a, 66a, 81a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

71

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

67a, 83, 83a, 90 to 92

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

88, 209, 233, 247

Provision of new public right of way

98, 101, 103

Installation of ground anchors

99, 103a

Installation of ground anchors

Provision of access for utility works

108a

Provision of environmental mitigation

Provision of access for utility works

153, 164, 251, 254, 256

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

228

Removal of utility apparatus

249

Provision of new public right of way

Provision of environmental mitigation

252

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

AP2-10

Provision of access for maintenance

Parish of Lea Marston

1 to 4, 13, 16

Diversion or installation of, or works to, utilities apparatus

12, 14

Provision of environmental mitigation

Provision of drainage and associated works

17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4

Provision of environmental mitigation

18

Provision of balancing pond and associated works and access for maintenance

44, 47, 49, AP2-23

Provision of new public right of way

66

Provision of new public right of way

Provision of worksite and access for construction

67

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

72a, 72b, 73

Provision of new vehicular right on existing public right of way

74a

Provision of environmental mitigation

Provision of new public right of way

55b, 68b

Provision of environmental mitigation

Minor highway alterations

78a, AP2-22

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

Provision of environmental mitigation

AP2-24

Provision of new public right of way

Parish of Kingsbury

2, AP2-1, AP2-2

Provision of environmental mitigation

Parish of Middleton

4, 108

Provision of environmental mitigation

Provision of flood mitigation measures

27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21

Provision of environmental mitigation

100, AP2-10a

Provision of environmental mitigation

Provision of flood mitigation measures

Provision of balancing pond and associated works and access for maintenance

21, 30, 32

Diversion and installation of overhead electric lines

110, 169a

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction and maintenance

Provision of flood mitigation measures

38, 66

Diversion or installation of, or works to, utilities apparatus

41

Provision of flood mitigation measures

52

Provision and renewal of railway systems for operational purposes and drainage

11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b

Provision of environmental mitigation

Provision of worksite and access for construction

AP2-9

Provision of new public right of way

107

Provision of environmental mitigation

Provision of flood mitigation measures

Provision of worksite and access for construction and maintenance

112, AP2-5

Provision of balancing pond and associated works and access for maintenance

113

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction and maintenance

124, 129, AP2-5a

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

128

Provision of balancing pond and associated works and access for maintenance

Provision of worksite and access for construction

County of Staffordshire District of Lichfield Parish of Drayton Bassett

2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4

Provision of environmental mitigation

28

Diversion or installation of, or works to, utilities apparatus

7, 23, 29, 50, 86

Diversion and installation of overhead electric lines

13a, AP4-1

Provision of worksite and access for construction and maintenance

16

Provision of worksite and access for construction

19a, AP2-6

Provision of balancing pond and associated works and access for maintenance

22, 24

Provision of environmental mitigation

Provision of flood mitigation measures

Provision of worksite and access for construction

30

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

33

Provision of environmental mitigation

Provision of drainage and associated works

53, 92, 94, 102, AP2-7

Provision of environmental mitigation

Provision of worksite and access for construction

58, 59, 63, 68, 71, 80

Provision of environmental mitigation

Diversion and installation of overhead electric lines

93

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

99

Provision of environmental mitigation

Provision of new public right of way

106

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

109, 117, AP2-8 to AP2-10

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

114, AP2-2

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of worksite and access for construction

Parish of Fazeley

3, 6, 8

Diversion and installation of overhead electric lines

Parish of Hints with Canwell

15, 17, 18, 87, 88, AP2-20

Provision of worksite and access for construction and maintenance

20

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17

Provision of environmental mitigation

23, 125, 129

Diversion or installation of, or works to, utilities apparatus

24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154

Provision of environmental mitigation

Provision of worksite and access for construction

25, 28

Provision of worksite and access for construction

Provision of environmental mitigation

Diversion and installation of overhead electric lines

30, 33, 38, 45, 47, 48

Diversion and installation of overhead electric lines

35

Diversion and installation of overhead electric lines

Provision of new public right of way

Provision of worksite and access for construction

Provision of environmental mitigation

37, 39

Diversion and installation of overhead electric lines

Provision of new public right of way

55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19

Provision of environmental mitigation

Provision of new public right of way

Provision of worksite and access for construction

58, AP2-22, AP2-23, AP2-24a

Provision of drainage and associated works

61

Implementation of woodland management measures

65, 143

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

70

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

75a, 75b

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of new public right of way

78a, 78b, 96a

Provision of environmental mitigation

Provision of flood mitigation measures

80

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

82a

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

Implementation of woodland management measures

86

Provision of balancing pond and associated works and access for maintenance

94

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

101

Provision of environmental mitigation

Provision of new public right of way

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

116 to 118, 123

Provision of worksite and access for construction

131a

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

Provision of new public right of way

153, 155

Provision of environmental mitigation

Provision of drainage and associated works

157a, 159

Provision of worksite and access for construction

Provision of drainage and associated works

Provision of environmental mitigation

Parish of Weeford

7, 24, 27

Provision of environmental mitigation

12, 16, 21

Provision of worksite and access for construction

14

Provision of access for construction and maintenance

20

Provision of environmental mitigation

Provision of worksite and access for construction

22

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

AP1-5, AP1-8, AP1-10, AP1-11

Diversion and installation of overhead electric lines

AP2-1

Provision of drainage and associated works

Parish of Swinfen and Packington

11, 16, 23

Provision of environmental mitigation

11a, AP2-1, AP2-2

Provision of drainage and associated works

12, 15, 29

Provision of environmental mitigation

Provision of worksite and access for construction

20

Provision of environmental mitigation

Provision of new public right of way

17a, 18a, 19, 22

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

33, 34, 42

Provision of worksite and access for construction

36, 39

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

37

Diversion or installation of, or works to, utilities apparatus

Parish of Whittington

5, 17, 63, 67, AP2-25, AP2-26

Diversion or installation of, or works to, utilities apparatus

19a, 20a, 23, 101a, AP2-2 to AP2-4

Provision of environmental mitigation

92a, 92b, AP2-5, AP2-6

Provision of environmental mitigation

Provision of balancing pond and associated works and access for maintenance

28, 29, 31, 100a, 104a, 105a, 107, 112, 114a

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

32, 47, 48

Implementation of woodland management measures

37, 41

Implementation of woodland management measures

Provision of new public right of way

42, 46

Provision of environmental mitigation

Provision of worksite and access for construction

Implementation of woodland management measures

52, 54, 116a

Provision of worksite and access for construction and maintenance

58, 64, 66, 98a

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

79, 91, AP2-28, AP2-29

Provision of worksite and access for construction

81a

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

25a

Provision of environmental mitigation

Provision of access for maintenance

AP2-10, AP2-11, AP2-38

Diversion or installation of, or works to, utilities apparatus

Provision of flood mitigation measures

AP2-20

Provision of drainage and associated works

94a

Provision of environmental mitigation

Provision of drainage and associated works

103a

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Parish of Fradley and Streethay

AP2-1, AP2-21

Provision of environmental mitigation

AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138

Provision of worksite and access for construction

AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157

Provision of environmental mitigation

Provision of worksite and access for construction

AP2-119, AP2-120, AP2-122

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of drainage and associated works

AP2-61, AP2-62, AP2-64

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

AP2-40, AP2-43, AP2-68, AP2-71, AP2-163

Provision and renewal of railway systems for operational purposes and drainage

AP2-19, AP2-20, AP2-23

Diversion or installation of, or works to, utilities apparatus

AP2-16

Provision of environmental mitigation

Provision and renewal of railway systems for operational purposes and drainage

Provision of drainage and associated works

AP2-117

Provision of new public right of way

Parish of Curborough and Elmhurst

AP4-3 to AP4-7

Diversion or installation of, or works to, utility apparatus

Parish of Lichfield

AP4-3

Diversion or installation of, or works to, utility apparatus

Parish of Longdon

4 to 6, 8 to 10, 13, 14

Diversion and installation of overhead electric lines

Parish of Kings Bromley

1, 4

Provision and renewal of railway systems for operational purposes and drainage

119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28

Provision of environmental mitigation

Provision of worksite and access for construction

98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a

Provision of worksite and access for construction and maintenance

AP2-54

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

Provision of worksite and access for construction

AP2-33, AP2-35a, AP2-35b, AP2-35c

Provision of worksite and access for construction

Provision of environmental mitigation

Provision of drainage and associated works

52a, 52b, 121

Provision of worksite and access for construction

165, AP2-52, AP2-52a, AP2-53

Provision of environmental mitigation

AP2-46b, AP2-46c

Provision of environmental mitigation

Provision of drainage and associated works

61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9

Diversion or installation of, or works to, utilities apparatus

62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1

Diversion and installation of overhead electric lines

83, 90

Diversion and installation of overhead electric lines

Provision of environmental mitigation

85a, 86

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

88

Provision of access for construction

91, 195, 196

Provision of drainage and associated works

95, 168, 187

Provision of worksite and access for construction and maintenance

Provision of environmental mitigation

102, AP2-35a

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

128a

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

AP2-31a

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

138, 139, 142

Diversion or installation of, or works to, utilities apparatus

Provision of worksite and access for construction

148

Diversion or installation of, or works to, utilities apparatus

Provision of environmental mitigation

Provision of worksite and access for construction

161, 171

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

130b

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

Provision of drainage and associated works

140c

Diversion or installation of, or works to, utilities apparatus

Diversion and installation of overhead electric lines

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Parish of Armitage with Handsacre

1, 4

Provision of worksite and access for construction

11, 14, 15

Provision of worksite and access for construction

Provision of drainage and associated works

18, 20, 24, AP2-1 to AP2-3

Provision of worksite and access for construction and maintenance

Parish of Colton

10, 16, 17

Provision and renewal of railway systems for operational purposes and drainage

Borough of Stafford Parish of Colwich

24, AP2-1

Provision and renewal of railway systems for operational purposes and drainage

Metropolitan Borough of Solihull Parish of Berkswell

2a, 4, 28a, AP2-4

Provision of environmental mitigation

Provision of worksite and access for construction

6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9

Provision of worksite and access for construction

24, 26b, 47, 54, 71, 72

Diversion and installation of overhead electric lines

31

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

35

Provision of environmental mitigation

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utilities apparatus

Provision of electricity supply system and access

36a, 36b

Provision of environmental mitigation

Diversion or installation of, or works to, utilities apparatus

37

Provision of electricity supply system and access

42, AP2-10, AP2-11

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of new public right of way

43

Provision of environmental mitigation

Provision of worksite and access for construction

Installation of ground anchors

53

Provision of new public right of way

55

Provision of environmental mitigation

Provision of drainage and associated works

Provision of worksite and access for construction

Provision of new public right of way

59

Provision of worksite and access for construction

Provision of new public right of way

60, 64 and 69

Provision of drainage and associated works

Provision of worksite and access for construction

63

Provision of environmental mitigation

Provision of drainage and associated works

32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14

Provision of environmental mitigation

129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236

Provision of worksite and access for construction

130a, 142

Provision and renewal of railway systems for operational purposes and drainage

143

Provision of a worksite and access for construction and maintenance

Provision of balancing pond and associated works and access for maintenance

140, 141, 162, 175, 206, 211, 220, 230

Provision of worksite and access for construction and maintenance

147, 151, 152, 153, 155

Provision of worksite and access for construction and maintenance

Diversion or installation of, or works to, utility apparatus

Provision of environmental mitigation

158

Provision of flood mitigation measures

Provision of worksite and access for construction and maintenance

172, 221, 222

Provision of flood mitigation measures

Provision of worksite and access for construction

195, 204, 208, 238

Provision of environmental mitigation

Provision of worksite and access for construction

223, 233

Provision of balancing pond and associated works and access for maintenance

Parish of Meriden

3

Provision of environmental mitigation

Provision of worksite and access for construction

Parish of Hampton-in-Arden

1

Provision of worksite and access for construction and maintenance

Provision of new public right of way

2

Provision of environmental mitigation

4, 6, AP2-6

Provision of environmental mitigation

Provision of worksite and access for construction

7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24

Provision of worksite and access for construction

8, 26, 34, 45, 55

Provision of balancing pond and associated works and access for maintenance

9

Provision of drainage and associated works

16a, 17a, 18a, AP2-8, AP2-10, AP2-11

Provision of worksite and access for construction

Provision of flood mitigation measures

22

Provision of worksite and access for construction and maintenance

24, 43

Provision of a turning head

36, 41

Provision of worksite and access for construction and maintenance

Provision of balancing pond and associated works and access for maintenance

35, 42

Provision of worksite and access for construction and maintenance

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

46a

Provision of balancing pond and associated works and access for maintenance

Provision of new public right of way

47a

Provision of worksite and access for construction

Diversion or installation of, or works to, utility apparatus

49

Provision of flood mitigation measures

25b, 25c

Minor highway alterations

37a

Provision of balancing pond and associated works and access for maintenance

Provision of drainage and associated works

Provision of environmental mitigation

47b

Provision of worksite and access for construction

Diversion of installation of or works to, utilities apparatus

Provision of new public rights of way

Provision of worksite and access for construction

AP2-26

Provision of drainage and associated works

Parish of Bickenhill

2, 3

Provision of balancing pond and associated works and access for maintenance

6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76

Provision of worksite and access for construction

37, 40, 41b, 62, 69a

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

41

Provision of worksite and access for construction and maintenance

Diversion and installation of overhead electric lines

12

Provision of balancing pond and associated works and access for maintenance

11

Provision of balancing pond and associated works and access for maintenance

Minor highway alterations

42a, 42b, 42c, 57a, 57b, 57c

Provision and renewal of railway systems for operational purposes and drainage

58

Diversion or installation of, or works to, utilities apparatus

71

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of balancing pond and associated works and access for maintenance

71b

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of balancing pond and associated works and access for maintenance

85

Provision of environmental mitigation

Diversion and installation of overhead electric lines

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

87

Provision of environmental mitigation

90

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

88

Provision of balancing pond and associated works and access for maintenance

Diversion or installation of, or works to, utilities apparatus

91

Diversion or installation of, or works to, utilities apparatus

Reinstatement of businesses or facilities

91a

Reinstatement of businesses or facilities

Parish of Dickens Heath

AP4-1

Reinstatement of businesses or facilities

Parish of Chelmsley Wood

6

Provision of worksite and access for construction and maintenance

City of Birmingham

1a

Diversion and installation of overhead electric lines

3a, 4b, 4c, AP2-11, AP2-12

Provision of worksite and access for construction

5a

Provision of environmental mitigation

12

Provision of environmental mitigation

Provision of worksite and access for construction

8

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion or installation of, or works to, utilities apparatus

9

Provision of environmental mitigation

Provision of flood mitigation measures

9a and 9b

Provision of environmental mitigation

Provision of flood mitigation measures

Diversion and installation of overhead electric lines

13a, 15, 29, 32, 33

Provision of environmental mitigation

Provision of worksite and access for construction

Provision of flood mitigation measures

14, 28

Provision of environmental mitigation

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

Provision of flood mitigation measures

16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401

Provision of worksite and access for construction

23, 24, 27

Provision of worksite and access for construction

Diversion and installation of overhead electric lines

26

Provision of environmental mitigation

41

Provision of balancing pond and associated works and access for maintenance

Provision of environmental mitigation

46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479

Provision of worksite and access for construction

Diversion or installation of, or works to, utility apparatus

63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28

Reinstatement of businesses or facilities

67

Provision of worksite and access for construction

Provision and renewal of railway systems for operational purposes and drainage

102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24

Diversion or installation of, or works to, utility apparatus

157c, 157e, 157g, 274a, 322, 355, 363, 376

Provision and renewal of railway systems for operational purposes and drainage

223

Provision of worksite and access for construction

Provision of access for construction and maintenance

268

Provision and renewal of railway systems for operational purposes and drainage

Diversion or installation of, or works to, utility apparatus

269, 271 to 273, 324, 419

Provision of worksite and access for construction

Provision of balancing pond and associated works and access for maintenance

300d, 300e

Removal of utility apparatus

19, 304, 305, 306, 326, 326a

Provision of balancing pond and associated works and access for maintenance

332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31

Provision of worksite and access for construction and maintenance

367, 368

Provision and renewal of railway systems for operational purposes and drainage

Provision of worksite and access for construction and maintenance

437

Provision of worksite and access for construction

Provision of a turning head

317

Minor highway alterations

City of Manchester

1 to 6

Modification to depot