xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 12PROTECTION OF RAILWAY INTERESTS

12.  The undertaker shall—

(a)at all times afford reasonable facilities to the engineer for access to the specified works during their construction, and

(b)supply the engineer with all such information as he may reasonably require with regard to the specified works or the method of construction of the specified works.