SCHEDULES

SCHEDULE 13FOR PROTECTION OF BRITISH WATERWAYS BOARD

Fencing

5

Where so required by the engineer Merseytravel shall to the reasonable satisfaction of the engineer fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from a waterway, whether on a temporary or permanent basis or both.