xmlns:atom="http://www.w3.org/2005/Atom"

PART 2WORKS PROVISIONS

Principal Powers

Power to deviate

5.  In constructing or maintaining any of the scheduled works, the Council may—

(a)deviate laterally from the lines or situations shown on the deposited plans within the limits of deviation for that work shown on those plans, and

(b)deviate vertically from the levels shown on the deposited sections to any extent not exceeding 3 metres upwards or downwards.