Prospective

SCHEDULE 5U.K.(This Schedule reproduces Annex III to the High-Speed Directive)

ESSENTIAL REQUIREMENTS FOR THE TRANS-EUROPEAN HIGH-SPEED RAIL SYSTEMU.K.

ESSENTIAL REQUIREMENTSU.K.

2.7.2  Reliability and availability

The operation and maintenance periods, the training and qualifications of the maintenance staff and the quality assurance system set up by the operators concerned in the maintenance centres must be such as to ensure a high level of system reliability and availability.