Prospective
Commencement Information
I1Sch. 6 in force at 20.3.2006, see reg. 1(2)
2.3.1 Safety
The control and command and signalling installations and procedures used must enable trains to travel with a level of safety which corresponds to the objectives set for the network. The control and command and signalling systems should continue to provide for safe passage of trains permitted to run under degraded conditions.