xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Prospective

SCHEDULE 6U.K.(This Schedule reproduces Annex III to the Conventional Directive)

Commencement Information

I1Sch. 6 in force at 20.3.2006, see reg. 1(2)

ESSENTIAL REQUIREMENTS FOR THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEMU.K.

REQUIREMENTS SPECIFIC TO EACH SUBSYSTEMU.K.

2.4.2  Reliability and availability

The design of the vital equipment, of the running, traction and braking equipment and of the control and command system must be such as to enable the train to continue its mission, in a specific degraded situation, without adverse consequences for the equipment remaining in service.