xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Prospective

SCHEDULE 6U.K.(This Schedule reproduces Annex III to the Conventional Directive)

Commencement Information

I1Sch. 6 in force at 20.3.2006, see reg. 1(2)

ESSENTIAL REQUIREMENTS FOR THE TRANS-EUROPEAN CONVENTIONAL RAIL SYSTEMU.K.

REQUIREMENTS SPECIFIC TO EACH SUBSYSTEMU.K.

2.6.2  Reliability and availability

The maintenance operations and periods, the training and qualifications of the maintenance and control centre staff and the quality assurance system set up by the operators concerned in the control and maintenance centres must be such as to ensure a high level of system reliability and availability.