I1SCHEDULE 9(This Schedule substantially reproduces, with minor modifications, the provisions of Annex VI to the High-Speed Directive and to the Conventional Directive)

Annotations:
Commencement Information
I1

Sch. 9 in force at 2.4.2006, see reg. 1(3)

VERIFICATION PROCEDURE FOR SUBSYSTEMS

CERTIFICATE3

The notified body responsible for EC verification draws up the certificate of conformity intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the EC declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.