xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 13E+WFOR PROTECTION OF BRITISH WATERWAYS BOARD

FencingE+W

6.  Where so required by the engineer the promoter shall to the reasonable satisfaction of the engineer fence off a specified work or a protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from a waterway, whether on a temporary or permanent basis or both.E+W

Commencement Information

I1Sch. 13 para. 6 in force at 9.6.2009, see art. 1