SCHEDULES

SCHEDULE 11PROTECTIVE WORKS

Article 20

  • Part of Work No. 5(c)— works to protect the existing river wall.

  • Work No. 5(d)— works to strengthen or support the existing river wall landward of the Putney Embankment Foreshore temporary slipway.

  • Work No. 6(b)(iii)— strengthening and alteration of existing river wall to the south of Whiffin Wharf, and strengthening or replacing the existing river wall to the south of Hurlingham Wharf and Carnwath Road Industrial Estate.

  • Work No. 8(b)(ii)— strengthening and alteration of the existing river wall to the south of Bell Lane Creek and works to protect and or strengthen the river wall on the north side of Bell Lane Creek.

  • Work No. 11(c)(iii)— replacement or other works to protect or strengthen the existing flood defence on the western boundary of the site.

  • Part of Work No. 12(c)— works to protect the existing river wall.

  • Part of Work No. 13(b)(iii)— works to protect or strengthen the existing river wall.

  • Part of Work No. 14(c)(ii)— works to protect or strengthen the existing river wall to east and west of Work No. 14(c)(i) and the existing Middle Wharf jetty.

  • Work No. 15(c)(ii)— works to protect and strengthen the existing slipway and existing river wall.

  • Part of Work No. 16(c)— works to protect the existing river wall and adjoining structures.

  • Part of Work No. 17(b)— works to protect the existing river wall and adjoining structures.

  • Part of Work No. 18— works to replace or protect the boundary wall on the west side of the existing facilities building.

  • Part of Work No. 19(b)— works to protect or strengthen the river wall and adjoining structures at the western end of the site.

  • Part of Work No. 19(b)(i)— works to replace, protect or strengthen the existing river wall to the west of Fountain Green Square.

  • Part of Work No. 23(b)— works to protect or strengthen the existing Docklands Light Railway viaduct.

  • Part of Work No. 23(b)(i)— works to protect or strengthen the existing river wall.

  • Part of Work No. 24(b)— works to protect or strengthen the existing river wall.

  • Work No. 24(b)(v)— works to protect or strengthen the existing river wall.