SCHEDULE 25Flood risk activities and excluded flood risk activities

PART 2Excluded flood risk activities

SECTION 2Descriptions and conditions

Fencing9

1

The erection of fencing.

2

For the purposes of this paragraph, the specific conditions are—

a

the fencing is not located on the bed or banks of the main river, and

b

the fencing is constructed of—

i

post and rail,

ii

post and wire mesh of at least 100 mm spacing, or

iii

post and wire strands.