Search Legislation

The East Anglia THREE Offshore Wind Farm Order 2017

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

PART 1Authorised development

1.  A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act which is located in the North Sea approximately 69 kilometres from the Suffolk coast, comprising—

Work No. 1

(a)an offshore wind turbine generating station with a gross electrical output capacity of up to 1,200 MW comprising up to 172 wind turbine generators each fixed to the seabed by one of four foundation types (namely, monopile, jacket, suction caisson or gravity base), fitted with rotating blades and situated within the area shown on the works plan and further comprising (b) to (e) below;

(b)up to one accommodation platform fixed to the seabed within the area shown on the works plan by one of two foundation types (namely jacket or gravity base);

(c)up to two meteorological masts fixed to the seabed within the area shown on the works plan by one of four foundation types (namely monopile, jacket, suction caisson or gravity base);

(d)up to 12 buoys fixed to the seabed within the area shown on the works plan;

(e)a network of subsea inter-array cables within the area shown on the works plan between the wind turbine generators and between the wind turbine generators and Work No.2 including one or more cable crossings;

and associated development within the meaning of section 115(2) of the 2008 Act comprising—

Work No. 2 – up to six offshore electrical stations fixed to the seabed within the area shown on the works plan by one of two foundation types (namely jacket or gravity base);

Work No. 3 – a network of subsea cables within the area shown on the works plan between the offshore electrical stations comprising Work No. 2 and for the transmission of electricity and electronic communications including one or more cable crossings;

Work No. 4 – up to four cables to connect Work No. 2 with the East Anglia ONE Offshore Wind Farm;

Work No. 5A – Up to four cables between Work No. 2 and Work No. 5B consisting of subsea cables along routes within the Order limits seaward of MHWS including one or more cable crossings;

In the county of Suffolk, district of Suffolk Coastal

Work No. 5B – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from mean low water springs at Bawdsey Cliffs to Work No. 7 together with a temporary transition bay compound;

Work No. 6 – A new temporary vehicular access track running in an easterly direction from the eastern side of Ferry Road to Work No. 7 and Work No. 5B, together with modifications to the junction of the new vehicular access track and Ferry Road and a new temporary vehicular access ramp to the beach at Bawdsey Cliffs;

Work No. 7 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 5B to Work No. 8, together with up to four transition bays and a temporary transition bay compound, and a new temporary vehicular access track from Ferry Road;

Work No. 8 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 7 to Work No. 12 crossing under Ferry Road and running in a westerly then north-westerly direction;

Work No. 9 – Temporary widening and upgrade of an existing access track running in a north-westerly direction from the western side of Ferry Road to Work No. 8;

Work No. 10 – Temporary widening and upgrade of an existing access track running in a north-westerly then westerly direction from Work No. 8 and a new temporary vehicular access track running from the existing access track in a south-westerly direction to Work No. 8;

Work No. 11 – Temporary widening and upgrade of an existing access track running in a south-easterly direction from the southern side of Dock Road to Duke’s Lane, then temporary widening and upgrade of Duke’s Lane running in a south-westerly then south-easterly direction to Work No. 8 and a new temporary vehicular access track from Duke’s Lane to Work No. 8, together with modifications to the junction of the new temporary vehicular access track and Duke’s Lane;

Work No. 12 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 8 to Work No. 13 running in a south-westerly direction and passing under the River Deben;

Work No. 13 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 12 to Work No. 17 running in a westerly direction then north-westerly direction;

Work No. 14 – A new temporary vehicular access track running in a north-westerly direction from Work No. 13 and temporary widening and upgrade of an existing access track running in a south-westerly direction to Work No. 13;

Work No. 15 – Temporary widening and upgrade of an existing access track running in a northerly direction from the northern side of Lower Falkenham Road and with two upper branches, one running in a north-westerly direction and the other in a north-easterly direction, to Work No. 13;

Work No. 16 – Temporary widening and upgrade of two existing access tracks, the first running in a south-easterly direction from the southern side of Park Lane to Work No. 13, and the second running in a north-westerly direction from the northern side of Park Lane with two upper branches, the first running in a westerly direction to Work No. 19, and the second continuing in an easterly then northerly direction past Sluice Farm and then in north westerly direction to the east side of The Thicket, together with a new temporary vehicular access track running from the existing access track on the east side of The Thicket in a westerly direction to Work No. 20;

Work No. 17 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 13 to Work No. 19 running in a north-westerly direction;

Work No. 18 – A new temporary secondary construction consolidation site;

Work No. 19 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 17 to Work No. 20 crossing under Park Lane and running in a northerly direction;

Work No. 20 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 19 to Work No. 21 running in a northerly direction;

Work No. 21 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 20 to Work No. 25 running in a northerly direction and crossing under The Street and Ipswich Road;

Work No. 22 – A new temporary secondary construction consolidation site;

Work No. 23 – Temporary widening and upgrade of an existing access track running in an easterly direction from the eastern side of Woodbridge Road to Work No. 22;

Work No. 24 – A new temporary access track running in an easterly direction from the eastern side of Newbourne Road to Work No. 21;

Work No. 25 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 21 to Work No. 28 crossing under Woodbridge Road and running in an easterly then north-westerly direction and crossing under Waldringfield Road, then running in a north-easterly direction and crossing under Waldringfield Road;

Work No. 26 – Temporary widening and upgrade of an existing access track running in an easterly direction from the eastern side of Waldringfield Road to Work No. 25;

Work No. 27 – Temporary widening and upgrade of an existing access track running in a northerly then easterly direction from the northern side of Waldringfield Road to Work No. 25;

Work No. 28 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 25 to Work No. 29 running in a northerly direction and crossing under Martlesham Creek and the East Suffolk Railway line;

Work No. 29 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 28 to Work No. 30 running in a westerly direction and crossing under Sandy Lane;

Work No. 30 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 29 to Work No. 32 crossing under Top Street and running in a westerly direction;

Work No. 31 – A new temporary primary construction consolidation site;

Work No. 32 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 30 to Work No. 34 and running in a westerly direction;

Work No. 33 – Temporary widening and upgrade of an existing access track known as Brock Lane running in a westerly direction from the western side of Top Street to Work No. 31 and continuing to Work No. 34;

Work No. 34 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 32 to Work No. 35 running in a north-westerly direction and crossing under the A12 highway;

Work No. 35 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 34 to Work No. 38 running in a north-easterly then westerly direction;

Work No. 36 – Temporary widening and upgrade of an existing access track running in a southerly direction to Work No. 35;

Work No. 37 – A new temporary access track from the southern side of Lodge Road to Work No. 35;

Work No. 38 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 35 to Work No. 39 running in a westerly direction and crossing under Lodge Road;

Work No. 39 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 38 to Work No. 41 running in a north-westerly direction and crossing under Holly Lane then running in a westerly direction and crossing under Church Road;

Work No. 40 – A new temporary secondary construction consolidation site;

Work No. 41 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 39 to Work No. 45 crossing under Butts Road then running in a westerly direction then a north-westerly direction and crossing under Grundisburgh Road and Clopton Road then running in a south-westerly direction;

Work No. 42 – A new temporary vehicular access track running in a southerly direction from the southern side of the existing access road to Work No. 41;

Work No. 43 – Temporary widening and upgrade of an existing access track running in a southerly direction from the southern side of Grundisburgh Road to Work No. 41;

Work No. 44 – Temporary widening and upgrade of an existing access track running in a northerly then westerly direction from the northern side of Grundisburgh Road to Work No. 41;

Work No. 45 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 41 to Work No. 47 crossing under Witnesham Road and running in a north-westerly direction;

Work No. 46 – A new temporary secondary construction consolidation site;

Work No. 47 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 45 to Work No. 48 crossing under Cockfield Hall Lane then running in a north-westerly then south-westerly direction;

In the county of Suffolk, district of Mid Suffolk

Work No. 48 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 47 to Work No. 49 running in a westerly direction and crossing under Henley Road and an unnamed road;

Work No. 49 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 48 to Work No. 50 running in a south-westerly direction and crossing under Old Ipswich Road and the A14 highway;

Work No. 50 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 49 to Work No. 52 running in a westerly direction and crossing under Paper Mill Lane;

Work No. 51 – A new temporary primary construction consolidation site;

Work No. 52 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 50 to Work No. 55 running in a westerly and crossing under the River Gipping, the Great Eastern Mainline Railway and Bramford Road;

Work No. 53 – A new temporary vehicular access track running in a westerly direction from the western side of Paper Mill Lane to Work No. 52;

Work No. 54 – A new temporary vehicular access track running in an easterly direction from the eastern side of Bramford Road to Work No. 52;

Work No. 55 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 52 to Work No. 58 running in a south-westerly direction and crossing under Pound Lane, Somersham Road and Tye Lane;

Work No. 56 – Temporary widening and upgrade of an existing access track running in an easterly direction from the eastern side of Somersham Road to Work No. 55;

Work No. 57 – Temporary widening and upgrade of an existing access track running in a southerly then westerly direction from and to Work No. 55;

Work No. 58 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 55 to Work No. 62 running in a south westerly direction and passing under Miller’s Wood;

Work No. 59 – A new temporary vehicular access track running in a south-westerly then south-easterly direction from and to Work No. 58;

Work No. 60 – A new temporary vehicular access track running in a northerly direction from Work No. 61A to Work No. 58, together with modifications to the junction of the new temporary access track and Bullen Lane;

Work No. 61 – A new temporary secondary construction consolidation site;

Work No. 61A – Temporary widening and upgrade of Bullen Lane;

Work No. 62 – Onshore connection works consisting of up to four circuits pulled through existing ducts laid underground from Work No. 58 to Work No. 63 and/or Work. No 64;

Work No. 63 – Onshore connection works consisting of up to four circuits pulled through existing ducts or laid directly underground from Work No. 62 and/or Work No. 64 to Work No. 67, and continuing from Work No. 67 to Work No. 66;

Work No. 64 – Onshore connection works consisting of up to four circuits pulled through existing ducts or laid directly underground from Work No. 62 to Work No. 63, and landscaping works including bunding and planting;

Work No. 65 – A new temporary lay down area and landscaping works including planting;

Work No. 66 – Onshore connection works consisting of up to four circuits pulled through existing ducts or laid directly underground from Work No. 63 running in a southerly direction to a connection point at the existing National Grid Bramford substation;

Work No. 67 – Works comprising onshore substations;

Work No. 68 – Landscaping works including bunding and planting;

Work No. 69 – Landscaping works including bunding and planting;

and in connection with Work Nos. 1 to 5A and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the work assessed by the environmental statement and the deemed marine licences;

and in connection with such Work Nos. 5B to 69 and to the extent that they do not otherwise form part of any such work—

(a)haul roads, ramps, and other vehicular and/or pedestrian means of access, including creation of new tracks and footpaths, and/or widening, upgrades and improvements of existing tracks and footpaths;

(b)bunds, embankments, swales, landscaping and boundary treatments;

(c)spoil storage;

(d)jointing bays, manholes, kiosks, marker posts and other works associated with laying cables and/or pulling cables through cable ducts;

(e)water supply works, foul drainage provision, surface water management systems, temporary drainage during installations of cables and culverting;

(f)works of restoration;

(g)fencing or other means of enclosure; and

(h)such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project;

which fall within the scope of the works assessed by the environmental statement.

2.  The grid coordinates for that part of the authorised project which is seaward of MHWS are specified below—

PointLatitude (DMS)Longitude (DMS)PointLatitude (DMS)Longitude (DMS)
152° 46′ 18.078″ N3° 2′ 15.841″ E9952° 2′ 56.210″ N1° 36′ 30.422″ E
252° 30′ 20.026″ N2° 48′ 33.266″ E10052° 2′ 55.965″ N1° 36′ 29.813″ E
352° 21′ 27.702″ N2° 46′ 4.457″ E10152° 2′ 55.703″ N1° 36′ 29.224″ E
452° 21′ 25.414″ N2° 46′ 4.374″ E10252° 2′ 55.425″ N1° 36′ 28.655″ E
552° 21′ 23.834″ N2° 46′ 4.110″ E10352° 3′ 53.611″ N1° 35′ 40.499″ E
652° 21′ 22.268″ N2° 46′ 3.678″ E10452° 2′ 14.707″ N1° 35′ 9.305″ E
752° 21′ 20.724″ N2° 46′ 3.080″ E10552° 2′ 14.565″ N1° 35′ 9.040″ E
852° 21′ 19.206″ N2° 46′ 2.318″ E10652° 0′ 43.447″ N1° 33′ 4.952″ E
952° 21′ 17.722″ N2° 46′ 1.395″ E10752° 0′ 43.076″ N1° 33′ 4.472″ E
1052° 21′ 16.278″ N2° 46′ 0.316″ E10852° 0′ 42.691″ N1° 33′ 4.023″ E
1152° 21′ 14.881″ N2° 45′ 59.085″ E10952° 0′ 42.293″ N1° 33′ 3.605″ E
1252° 21′ 13.535″ N2° 45′ 57.708″ E11052° 0′ 41.883″ N1° 33′ 3.218″ E
1352° 21′ 12.248″ N2° 45′ 56.189″ E11152° 0′ 41.461″ N1° 33′ 2.865″ E
1452° 21′ 11.884″ N2° 45′ 55.697″ E11252° 0′ 41.030″ N1° 33′ 2.545″ E
1552° 26′ 58.467″ N2° 45′50.653″ E11352° 0′ 40.589″ N1° 33′ 2.260″ E
1652° 45′ 10.569″ N2° 45′ 33.773″ E11452° 0′ 40.140″ N1° 33′ 2.011″ E
1752° 45′ 6.907″ N2° 44′ 40.427″ E11552° 0′ 39.685″ N1° 33′ 1.797″ E
1852° 30′ 36.607″ N2° 44′ 41.630″ E11651° 58′ 47.510″ N1° 32′ 13.971″ E
1952° 31′ 32.110″ N2° 44′ 38.806″ E11751° 57′ 36.634″ N1° 29′ 50.826″ E
2052° 31′ 32.077″ N2° 44′ 38.805″ E11852° 0′ 41.137″ N1° 27′ 15.227″ E
2152° 27′ 48.317″ N2° 44′ 29.313″ E11951° 57′ 51.572″ N1° 26′ 41.476″ E
2252° 20′ 39.779″ N2° 35′ 43.596″ E12051° 57′ 51.622″ N1° 26′ 40.671″ E
2352° 19′ 21.003″ N2° 35′ 42.287″ E12151° 57′ 51.647″ N1° 26′ 39.863″ E
2452° 19′ 19.701″ N2° 35′ 42.202″ E12251° 57′ 51.646″ N1° 26′ 39.054″ E
2552° 19′ 18.121″ N2° 35 41.945″ E12351° 57′ 51.619″ N1° 26′ 38.246″ E
2652° 19′ 16.555″ N2° 35′ 41.519″ E12451° 57′ 51.567″ N1° 26′ 37.441″ E
2752° 19′ 15.009″ N2° 35′40.927″ E12551° 57′ 51.489″ N1° 26′ 36.642″ E
2852° 19′ 13.490″ N2° 35′ 40.172″ E12651° 57′ 51.385″ N1° 26′ 35.850″ E
2952° 19′ 12.005″ N2° 35′ 39.255″ E12751° 57′ 51.257″ N1° 26′ 35.068″ E
3052° 19′ 10.559″ N2° 35′ 38.183″ E12851° 57′ 51.181″ N1° 26′ 34.683″ E
3152° 19′ 9.160″ N2° 35′ 36.958″ E12951° 57′ 51.104″ N1° 26′ 34.298″ E
3252° 19′ 7.813″ N2° 35′ 35.587″ E13051° 57′ 51.080″ N1° 26′ 34.194″ E
3352° 19′ 6.523″ N2° 35′ 34.075″ E13152° 0′ 2.565″ N1° 25′ 32.077″ E
3452° 19′ 5.297″ N2° 35′ 32.429″ E13252° 0′ 1.828″ N1° 25′ 30.107″ E
3552° 19′ 4.140″ N2° 35′ 30.655″ E13352° 0′ 0.831″ N1° 25′ 27.444″ E
3652° 19′ 3.800″ N2° 35′ 30.087″ E13452° 0′ 0.799″ N1° 25′ 27.357″ E
3752° 18′ 18.898″ N2° 34′ 13.648″ E13552° 0′ 0.748″ N1° 25′ 27.271″ E
3852° 18′ 15.833″ N2° 34′ 13.645″ E13652° 0′ 0.655″ N1° 25′ 27.123″ E
3952° 27′ 57.918″ N2° 34′ 5.046″ E13752° 0′ 0.633″ N1° 25′ 27.079″ E
4052° 27′ 52.453″ N2° 33′ 59.829″ E13852° 0′ 0.615″ N1° 25′ 27.030″ E
4152° 14′ 17.007″ N2° 33′ 46.245″ E13952° 0′ 0.542″ N1° 25′ 26.883″ E
4252° 14′ 16.167″ N2° 33′ 38.948″ E14052° 0′ 0.465″ N1° 25′ 26.741″ E
4352° 24′ 0.479″ N2° 29′ 6.650″ E14152° 0′ 0.263″ N1° 25′ 26.337″ E
4452° 23′ 14.798″ N2° 26′ 39.878″ E14251° 59′ 59.939″ N1° 25′ 25.678″ E
4552°14′ 1.882″ N2° 26′ 45.354″ E14351° 59′ 59.627″ N1° 25′ 25.040″ E
4652° 13′ 55.527″ N2° 26′ 44.591″ E14451° 59′ 59.306″ N1° 25′ 24.402″ E
4752° 9′ 28.063″ N2° 25′ 36.366″ E14551° 59′ 59.030″ N1° 25′ 23.861″ E
4852° 9′ 31.781″ N2° 25′ 35.028″ E14651° 59′ 59.015″ N1° 25′ 23.828″ E
4952° 20′ 54.386″ N2° 21′ 15.039″ E14751° 59′ 59.009″ N1° 25′ 23.816″ E
5052° 20′ 47.385″ N2° 21′ 9.270″ E14851° 59′ 58.926″ N1° 25′ 23.634″ E
5152° 13′ 39.649″ N2° 17′ 18.125″ E14951° 59′ 58.853″ N1° 25′ 23.473″ E
5252° 13′ 35.674″ N2° 15′ 59.368″ E15051° 59′ 58.772″ N1° 25′ 23.293″ E
5352° 13′ 33.795″ N2° 15′ 22.225″ E15151° 59′ 57.690″ N1° 25′ 21.148″ E
5452° 11′ 17.487″ N2° 11′ 34.133″ E15251° 59′ 57.689″ N1° 25′ 21.146″ E
5552° 11′ 17.575″ N2° 11′ 33.361″ E15351° 59′ 57.555″ N1° 25′ 20.881″ E
5652° 11′ 17.638″ N2° 11′ 32.583″ E15451° 59′ 57.555″ N1° 25′ 20.880″ E
5752° 11′ 17.678″ N2° 11′ 31.800″ E15551° 59′ 57.516″ N1° 25′ 20.807″ E
5852° 11′ 17.694″ N2° 11′ 31.015″ E15651° 59′ 57.517″ N1° 25′ 20.807″ E
5952° 11′ 17.686″ N2° 11′ 30.230″ E15751° 59′ 57.517″ N1° 25′ 20.806″ E
6052° 11′ 17.654″ N2° 11′ 29.447″ E052° 25′ 56.467″ N2° 34′ 8.342″ E
6152° 11′ 17.598″ N2° 11′ 28.667″ E152° 21′ 53.636″ N2° 34′ 13.872″ E
6252° 11′ 17.518″ N2° 11′ 27.893″ E252° 21′ 25.053″ N2° 34′ 13.842″ E
6352° 11′ 17.415″ N2° 11′ 27.126″ E352° 25′ 31.270″ N2° 34′ 8.916″ E
6452° 12′ 22.845″ N2° 11′ 9.965″ E452° 21′ 19.547″ N2° 31′ 49.797″ E
6552° 12′ 27.654″ N2° 10′ 3.953″ E552° 21′ 19.145″ N2° 31′ 2.229″ E
6652° 10′ 22.645″ N2° 5′ 24.993″ E652° 21′ 19.716″ N2° 30′ 12.848″ E
6752° 10′ 22.513″ N2° 5′ 24.211″ E752° 23′ 26.292″ N2° 30′ 2.994″ E
6852° 10′ 22.357″ N2° 5′ 23.442″ E852° 23′ 25.515″ N2° 30′ 1.705″ E
6952° 10′ 22.176″ N2° 5′ 22.686″ E952° 23′ 24.756″ N2° 30′ 0.388″ E
7052° 11′ 6.526″ N2° 2′ 15.690″ E1052° 23′ 24.016″ N2° 29′ 59.042″ E
7152° 9′ 32.963″ N2° 2′ 11.440″ E1152° 23′ 23.294″ N2° 29′ 57.670″ E
7252° 8′ 46.527″ N1° 57′ 45.569″ E1252° 23′ 22.592″ N2° 29′ 56.270″ E
7352° 8′ 46.517″ N1° 57′ 45.508″ E1352° 21′ 19.237″ N2° 29′ 57.051″ E
7452° 9′ 40.842″ N1° 57′ 7.198″ E1452° 23′ 21.910″ N2° 29′ 54.846″ E
7552° 8′ 11.619″ N1° 54′ 29.428″ E1552° 23′ 21.248″ N2° 29′ 53.395″ E
7652° 9′ 37.650″ N1° 53′ 5.293″ E1652° 23′ 20.606″ N2° 29′ 51.921″ E
7752° 8′ 11.641″ N1° 52′ 54.353″ E1752° 23′ 19.985″ N2° 29′ 50.423″ E
7852° 8′ 11.629″ N1° 52′ 53.580″ E1852° 23′ 19.385″ N2° 29′ 48.903″ E
7952° 8′ 11.594″ N1° 52′ 52.809″ E1952° 23′ 18.807″ N2° 29′ 47.360″ E
8052° 8′ 11.536″ N1° 52′ 52.041″ E2052° 23′ 18.250″ N2° 29′ 45.797″ E
8152° 8′ 11.455″ N1° 52′ 51.279″ E2152° 23′ 17.715″ N2° 29′ 44.213″ E
8252° 8′ 11.351″ N1° 52′ 50.524″ E2252° 23′ 17.202″ N2° 29′ 42.609″ E
8352° 8′ 11.224″ N1° 52′ 49.779″ E2352° 21′ 17.285″ N2° 29′ 40.473″ E
8452° 8′ 11.075″ N1° 52′ 49.044″ E2452° 21′ 17.055″ N2° 29′ 38.731″ E
8552° 8′ 10.904″ N1° 52′ 48.323″ E2552° 19′ 10.175″ N2° 27′ 36.407″ E
8652° 8′ 10.711″ N1° 52′ 47.616″ E2652° 22′ 33.114″ N2° 27′ 20.941″ E
8752° 8′ 10.498″ N1° 52′ 46.925″ E2752° 18′ 50.889″ N2° 26′ 0.710″ E
8852° 8′ 10.264″ N1° 52′ 46.251″ E2852° 13′ 59.087″ N2° 25′ 25.766″ E
8952° 8′ 10.009″ N1° 52′ 45.598″ E2952° 13′ 58.494″ N2° 23′ 27.683″ E
9052° 8′ 33.339″ N1° 49′ 15.275″ E3052° 13′ 56.853″ N2° 23′ 2.476″ E
9152° 8′ 25.361″ N1° 48′ 48.294″ E3152° 20′ 22.815″ N2° 22′ 19.439″ E
9252° 7′ 42.887″ N1° 46′ 40.770″ E3252° 18′ 12.421″ N2° 21′ 12.115″ E
9352° 4′ 57.710″ N1° 44′ 58.279″ E3352° 18′ 15.739″ N2° 21′ 10.581″ E
9452° 5′ 44.773″ N1° 40′ 57.350″ E3452° 13′ 46.402″ N2° 19′ 32.631″ E
9552° 2′ 57.010″ N1° 36′ 33.019″ E052° 21′ 49.261″ N2° 44′ 44.274″ E
9652° 2′ 56.838″ N1° 36′ 32.348″ E152° 26′ 58.439″ N2° 44′ 31.396″ E
9752° 2′ 56.647″ N1° 36′ 31.690″ E252° 27′ 8.502″ N2° 35′ 52.305″ E
9852° 2′ 56.438″ N1° 36′ 31.048″ E352° 21′ 19.758″ N2° 35′ 44.827″ E

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources