The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:

  1. where the provision (Part, Chapter or section) has never come into force or;
  2. where the text of the provision is subject to change, but no date has yet been appointed by the appropriate person or body for those changes to come into force.

Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Railways (Interoperability) Regulations 2006. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 9:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

Prospective

Regulation 2(2)

SCHEDULE 9U.K.(This Schedule substantially reproduces, with minor modifications, the provisions of Annex VI to the High-Speed Directive and to the Conventional Directive)

This Atodlen has no associated Memorandwm Esboniadol

Commencement Information

I1Sch. 9 in force at 2.4.2006, see reg. 1(3)

VERIFICATION PROCEDURE FOR SUBSYSTEMSU.K.

INTRODUCTIONU.K.

1.  EC verification is the procedure whereby a notified body checks and certifies, at the request of a contracting entity or of its authorised representative established within the Community, that a subsystem:

  • complies with the High-Speed Directive or the Conventional Directive;

  • complies with the other regulations deriving from the Treaty, and

  • may be put into operation.

STAGESU.K.

2.  The subsystem is checked at each of the following stages:

  • overall design;

  • construction of subsystem, including, in particular, civil-engineering activities, constituent assembly, overall adjustment;

  • final testing of the subsystem.

CERTIFICATEU.K.

3.  The notified body responsible for EC verification draws up the certificate of conformity intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the EC declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.

TECHNICAL FILEU.K.

4.  The technical file accompanying the declaration of verification must be made up as follows:

  • for infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete;

  • for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.;

  • list of interoperability constituents, as referred to in Article 3 of the High-Speed Directive or Article 3 of the Conventional Directive, incorporated into the subsystem;

  • copies of the EC declarations of conformity or suitability for use with which the abovementioned constituents must be provided in accordance with Article 13 of the High-Speed Directive or Article 13 of the Conventional Directive and accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications;

  • the certificate from the notified body responsible for EC verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with the applicable Directive, and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.

MONITORINGU.K.

5.1  The aim of EC monitoring is to ensure that the obligations deriving from the technical file have been met during production of the subsystem.

5.2  The notified body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The contracting entity or its authorised representative within the Community must send it or have sent to it all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.

5.3  The notified body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the High-Speed Directive or Conventional Directive. It must provide those responsible for implementation with an audit report. It may require to be present at certain stages of the building operations.

5.4  In addition, the notified body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the notified body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.

SUBMISSIONU.K.

6.  The complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of conformity issued by the notified body responsible for verification of the subsystem in working order. The file must be attached to the EC declaration of verification which the contracting entity sends to the Safety Authority.

A copy of the file must be kept by the contracting entity throughout the service life of the subsystem. The file must be sent to any other Member State that requests a copy.

PUBLICATIONU.K.

7.  Each notified body must periodically publish relevant information concerning:

  • requests for EC verification received;

  • certificates of conformity issued;

  • certificates of conformity refused.

LANGUAGEU.K.

8.  The files and correspondence relating to the EC verification procedures must be written in English or in a language accepted by the contracting entity.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill