Chwilio Deddfwriaeth

The Environmental Permitting (England and Wales) Regulations 2016

Changes over time for: PART 2

 Help about opening options

Changes to legislation:

The Environmental Permitting (England and Wales) Regulations 2016, PART 2 is up to date with all changes known to be in force on or before 29 May 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

PART 2E+WExcluded flood risk activities

SECTION 1E+WIntroductory

1.—(1) The descriptions in this Part are set out in paragraphs 2 to 13, in their respective first sub-paragraphs.E+W

(2) The specific conditions relating to each description in this Part are set out in paragraphs 2 to 13, in their respective second sub-paragraphs.

(3) The general condition for the descriptions in paragraphs 3 to 13 of this Part is that the activity is not carried out in, or (where the activity is carried out in Wales) within 100 metres of, a water body in Wales that is part of a main river classified as of high morphological status by the NRBW in accordance with the relevant directions.

(4) For the purposes of paragraphs 3 and 4, “licensable marine activity” and “marine licence” have the same meaning as in Part 4 of the Marine and Coastal Access Act 2009 M1.

(5) For the purposes of this Part, “relevant directions” means the Water Framework Directive (Standards and Classification) Directions (England and Wales) 2015 M2.

Marginal Citations

M12009 c. 23; Part 4 was amended by section 76(2) of the Energy Act 2016 (c. 20) and by S.I. 2011/405, 1043, 1210, 2015/374, 664 and 2016/738. It is prospectively amended by sections 76 to 80 of the Environment (Wales) Act 2016 (anaw. 3) from a date to be appointed.

M2These Directions were made on 9th September 2015 in exercise of powers in section 40(2) of the 1995 Act and are available at http://www.legislation.gov.uk/uksi/2015/1623/pdfs/uksiod_20151623_en.pdf. A copy may be obtained from the Flood Risk Management Team, the Department for Environment, Food and Rural Affairs, Area 3C, Nobel House, 17 Smith Square, London SW1P 3JR.

SECTION 2E+WDescriptions and conditions

Emergency activityE+W

2.—(1) Any activity carried on in an emergency.

(2) For the purposes of this paragraph, the specific conditions are that—

(a)the activity is not a pre-planned emergency activity, and

(b)the person carrying on the activity provides the regulator with notice in writing as soon as practicable of the carrying on of the activity and the circumstances in which it was carried on.

(3) For the purposes of sub-paragraph (2)(a), a “pre-planned emergency activity” means any activity which has been planned in response to an emergency before it occurs.

(4) The power of the regulator to serve a remediation notice under paragraph 8 of Part 1 of this Schedule applies where an activity has been carried on in reliance on this exclusion as if that activity were an unauthorised activity.

A licensable marine activity in EnglandE+W

3.—(1) A licensable marine activity in England.

(2) For the purposes of this paragraph, the specific conditions are that—

(a)an application for a marine licence has been made in respect of that activity,

(b)the Agency has received notice that the application has been made,

(c)in view of the terms and conditions that will be included in the marine licence, the Agency considers that an environmental permit is not necessary, and

(d)a notice to that effect has been issued by the Agency to the applicant.

A licensable marine activity in WalesE+W

4.—(1) A licensable marine activity in Wales.

(2) For the purposes of this paragraph, the specific condition is that an application for a marine licence has been made in respect of that activity.

[F1Ladders, scaffold towers and other similar apparatus]E+W

5.—(1) The erection and use of ladders[F2, scaffold towers and other similar apparatus used for access, maintenance or repair] (“equipment”).

(2) For the purposes of this paragraph, the specific conditions are—

(a)the suitability of river conditions is reviewed by the operator each working day,

(b)the equipment is erected on each working day on which it is required, and

(c)the equipment is removed at the end of each working day and is stored outside the river and its banks.

Service crossings within an existing structureE+W

6.—(1) The construction and use of service crossings within an existing structure.

(2) For the purposes of this paragraph, the specific conditions are—

(a)the crossing is entirely within the original profile of the existing structure,

(b)the regulator has not sent a notification to the landowner that the structure has been identified for removal or modification in order to achieve the [F3environmental objectives in relation to a river basin district],

(c)equipment associated with the works is not stored on the bed or banks of the main river, and

(d)no works are carried out from the main river or from the banks of the main river.

Flood protection devices attached to buildingsE+W

7.—(1) The attachment of a flood protection device directly to a building in order to protect the interior of that building.

(2) For the purposes of this paragraph, the specific condition is that the flood protection provided by the device extends only to the building to which the device is fitted.

Minor works on or affecting bridges and culvertsE+W

8.—(1) The carrying out of minor works on or affecting bridges and culverts for highways and public rights of way (“minor works”).

(2) For the purposes of this paragraph, the specific conditions are—

(a)the minor works do not affect, or have the potential to affect, the bed, banks, water level, normal flow or flood flow in the main river,

(b)equipment associated with the minor works is not stored on the bed or banks of the main river, and

(c)no works are carried out from the main river or from the banks of the main river.

FencingE+W

9.—(1) The erection of fencing.

(2) For the purposes of this paragraph, the specific conditions are—

(a)the fencing is not located on the bed or banks of the main river, and

(b)the fencing is constructed of—

(i)post and rail,

(ii)post and wire mesh of at least 100 mm spacing, or

(iii)post and wire strands.

Fish trapsE+W

10.—(1) The temporary use of fish traps.

(2) For the purposes of this paragraph, the specific conditions are—

(a)the trap has dimensions of no greater than 2 metres x 1 metre x 0.75 metre,

(b)any trap, or combination of traps, placed in the main river is less than one third of the width of the channel,

(c)the trap is not used when the main river is in a condition of high flow, and

(d)the trap is located more than 50 metres upstream or downstream from any dam or other obstruction.

Notice boardsE+W

11.—(1) Erection of notice boards.

(2) For the purposes of this paragraph, the specific conditions are—

(a)the board is attached to existing fencing or freestanding, permanent posts,

(b)the board is more than 2 metres from any culvert, remote defence or flood defence structure on the main river and from any sea defence, and

(c)the board is more than 2 metres from the landward side of the bank.

Purpose-built sediment trapsE+W

12.—(1) Clearance of purpose-built sediment traps.

(2) For the purposes of this paragraph, the specific conditions are—

(a)only sand and silt is cleared from the trap,

(b)the works do not result in sand or silt being transmitted downstream, and

(c)where the sand and silt from the clearance is spread on the floodplain, it is spread to a depth of no more than 100mm and no closer than 8 metres from the landward side of either bank.

Site investigation boreholes and trial pitsE+W

13.—(1) Site investigation boreholes and trial pits within a flood plain.

(2) For the purposes of this paragraph, the specific conditions are—

(a)the works are more than 5 metres from any culvert, remote defence or flood defence structure on the main river and from any sea defence,

(b)the works are more than 8 metres from the banks of a non-tidal main river,

(c)the works are more than 16 metres from the banks of a tidal main river, and

(d)the works are completed, including refilling of the borehole or pit, within 48 hours.

Yn ôl i’r brig

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open yr Offeryn Cyfan

Yr Offeryn Cyfan you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

Y Rhestrau you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill