Commission Regulation (EU) No 1303/2014Show full title

Commission Regulation (EU) No 1303/2014 of 18 November 2014 concerning the technical specification for interoperability relating to ‘safety in railway tunnels’ of the rail system of the European Union (Text with EEA relevance) (revoked)

 Help about what version

What Version

More Resources

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Changes to legislation:

There are currently no known outstanding effects for the Commission Regulation (EU) No 1303/2014. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. Article 1.The technical specification for interoperability (TSI) relating to the ‘safety...

  3. Article 2.The TSI shall apply to the control-command and signalling, infrastructure,...

  4. Article 3.The technical and geographical scope of this Regulation is set...

  5. Article 4.(1) With regard to specific cases listed in Section 7.3...

  6. Article 5.(1) Member States shall notify to the Commission the following...

  7. Article 6.In accordance with Article 9(3) of Directive 2008/57/EC, each Member...

  8. Article 7.. . . . . . . . . ....

  9. Article 8.(1) In order to keep pace with technological progress, innovative...

  10. Article 9.Decision 2008/163/EC is repealed with effect from 1 January 2015....

  11. Article 10.This Regulation shall enter into force on the twentieth day...

  12. Signature

    1. ANNEX

      1. 1. INTRODUCTION

        1. 1.1. Technical scope

          1. 1.1.1. Scope related to tunnels

          2. 1.1.2. Scope related to rolling stock

          3. 1.1.3. Scope related to operational aspects

            1. 1.1.3.1. Operation of freight trains

          4. 1.1.4. Risk scope

            1. 1.1.4.1. Risks covered by this TSI

            2. 1.1.4.2. Risks not covered by this TSI

        2. 1.2 Geographical scope

      2. 2. DEFINITION OF ASPECT/SCOPE

        1. 2.1. General

        2. 2.2. The risk scenarios

          1. 2.2.1. ‘Hot’ incidents: Fire, explosion followed by fire, emission of toxic...

          2. 2.2.2. ‘Cold’ incidents: collision, derailment

          3. 2.2.3. Prolonged stop

          4. 2.2.4. Exclusions

        3. 2.3. The role of emergency response services

        4. 2.4. Definitions

      3. 3. ESSENTIAL REQUIREMENTS

        1. 3.1 Infrastructure and energy subsystems

        2. 3.2 Rolling stock subsystem

      4. 4. CHARACTERISATION OF THE SUBSYSTEM

        1. 4.1. Introduction

        2. 4.2. Functional and technical specifications of the subsystems

          1. 4.2.1. Subsystem Infrastructure

            1. 4.2.1.1. Prevent unauthorised access to emergency exits and technical rooms

            2. 4.2.1.2. Fire resistance of tunnel structures

            3. 4.2.1.3 Fire reaction of building material

            4. 4.2.1.4. Fire detection in technical rooms

            5. 4.2.1.5. Evacuation facilities

              1. 4.2.1.5.1 Safe area

              2. 4.2.1.5.2 Access to the safe area

              3. 4.2.1.5.3 Communication means in safe areas

              4. 4.2.1.5.4 Emergency lighting on escape routes

              5. 4.2.1.5.5 Escape signage

            6. 4.2.1.6. Escape walkways

            7. 4.2.1.7. Evacuation and rescue points

            8. 4.2.1.8. Emergency communication

            9. 4.2.1.9. Electricity supply for emergency response services

            10. 4.2.1.10. Reliability of electrical systems

            11. 4.2.1.11. Communication and lighting at switching locations

          2. 4.2.2. Subsystem Energy

            1. 4.2.2.1. Sectioning of contact line

            2. 4.2.2.2. Earthing of contact line

            3. 4.2.2.3. Electricity supply

            4. 4.2.2.4. Requirements for electrical cables in tunnels

            5. 4.2.2.5. Reliability of electrical installations

          3. 4.2.3. Subsystem rolling stock

            1. 4.2.3.1. Measures to prevent fire

              1. 4.2.3.1.1 Material requirements

              2. 4.2.3.1.2 Specific measures for flammable liquids

              3. 4.2.3.1.3 Hot axle box detection

            2. 4.2.3.2. Measures to detect and control fire

              1. 4.2.3.2.1 Portable fire extinguishers

              2. 4.2.3.2.2 Fire detection systems

              3. 4.2.3.2.3 Automatic fire fighting system for freight diesel units

              4. 4.2.3.2.4 Fire containment and control systems for passenger rolling stock

              5. 4.2.3.2.5 Fire containment and control systems for freight locomotives and freight...

            3. 4.2.3.3. Requirements related to emergencies

              1. 4.2.3.3.1. Emergency lighting system in the train

              2. 4.2.3.3.2 Smoke control

              3. 4.2.3.3.3. Passenger alarm and communication means

              4. 4.2.3.3.4 Running capability

            4. 4.2.3.4. Requirements related to evacuation

              1. 4.2.3.4.1 Passenger emergency exits

              2. 4.2.3.4.2 Driver's cab emergency exits

        3. 4.3. Functional and technical specifications of the interfaces

          1. 4.3.1. Interfaces with the Control-Command-Signalling subsystem

          2. 4.3.2. Interfaces with the Traffic Management and Operation subsystem

        4. 4.4. Operating rules

          1. 4.4.1. Emergency rule

          2. 4.4.2. Tunnel emergency plan

          3. 4.4.3. Exercises

          4. 4.4.4. Switching off and Earthing procedures

          5. 4.4.5. Provision of on-train safety and emergency information to passengers

          6. 4.4.6. Operational rules related to trains running in tunnels

        5. 4.5. Maintenance rules

          1. 4.5.1. Infrastructure

          2. 4.5.2. Maintenance of rolling stock

        6. 4.6. Professional qualifications

          1. 4.6.1. Tunnel specific competence of the train crew and other staff...

        7. 4.7. Health and safety conditions

          1. 4.7.1. Self-rescue device

        8. 4.8. Infrastructure and Rolling stock registers

          1. 4.8.1. Register of infrastructure

          2. 4.8.2. Rolling Stock Register

      5. 5. INTEROPERABILITY CONSTITUENTS

      6. 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS...

        1. 6.1. Interoperability constituents

        2. 6.2. Subsystems

          1. 6.2.1. EC verification (general)

          2. 6.2.2. Procedures for EC verification of a subsystem (modules)

          3. 6.2.3. Existing solutions

          4. 6.2.4. Innovative solutions

          5. 6.2.5. Assessment of maintenance

          6. 6.2.6. Assessment of conformity to the Safety requirements applying to the...

          7. 6.2.7. Additional requirements for assessment of specifications concerning the IM

            1. 6.2.7.1.

            2. 6.2.7.2. Fire resistance of tunnel structures

            3. 6.2.7.3. Fire reaction of building material

            4. 6.2.7.4. Facilities for self-rescue, rescue and evacuation in the event of...

            5. 6.2.7.5. Emergency lighting in upgraded/renewed tunnels

            6. 6.2.7.6. Reliability of electrical systems

          8. 6.2.8. Additional requirements for assessment of specifications concerning the RU

            1. 6.2.8.1. Self-rescue device

      7. 7. IMPLEMENTATION

        1. 7.1. Application of this TSI to new subsystems

          1. 7.1.1. General

          2. 7.1.2. New rolling stock

          3. 7.1.3. New Infrastructure

        2. 7.2. Application of this TSI to subsystems already in service

          1. 7.2.1. Upgrade or renewal of rolling stock

          2. 7.2.2. Upgrade and renewal measures for tunnels

            1. 7.2.2.1. Upgrade or renewal of a tunnel

            2. 7.2.2.2. Extension of a tunnel

          3. 7.2.3. Operation subsystem

          4. 7.2.4. Operation of new rolling stock in existing tunnels

        3. 7.3. Specific cases

          1. 7.3.1. General

            1. (1) The specific cases, as listed in the following clause, describe...

            2. (2) These specific cases are classified as:

            3. (3) Any specific case applicable to rolling stock within the scope...

          2. 7.3.2. Operational rules related to trains running in tunnels (clause 4.4.6)...

            1. 7.3.2.1 Specific case Italy ( ‘ T0 ’ )

            2. 7.3.2.2 Specific case Channel Tunnel ( ‘ P ’ )

      8. Appendix A

        Standards or Normative Documents Referred to in this TSI

      9. Appendix B

        Assessment of the Subsystems

        1. For rolling stock, the sub-system characteristics that must be assessed...

        2. For infrastructure and energy, the sub-system characteristics that must be...

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources