Search Legislation

Commission Regulation (EU) No 1305/2014Show full title

Commission Regulation (EU) No 1305/2014 of 11 December 2014 on the technical specification for interoperability relating to the telematics applications for freight subsystem of the rail system in the European Union and repealing the Regulation (EC) No 62/2006 (Text with EEA relevance) (revoked)

 Help about what version

What Version

More Resources

Close

This is a legislation item that originated from the EU

After exit day there will be three versions of this legislation to consult for different purposes. The legislation.gov.uk version is the version that applies in the UK. The EU Version currently on EUR-lex is the version that currently applies in the EU i.e you may need this if you operate a business in the EU.

The web archive version is the official version of this legislation item as it stood on exit day before being published to legislation.gov.uk and any subsequent UK changes and effects applied. The web archive also captured associated case law and other language formats from EUR-Lex.

Changes to legislation:

There are currently no known outstanding effects for the Commission Regulation (EU) No 1305/2014. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. Article 1.Subject matter

  3. Article 2.Scope

  4. Article 3.Update and reporting on technical documents

  5. Article 4.Compliance with networks in non-EU countries

  6. Article 5.Implementation

  7. Article 6.Repeal

  8. Article 7.Entry into force and application

  9. Signature

    1. ANNEX

      1. 1. INTRODUCTION

        1. 1.1. Abbreviations

        2. 1.2. Reference Documents

        3. 1.3. Technical scope

        4. 1.4. Geographical Scope

        5. 1.5. Content of this TAF TSI

      2. 2. DEFINITION OF SUBSYSTEM AND SCOPE

        1. 2.1. Function within the scope of the TSI

        2. 2.2. Functions outside the scope of the TSI

        3. 2.3. Overview of the subsystem description

          1. 2.3.1. Involved Entities

          2. 2.3.2. Considered Processes

          3. 2.3.3. General remarks

      3. 3. ESSENTIAL REQUIREMENTS

        1. 3.1. Compliance with the essential requirements

        2. 3.2. Essential requirements aspects

        3. 3.3. Aspects relating to general requirements

          1. 3.3.1. Safety

          2. 3.3.2. Reliability and availability

          3. 3.3.3. Health

          4. 3.3.4. Environmental protection

          5. 3.3.5. Technical compatibility

        4. 3.4. Aspects relating specifically to the Telematics Applications Subsystem for Freight...

          1. 3.4.1. Technical compatibility

          2. 3.4.2. Reliability and availability

          3. 3.4.3. Health

          4. 3.4.4. Safety

      4. 4. CHARACTERISATION OF THE SUBSYSTEM

        1. 4.1. Introduction

        2. 4.2. Functional and technical specifications of the subsystem

          1. 4.2.1. Consignment Note data

            1. 4.2.1.1. Customer Consignment Note

            2. 4.2.1.2. Consignment orders

          2. 4.2.2. Path Request

            1. 4.2.2.1. Preliminary remarks

            2. 4.2.2.2. Path Request message

            3. 4.2.2.3. Path Details message

            4. 4.2.2.4. Path Confirmed message

            5. 4.2.2.5. Path Details Refused message

            6. 4.2.2.6. Path Cancelled message

            7. 4.2.2.7. Path Not Available message

            8. 4.2.2.8. Receipt Confirmation message

          3. 4.2.3. Train Preparation

            1. 4.2.3.1. General Remarks

            2. 4.2.3.2. Train Composition message

            3. 4.2.3.3. Train Ready message

          4. 4.2.4. Train Running Forecast

            1. 4.2.4.1. General Remarks

            2. 4.2.4.2. Train Running Forecast message

            3. 4.2.4.3. Train Running Information message and Train Delay Cause Message.

          5. 4.2.5. Service Disruption Information

            1. 4.2.5.1. General Remarks

            2. 4.2.5.2. Train Running Interruption message

          6. 4.2.6. Shipment ETI/ETA

            1. 4.2.6.1. Preliminary remark

            2. 4.2.6.2. ETI/ETA calculation

            3. 4.2.6.3. Wagon ETI/ETA message

            4. 4.2.6.4. Alert message

          7. 4.2.7. Wagon Movement

            1. 4.2.7.1. Preliminary Remarks

            2. 4.2.7.2. Wagon Release Notice message

            3. 4.2.7.3. Wagon Departure Notice message

            4. 4.2.7.4. Wagon Yard Arrival message

            5. 4.2.7.5. Wagon Yard Departure message

            6. 4.2.7.6. Wagon Exception message

            7. 4.2.7.7. Wagon Arrival Notice message

            8. 4.2.7.8. Wagon Delivery notice message

          8. 4.2.8. Interchange Reporting

            1. 4.2.8.1. Preliminary remark

            2. 4.2.8.2. Wagon Interchange Notice message

            3. 4.2.8.3. Wagon Interchange Sub Notice message

            4. 4.2.8.4. Wagon Received at Interchange message

            5. 4.2.8.5. Wagon Refused at Interchange message

          9. 4.2.9. Data Exchange for Quality Improvement

          10. 4.2.10. The Main Reference Data

            1. 4.2.10.1. Preface

            2. 4.2.10.2. The Rolling Stock Reference Databases

            3. 4.2.10.3. The Rolling Stock Operational Data

          11. 4.2.11. Various Reference Files and Databases

            1. 4.2.11.1. Reference Files

            2. 4.2.11.2. Other Databases

              1. Wagon and Intermodal unit Operational Database

              2. Wagon Trip Plan Databases

                1. Remark:

            3. 4.2.11.3. Additional Requirements on the Databases

              1. Remarks:

          12. 4.2.12. Networking & Communication

            1. 4.2.12.1. General Architecture

            2. 4.2.12.2. Network

            3. 4.2.12.3. Security

            4. 4.2.12.4. Encryption

            5. 4.2.12.5. Central Repository

            6. 4.2.12.6. Common Interface

        3. 4.3. Functional and technical specifications of the interfaces

          1. 4.3.1. Interfaces with the TSI Infrastructure

          2. 4.3.2. Interfaces with the TSI Control/Command and Signalling

          3. 4.3.3. Interfaces with the rolling stock subsystem

          4. 4.3.4. Interfaces with the TSI operation and traffic management

          5. 4.3.5. Interfaces with the Telematics Applications for Passenger Services

        4. 4.4. Operating rules

          1. 4.4.1. Data quality

            1. Accuracy:

            2. Completeness:

            3. Consistency:

            4. Timeliness:

            5. Data quality Metrics

          2. 4.4.2. Operating the central repository

        5. 4.5. Maintenance rules

        6. 4.6. Professional qualifications

        7. 4.7. Health and safety conditions

      5. 5. INTEROPERABILITY CONSTITUENTS

        1. 5.1. Definition

        2. 5.2. List of Constituents

        3. 5.3. Constituents' Performances and Specifications

      6. 6. ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS...

        1. 6.1. Interoperability Constituents

          1. 6.1.1. Assessment Procedures

          2. 6.1.2. Module

          3. 6.1.3. Subsystem Telematics Applications for Freight

      7. 7. IMPLEMENTATION

        1. 7.1. Modalities of Application of this TSI

          1. 7.1.1. Introduction

          2. 7.1.2. Phase one — detailed IT specifications and master plan

          3. 7.1.3. Phases 2 and 3 — Development and deployment

          4. 7.1.4. Governance, roles and responsibilities

            1. The Steering Committee

            2. The Stakeholders

            3. The Representative Bodies

        2. 7.2. Change Management

          1. 7.2.1. Change Management Process

          2. 7.2.2. Specific Change Management Process for documents listed in Appendix I...

      8. Appendix I

        1. List of technical documents

      9. Appendix II

        Glossary

      10. Appendix III

        Tasks to be undertaken by the TAF/TAP National Contact Point (NCP)

        1. (1) Act as point of contact between ERA, the TAF/TAP Steering...

        2. (2) Communicate the concerns and issues of the railway players in...

        3. (3) Liaise with the Member State Railway Interoperability and Safety Committee...

        4. (4) The Member State ensures that all licensed Railway Undertakings and...

        5. (5) To the extent that railway players in the Member State...

        6. (6) Work with the Member State to ensure that an entity...

        7. (7) Facilitate information sharing between the Member States' railway players (Infrastructure...

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the EU Official Journal
  • lists of changes made by and/or affecting this legislation item
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different versions taken from EUR-Lex before exit day and during the implementation period as well as any subsequent versions created after the implementation period as a result of changes made by UK legislation.

The dates for the EU versions are taken from the document dates on EUR-Lex and may not always coincide with when the changes came into force for the document.

For any versions created after the implementation period as a result of changes made by UK legislation the date will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. For further information see our guide to revised legislation on Understanding Legislation.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as adopted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources