The Renewables Obligation (Scotland) Amendment Order 2014

 Help about what version

What Version

  • Draft legislation
 Help about opening options

Opening Options

Draft Legislation:

This is a draft item of legislation and has not yet been made as a Scottish Statutory Instrument. This draft has been replaced by a new draft, The Renewables Obligation (Scotland) Amendment Order 2015 ISBN 978-0-11-102947-3

Information to be provided to the Authority where electricity is generated from biomass

This section has no associated Policy Notes

16.—(1) Article 54(1) is amended as follows.

(2) In paragraph (1)(a), for “waste, biomass wholly derived from waste” substitute “municipal waste”.

(3) For paragraphs (2) and (3) substitute—

(2) In relation to each consignment of biomass (other than landfill gas, sewage gas or municipal waste) used in a generating station to which this article applies, the operator of the station must, by the 30th June immediately following the obligation period during which the biomass is used (“the relevant date”), provide the Authority with—

(a)the information specified in paragraph (3);

(b)other than in the case of biomass which was gas formed by the anaerobic digestion of material which was—

(i)excreta produced by animals; or

(ii)waste,

the information specified in paragraph (3ZA); and

(c)other than in the case of biomass which was—

(i)bioliquid;

(ii)excreta produced by animals;

(iii)waste; or

(iv)wholly derived from waste;

the information specified in paragraph (3ZB).

(3) The information specified in this paragraph is information identifying, to the best of the operator’s knowledge and belief—

(a)the material from which the biomass was composed;

(b)where the biomass was solid and can take different forms, the form of the biomass;

(c)whether the biomass was waste or wholly derived from waste;

(d)whether the biomass was excreta produced by animals;

(e)where the biomass was plant matter or derived from plant matter, the country where the plant matter was grown; and

(f)where the information specified in sub-paragraph (e) is not known or the biomass was not plant matter or derived from plant matter, the country from which the operator obtained the biomass.

(3ZA) The information specified in this paragraph is information identifying, to the best of the operator’s knowledge and belief—

(a)where the biomass was solid, its mass (in tonnes);

(b)where the biomass was liquid, its volume (in litres) when measured at 25 degrees Celsius and 0.1 megapascals;

(c)where the biomass was gas, its volume (in cubic metres) when measured at 25 degrees Celsius and 0.1 megapascals;

(d)where the biomass was an energy crop and was not a bioliquid—

(i)the type of energy crop in question; and

(ii)the use of the land on which the biomass was grown in the year before the land was first used to grown energy crops; and

(e)where the biomass was wood or derived from wood and was not waste or bioliquid—

(i)the name of the forest or other location where that wood was grown;

(ii)a description of the forestry management practices or land management practices used in the forest or other location where that wood was grown;

(iii)the species of wood in question; and

(iv)the proportion of the biomass (if any) that was composed of, or derived from, saw logs.

(3ZB) The information specified in this paragraph is information identifying, to the best of the operator’s knowledge and belief—

(a)the greenhouse gas emissions from the use of the biomass to generate one megajoule of electricity;

(b)where the biomass was wood or derived from wood—

(i)whether the biomass met the timber standard or an equivalent standard; and

(ii)where the biomass did not meet the timber standard or an equivalent standard, the main reasons why biomass meeting the timber standard or an equivalent standard was not used;

(c)where the biomass was not wood or derived from wood—

(i)whether the biomass met the land criteria; and

(ii)where the biomass did not meet the land criteria, the main reasons why biomass meeting the land criteria was not used;

(d)where—

(i)the biomass was used in a post-2013 dedicated biomass station, and

(ii)the greenhouse gas emissions from the use of the biomass to generate one megajoule of electricity were greater than 66.7 grams,

the main reasons why biomass with lower greenhouse gas emissions was not used;

(e)where—

(i)the biomass was used in a generating station other than a post-2013 dedicated biomass station; and

(ii)the greenhouse gas emissions from the use of the biomass to generate one megajoule of electricity were greater than 79.2 grams,

the main reasons why biomass with lower greenhouse gas emissions was not used; and

(f)where the biomass was wood or derived from wood and any of the information specified in sub-paragraphs (a) and (b)(i) is not known or where the biomass was not wood or derived from wood and any of the information specified in sub-paragraphs (a) and (c)(i) is not known—

(i)the main reasons why that information is not known; and

(ii)the main reasons why biomass for which that information is known was not used..

(4) In paragraph (3A), for “paragraph (3)(l)” substitute “paragraph (3ZB)(a)”.

(5) In paragraph (3B), before sub-paragraph (a) insert—

(za)the biomass was used in a generating station with a total installed capacity of less than 1 megawatt;.

(6) For paragraph (4) substitute—

(4) Where, in relation to biomass used in a generating station to which this article applies, the operator of the station fails to provide the Authority with the information required by paragraph (2) by the relevant date, the Authority must, in relation to any SROCs to which the operator would otherwise be entitled, postpone the issue of those SROCs (up to the specified number) until such time as the information is provided..

(7) In paragraph (5), for “specified in paragraph (3)” substitute “required by paragraph (2)”.

(8) In paragraph (6)—

(a)after the definition of “default value method” omit “and”; and

(b)for the definition of “environmental quality assurance scheme” substitute—

“post-2013 dedicated biomass station” means a generating station which—

(a)

was not accredited on or before 31st March 2013; and

(b)

has, in any month after March 2013, generated electricity in the way described as “dedicated biomass” in Schedule 2;

“saw logs” means wood which formed part of the trunk of a tree which grew for at least 10 years;

“timber standard” means the Timber Standard for Heat & Electricity: woodfuel used under the Renewable Heat Incentive and Renewables Obligation published by the Department of Energy and Climate Change on 10th February 2014(2); and

“waste” does not include excreta produced by animals..

(1)

Article 54 was amended by S.S.I. 2010/147, S.S.I. 2011/225 and S.S.I. 2013/166.

(2)

Copies can be obtained from the Department of Energy and Climate Change and are available at https://www.gov.uk/government/publications/timber-standard-for-heat-electricity.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Draft Policy Note

Draft Policy Note sets out a brief statement of the purpose of a Draft Scottish Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Draft Scottish Statutory Instrument accessible to readers who are not legally qualified and accompany any Scottish Statutory Instrument or Draft Scottish Statutory Instrument laid before the Scottish Parliament from July 2012 onwards. Prior to this date these type of notes existed as 'Executive Notes' and accompanied Draft Scottish Statutory Instruments from July 2005 until July 2012.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as draft version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources