The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.
Area | Number of land shown on deposited plans | Purpose for which land may be acquired or used |
---|---|---|
London Borough of Camden | 4, 13, 79a, 99 | Provision of worksite and access for construction |
Diversion or installation of, or works to, utilities apparatus | ||
68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051 | Diversion or installation of, or works to, utilities apparatus | |
78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22 | Provision of worksite and access for construction | |
140a, 142 | Provision of worksite and access for construction | |
Diversion or installation of, or works to utilities apparatus | ||
Installation of ground anchors | ||
90, 151 to 154, 157, 159, 177, 180, 181 | Installation of ground anchors | |
363 | Provision of electricity supply system and access | |
434 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
AP3-5 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
London Borough of Brent | 28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15 | Diversion or installation of, or works to, utilities apparatus |
53a, 54a, AP4-6, AP4-10 | Provision of worksite and access for construction | |
Royal Borough of Kensington & Chelsea | 1 to 3 | Provision of worksite and access for construction |
Provision and renewal of railway systems for operational purposes and drainage | ||
16, 19 | Diversion or installation of, or works to, utilities apparatus | |
London Borough of Hammersmith & Fulham | 5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11 | Provision of worksite and access for construction |
12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76 | Diversion or installation of, or works to, utilities apparatus | |
77 | Provision of environmental mitigation | |
AP4-1 | Provision of worksite and access for construction and maintenance | |
London Borough of Ealing | 5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949 | Provision of worksite and access for construction |
Diversion or installation of, or works to, utilities apparatus | ||
20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17 | Provision of worksite and access for construction | |
103, 106 | Provision of worksite and access for construction | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Diversion or installation of, or works to, utilities apparatus | ||
119, 121, 150, 151, 157, 158, 165 | Provision of worksite and access for construction | |
Reinstatement of businesses or facilities | ||
Diversion or installation of, or works to, utilities apparatus | ||
133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus | |
213 | Provision and renewal of railway systems for operational purposes and drainage | |
454 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
AP4-1 | Reinstatement of businesses or facilities | |
London Borough of Hillingdon | 1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14 | Diversion or installation of, or works to, utilities apparatus |
25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39 | Provision of environmental mitigation | |
25a, 470, 494b | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
50, 51 | Provision of access for construction and maintenance of utility diversions | |
101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
377, 379, 411, 414, 415, 535 | Provision of worksite and access for construction | |
412, 413, 416 to 419, AP4-26 | Provision of worksite and access for construction and maintenance | |
424, 425, 460, 536, 540, AP4-17 to AP4-19 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
465a, 511 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
474 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
496a, 498, 499, 526 to 534 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
Diversion and installation of overhead electric lines | ||
501, 507 | Diversion and installation of overhead electric lines | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
510, AP4-21 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
545 | Diversion and installation of overhead electric lines | |
Provision of worksite and access for construction and maintenance | ||
548, 550, 556 to 558, 563, AP2-1 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
562 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
564, 590b, AP2-3, AP2-4 | Diversion and installation of overhead electric lines | |
606, 614, 615, 618 | Provision of worksite and access for construction and maintenance | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Provision of new public right of way | ||
Diversion and installation of overhead electric lines | ||
Diversion or installation of, or works to, utilities apparatus | ||
611, 613 | Provision of worksite and access for construction and maintenance | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
612 | Provision of worksite and access for construction and maintenance | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Diversion or installation of, or works to, utilities apparatus | ||
616 | Provision of worksite and access for construction and maintenance | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
496, 654, 655 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
496a, 498 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion and installation of overhead electric lines | ||
557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720c | Diversion and installation of overhead electric lines | |
558 | Provision of worksite and access for construction and maintenance | |
Diversion and installation of overhead electric lines | ||
565 | Diversion and installation of overhead electric lines | |
Provision of electricity supply system and access | ||
566 to 568 | Provision of access for construction and maintenance of utility diversions | |
Provision of electricity supply system and access | ||
603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789 | Provision of environmental mitigation | |
621 | Provision of balancing pond and associated works and access for maintenance | |
Provision of electricity supply system and access | ||
Provision of new public right of way | ||
622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738 | Diversion or installation of, or works to, utilities apparatus | |
633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783 | Provision of worksite and access for construction and maintenance | |
642, 758 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
663, 672 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
692 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Provision of electricity supply system and access | ||
Provision of flood mitigation measures | ||
Provision of new public right of way | ||
Diversion and installation of overhead electric lines | ||
726, 731, 734, 740, 745, 746 | Provision of worksite and access for construction | |
751, 755 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
759 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
AP2-5, AP2-6 | Provision of access for construction and maintenance | |
AP4-40 to AP4-42 | Reinstatement of businesses or facilities | |
County of Buckinghamshire, District of South Bucks,Parish of Iver | AP2-1, AP2-3 | Provision and renewal of railway systems for operational purposes and drainage |
AP2-9 to AP2-11, AP2-14, AP2-15 | Provision of worksite and access for construction | |
Borough of Slough | AP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34 | Provision of worksite and access for construction |
AP2-12, AP2-26 | Provision and renewal of railway systems for operational purposes and drainage | |
AP2-13, AP2-20 | Provision of worksite and access for construction | |
Provision and renewal of railway systems for operational purposes and drainage | ||
AP2-17, AP2-22, AP2-23, AP2-28 | Provision of worksite and access for construction | |
Provision of flood mitigation measures | ||
AP2-35 | Provision of access for construction and maintenance of utility diversions | |
AP2-37 | Diversion or installation of, or works to, utilities apparatus | |
County of Buckinghamshire District of South Bucks Parish of Denham | 1, 2 | Provision of flood mitigation measures |
1d, 1f | Diversion and installation of overhead electric lines | |
11, 17, 19, 32 | Provision of environmental mitigation | |
25, 26, 28 to 31, 33, 46, 52 | Provision of worksite and access for construction | |
14, 15, 23, 27 | Provision of balancing pond and associated works and access for maintenance | |
26 | Provision of worksite and access for construction | |
34 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
42, 43 | Diversion or installation of, or works to, utilities apparatus | |
37 to 39, 47 to 49, AP2-3 | Provision of access for construction and maintenance | |
AP4-1, AP4-2, AP4-4 to AP4-9 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
Parish of Wexham | AP4-1 | Provision of environmental mitigation |
County of Hertfordshire District of Three Rivers | 5 | Provision of environmental mitigation |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104 | Provision of worksite and access for construction | |
12 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
23, 53, 80 | Provision of balancing pond and associated works and access for maintenance | |
32, 36, 37 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
40, 46, 61, 63, 64 | Provision of drainage and associated works | |
49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17 | Provision of environmental mitigation | |
75 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
107, 109 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of electricity supply system and access | ||
Diversion and installation of overhead electric lines | ||
116 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
10 | Diversion or installation of, or works to, utilities apparatus | |
AP4-18 | Reinstatement of businesses or facilities | |
County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter | 1, 7, 21, 30, 31, 35 | Provision of worksite and access for construction |
16 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
19 | Diversion and installation of overhead electric lines | |
70, 75, 76, 83, 85 | Provision of environmental mitigation | |
Parish of Chalfont St Giles | 4 to 6 | Provision of environmental mitigation |
131 | Provision of worksite and access for construction | |
134, 135, 139, 141, 142, 147 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Parish of Amersham | 7, 22, 24, 28, 34, 37 | Diversion or installation of, or works to, utilities apparatus |
Provision of worksite and access for construction and maintenance | ||
10 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
27 | Diversion or installation of, or works to, utilities apparatus | |
31 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
59, 66, 67, 74, 76, 77 | Provision of protective works to watercourse | |
Parish of Coleshill | 4 | Provision of environmental mitigation |
8 | Diversion or installation of, or works to, utilities apparatus | |
Parish of Little Missenden | 2 to 4 | Provision of protective works to watercourse |
11, 16 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
14 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction and maintenance | ||
15, 17, 19, 20 | Diversion or installation of, or works to, utilities apparatus | |
AP2-2, AP2-3 | Provision of new public right of way | |
Parish of Great Missenden | 142, 158, 174, 178, AP4-55, AP4-56 | Provision of environmental mitigation |
135 to 137 | Provision of drainage and associated works | |
155, 184 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
AP4-80, AP4-81 | Provision of environmental mitigation | |
Provision of new public right of way | ||
170, 171 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74 | Diversion and installation of overhead electric lines | |
173, 179, 188, 189 | Diversion or installation of, or works to, utilities apparatus | |
112, 117 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
Diversion or installation of, or works to, utilities apparatus | ||
157, 159 to 161, 163, 167, AP4-15 | Provision of worksite and access for construction | |
128, 139 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
138, 147 | Diversion and installation of overhead electric lines | |
166 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion and installation of overhead electric lines | ||
162a, 162b | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
180, AP4-51, AP4-52, AP4-75 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
AP2-2 | Provision of balancing pond and associated works and access for maintenance | |
AP4-54, AP4-78 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
AP4-57 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion and installation of overhead electric lines | ||
Provision of new public right of way | ||
AP4-58, AP4-69, AP4-70 | Provision of worksite and access for construction and maintenance | |
Provision of drainage and associated works | ||
AP4-65 | Provision of balancing pond and associated works and access for maintenance | |
AP4-67 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
AP4-68 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion and installation of overhead electric lines | ||
Parish of The Lee | 2, 42 to 45 | Provision of environmental mitigation |
5, 22, 24, 28, 34 | Reprofiling of ground | |
8, 9, 26 | Provision of worksite and access for construction | |
Reprofiling of ground | ||
11, 12, 18, 19, 31 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
16 | Diversion and installation of overhead electric lines | |
27 | Provision of environmental mitigation | |
Reprofiling of ground | ||
Diversion or installation of, or works to, utilities apparatus | ||
32 | Provision of environmental mitigation | |
Reprofiling of ground | ||
36 | Reprofiling of ground | |
Provision of worksite and access for construction and maintenance | ||
39, 40 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
AP2-1 | Provision of access for construction | |
District of Aylesbury Vale Parish of Wendover | 1, 3, 14, 48, 150, 153, 233 | Provision of environmental mitigation |
Diversion and installation of overhead electric lines | ||
5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220 | Provision of drainage and associated works | |
7, 251a | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257 | Provision of environmental mitigation | |
18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224 | Provision of worksite and access for construction | |
24 | Provision of drainage and associated works | |
Diversion or installation of, or works to, utilities apparatus | ||
29 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
31 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Provision of drainage and associated works | ||
32, 58, 108, 109, 142, 212, 214, 223, 241 | Diversion and installation of overhead electric lines | |
34, 55, 94, 124, 204 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
Provision of worksite and access for construction | ||
35, 169, 172, 185, 205, 206 | Diversion or installation of, or works to, utilities apparatus | |
38 to 41, 52, 96, 103, 110, 111 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
47, 56, 62, 63, 165, 211, 235 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
54 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
61, 221 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
64 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Provision of drainage and associated works | ||
91, 213, 215 | Provision of drainage and associated works | |
Diversion or installation of, or works to, utilities apparatus | ||
95 | Provision of worksite and access for construction and maintenance | |
100 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Diversion and installation of overhead electric lines | ||
135, 136 | Provision of balancing pond and associated works and access for maintenance | |
Diversion and installation of overhead electric lines | ||
156, 159, 217 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
171 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
173 | Installation of ground anchors | |
203 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
Diversion and installation of overhead electric lines | ||
219 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Provision of drainage and associated works | ||
Diversion and installation of overhead electric lines | ||
230 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
AP1-11 | Provision of environmental mitigation | |
Provision of worksite and access for construction and provision of balancing pond and associated works | ||
Access for maintenance | ||
AP2-1 | Provision of balancing pond and associated works and access for maintenance | |
AP2-3a | Minor highway alterations | |
AP2-4 | Reinstatement of businesses or facilities | |
District of Wycombe Parish of Ellesborough | 2 | Provision of drainage and associated works |
Diversion or installation of, or works to, utilities apparatus | ||
4, 15, 74 | Provision of worksite and access for construction | |
5 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
10 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
13, 17, 32, 33 | Diversion or installation of, or works to, utilities apparatus | |
34, 44, 66, 70 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2 | Provision of environmental mitigation | |
50, 51, 54 to 57 | Provision of flood mitigation measures | |
52 | Provision of worksite and access for construction and maintenance | |
53, 61 to 64, 71, 72 | Provision of drainage and associated works | |
69, 80 | Diversion and installation of overhead electric lines | |
11, 12 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
AP4-1 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
District of Aylesbury Vale Parish of Stoke Mandeville | 4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161 | Provision of environmental mitigation |
6, 69, 113 | Provision of worksite and access for construction and maintenance | |
8, 9, 94, 95, 120 | Provision of flood mitigation measures | |
10 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
18 | Provision of worksite and access for construction and maintenance | |
Provision of new public right of way | ||
22, 48, 56, 122, 132, 144 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
24, 59, 63, 116, 149, 151 | Provision of worksite and access for construction | |
25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141 | Diversion or installation of, or works to, utilities apparatus | |
28 | Provision of balancing pond and associated works and access for maintenance | |
43, 84, 103, 129 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
61 | Diversion or installation of, or works to, utilities apparatus | |
Provision of new public right of way | ||
62 | Provision of drainage and associated works | |
74, 92, 93, 152 | Provision of drainage and associated works | |
Provision of environmental mitigation | ||
83, AP2-2 | Provision of new public right of way | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of environmental mitigation | ||
118 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
119 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
123, 131, 134, AP1-3, AP1-4, 150 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
126 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
146 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction and maintenance | ||
District of Wycombe Parish of Great and Little Kimble cum Marsh | 1 | Provision of drainage and associated works |
3, 7, 9 | Provision of worksite and access for construction | |
District of Aylesbury Parish of Stone with Bishopstone and Hartwell | 6, 65, 86 | Diversion or installation of, or works to, utilities apparatus |
17, 18, 23, 32 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
27, 29, 30, 37, 69, 79, 81 | Provision of environmental mitigation | |
28, 28b | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
33 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
35 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
36 | Provision of environmental mitigation | |
Provision of access for construction and maintenance | ||
39 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
Provision of access for construction and maintenance | ||
40 | Provision of worksite and access for construction and maintenance | |
44, 46, 53, 57, 59 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
45 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction and maintenance | ||
47 | Provision of worksite and access for construction | |
Provision of a turning head | ||
48, 85, 90 | Provision of worksite and access for construction | |
51, 55 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
60 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of a turning head | ||
61, 72 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
66a, 66b, 71b, 73b | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of environmental mitigation | ||
Provision of drainage and associated works | ||
Provision of flood mitigation measures | ||
74a, 75, 89 | Provision of flood mitigation measures | |
76a | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
87 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of flood mitigation measures | ||
88 | Provision of flood mitigation measures | |
Provision of drainage and associated works | ||
AP4-2 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
Parish of Aylesbury | 1 | Provision of environmental mitigation |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
6, 18 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
20 to 22, 24 | Provision of environmental mitigation | |
Parish of Coldharbour | 2 to 7, 10, 11 | Provision of environmental mitigation |
Parish of Fleet Marston | 4 | Provision of worksite and access for construction and maintenance |
5, 11 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
6, 7 | Diversion or installation of, or works to, utilities apparatus | |
8, 9 | Provision of flood mitigation measures | |
10 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
13, 26 | Provision of environmental mitigation | |
14, 18, 30 | Provision of drainage and associated works | |
15, 21 | Provision of worksite and access for construction | |
16, 19 | Provision of environmental mitigation | |
Provision of new public right of way | ||
20 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
23 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
25 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
12b | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Parish of Waddesdon | 1, 16 | Provision of flood mitigation measures |
2, 73, 79 | Provision of environmental mitigation | |
Provision of new public right of way | ||
3, 32, 45, 107, 128, 129 | Provision of drainage and associated works | |
6 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of new public right of way | ||
7, 9, 113, 120, 126, 127 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103 | Provision of environmental mitigation | |
17, 46, 52, 56, 66, 72, 78, 84, 106, 114 | Provision of worksite and access for construction | |
18 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of electricity supply system and access | ||
31, 54, 109, 112 | Provision of worksite and access for construction and maintenance | |
33, 40, 58 | Provision of balancing pond and associated works and access for maintenance | |
68, 93, 110, 111 | Diversion or installation of, or works to, utilities apparatus | |
91 | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
94 | Provision of new public right of way | |
97 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
105 | Provision of drainage and associated works | |
Provision of worksite and access for construction and maintenance | ||
123 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of flood mitigation measures | ||
Parish of Quainton | 3, 35, 61, 66 | Provision of environmental mitigation |
Provision of flood mitigation measures | ||
8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2 | Provision of balancing pond and associated works and access for maintenance | |
9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250 | Provision of worksite and access for construction | |
11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24 | Provision of environmental mitigation | |
17, 75, 127, 210, 212 | Diversion or installation of, or works to, utilities apparatus | |
19 | Provision of worksite and access for construction | |
Removal of utility apparatus | ||
21 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Removal of utility apparatus | ||
31 | Provision of balancing pond and associated works and access for maintenance | |
Removal of utility apparatus | ||
32, 50, 68, 151, 219, 220, 224 | Provision of flood mitigation measures | |
33, 72 | Provision of worksite and access for construction and maintenance | |
87 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
38 | Provision of environmental mitigation | |
Provision of diversion or installation of, or works to, utilities apparatus | ||
40 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10 | Provision of drainage and associated works | |
47 | Provision of a turning head | |
Provision of environmental mitigation | ||
49 | Provision of a turning head | |
Diversion or installation of, or works to, utilities apparatus | ||
93 | Provision of balancing pond and associated works and access for maintenance | |
Provision of flood mitigation measures | ||
118c, 176 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
124 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233 | Diversion and installation of overhead electric lines | |
136a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
Provision of new public right of way | ||
Provision of electricity supply system and access | ||
143 | Diversion and installation of overhead electric lines | |
Provision of access for construction and maintenance | ||
160 | Provision of access for construction and maintenance | |
166 | Provision of electricity supply system and access | |
173 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
Provision of drainage and associated works | ||
174, 175 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
204 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of flood mitigation measures | ||
206b, 207a | Provision of environmental mitigation | |
Provision of electricity supply system and access | ||
243 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
251 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
AP2-6, AP2-7 to AP2-9 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
Parish of Grendon Underwood | 3, 5, 10, 28, 30 | Provision of environmental mitigation |
20, 23, 26 | Provision of worksite and access for construction | |
4 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
21 and 24 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
12a | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
AP2-6 | Provision of worksite and access for construction and maintenance | |
Provision of new public right of way | ||
16a | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Provision of new public right of way | ||
29 | Provision of balancing pond and associated works and access for maintenance | |
AP1-1, AP1-5, AP1-6, AP1-9 | Diversion and installation of overhead electric lines | |
Parish of Middle Claydon | 1, 2 | Provision of environmental mitigation |
Parish of East Claydon | 4, 4a, 5, 7 | Diversion and installation of overhead electric lines |
Parish of Calvert Green | 1, 9, 11 | Provision of environmental mitigation |
2 | Provision of environmental mitigation | |
Provision of new public right of way | ||
AP2-1 | Provision of new public right of way | |
6 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of flood mitigation measures | ||
Provision of new public right of way | ||
8 | Provision of flood mitigation measures | |
23 | Diversion or installation of, or works to, utilities apparatus | |
24 | Diversion or installation of, or works to, utilities apparatus | |
Provision of access for construction and maintenance | ||
25 | Provision of worksite and access for construction | |
18a | Provision of access for construction and maintenance | |
Provision of new public right of way | ||
AP4-2 | Provision of access for construction | |
AP4-6 | Provision of balancing pond and associated works and access for maintenance | |
Parish of Steeple Claydon | 3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4 | Provision of environmental mitigation |
24, 26a, 27, 31, 33, 97 | Provision of worksite and access for construction | |
72 | Provision of environmental mitigation | |
Provision of access for construction and maintenance | ||
9c, 9d | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of access for construction and maintenance | ||
9a, 100, 117, 119, 120 | Diversion or installation of, or works to, utilities apparatus | |
21 | Provision of worksite and access for construction | |
Provision of balancing pond and associated works and access for maintenance | ||
52a, 76 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
51a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
75 | Diversion or installation of, or works to, utilities apparatus | |
Provision of new public right of way | ||
98, 99, 112 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
109 | Provision of flood mitigation measures | |
124, 125 | Provision of drainage and associated works | |
69, 71 | Provision of new public right of way | |
102, 103, AP1-8, AP2-1 to AP2-4 | Provision of worksite and access for construction and maintenance | |
Parish of Charndon | 2, 3 | Diversion or installation of, or works to, utilities apparatus |
Parish of Twyford | 5, 6, 13, 62, 67, 92, 101 | Provision of worksite and access for construction |
14 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
Provision of new public right of way | ||
24, 26, 44, 49, 54 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
27, 48 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
38, 60, 81, 82, 89, 90 | Provision of flood mitigation measures | |
39 | Provision of balancing pond and associated works and access for maintenance | |
Provision of worksite and access for construction | ||
47, 63, 64, 69 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
52 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of access for construction and maintenance | ||
53, 76 | Provision of worksite and access for construction and maintenance | |
58, 88 | Provision of environmental mitigation | |
Provision of new public right of way | ||
71, 75, 77, 83, 84, 95, 97, 99, 100 | Provision of environmental mitigation | |
72 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
78 | Provision of drainage and associated works | |
80 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
87 | Diversion or installation of, or works to, utilities apparatus | |
91 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
94 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of access for construction and maintenance | ||
Provision of new public right of way | ||
Parish of Preston Bissett | 1 to 4 | Provision of flood mitigation measures |
6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1 | Provision of environmental mitigation | |
8, 15a, 16b, 28a, 29a, 52 | Provision of worksite and access for construction | |
12a, 12b, AP4-1 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
20, 21 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
23a | Provision of environmental mitigation | |
Provision of new public right of way | ||
Provision of drainage and associated works | ||
Provision of worksite and access for construction and maintenance | ||
37 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction and maintenance | ||
16c, 16d, 18b, 41, 47 to 51 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
40, 42, 43, 61 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
County of Oxfordshire District of Cherwell Parish of Godington | 5a, 5b, 12, AP2-1 | Provision of environmental mitigation |
Provision of worksite and access for construction and maintenance | ||
6a | Provision of worksite and access for construction | |
8a, 8b, 14, 15 | Provision of flood mitigation measures | |
County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode | 1 to 3, 8, 9 | Provision of flood mitigation measures |
5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87 | Provision of environmental mitigation | |
17a, 17b, 17c, 17d | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of drainage and associated works | ||
19 to 21, 95, 96 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
25, 27, 34, 91 | Provision of worksite and access for construction | |
30 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
41, 86, 88 | Diversion or installation of, or works to, utilities apparatus | |
51 | Diversion or installation of, or works to, utilities apparatus | |
Provision of new public right of way | ||
54 | Provision of drainage and associated works | |
Removal of utility apparatus | ||
63 | Provision of drainage and associated works | |
65 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
71, 90 | Provision of environmental mitigation | |
Provision of new public right of way | ||
76 | Provision of worksite and access for construction | |
Removal of utility apparatus | ||
Parish of Barton Hartshorn | 2a, AP2-5 | Provision of environmental mitigation |
Provision of worksite and access for construction and maintenance | ||
6a | Provision of environmental mitigation | |
7a, 16 | Provision of worksite and access for construction | |
9, 10, 22 | Provision of flood mitigation measures | |
13 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
14 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
19, 24 | Provision of drainage and associated works | |
25, 26 | Provision of environmental mitigation | |
Provision of new public right of way | ||
County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell | 1, 8, 17, 39, 49, 66 | Provision of environmental mitigation |
Provision of worksite and access for construction | ||
4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86 | Provision of environmental mitigation | |
10, 22, 27, 55, 69, 75, 82, 83 | Provision of worksite and access for construction | |
21, 26, 63, 67, 74, 76 | Provision of drainage and associated works | |
32 | Diversion or installation of, or works to, utilities apparatus | |
Removal of utility apparatus | ||
Provision of worksite and access for construction | ||
37, 59 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
30, 56, 58 | Provision of worksite and access for construction and maintenance | |
57, 62 | Provision of flood mitigation measures | |
Provision of drainage and associated works | ||
61 | Provision of worksite and access for construction and maintenance | |
Provision of new public right of way | ||
64 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
72 | Provision of worksite and access for construction | |
Provision of flood mitigation measures | ||
85, 88 | Diversion or installation of, or works to, utilities apparatus | |
92 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
Parish of Finmere | 5, 9, 54 | Provision of environmental mitigation |
7, 15 | Provision of environmental mitigation | |
Provision of new public right of way | ||
8, 12 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
24, 33, 36, 37 | Provision of worksite and access for construction | |
18 | Diversion or installation of, or works to, utilities apparatus | |
Provision of new public right of way | ||
18a, 25, 40, 42 | Diversion or installation of, or works to, utilities apparatus | |
48 | Provision of access for utility works | |
52 | Provision of environmental mitigation | |
Removal of utility apparatus | ||
Parish of Mixbury | 7, 24, 26, 40 | Diversion or installation of, or works to, utilities apparatus |
8, 13a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
12, 17a, 45, 46, 57, AP2-8 to AP2-11 | Provision of environmental mitigation | |
15a, 18, AP2-5a | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
34, 43a, 43b, 51 | Provision of worksite and access for construction | |
28a, 37, 38 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
31 | Provision of balancing pond and associated works and access for maintenance | |
Provision of electricity supply system and access | ||
31a | Provision of environmental mitigation | |
Removal of utility apparatus | ||
Diversion or installation of, or works to, utilities apparatus | ||
39 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
40b, 40c, 49 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
41a, 63 | Provision of drainage and associated works | |
48 | Provision of environmental mitigation | |
Provision of new public right of way | ||
53, 54 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
Provision of drainage and associated works | ||
52 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
Provision of drainage and associated works | ||
Removal of utility apparatus | ||
62 | Provision of flood mitigation measures | |
Removal of utility apparatus | ||
66 | Removal of utility apparatus | |
County of Buckinghamshire District of Aylesbury Vale Parish of Westbury | 1 | Provision of environmental mitigation |
Diversion or installation of, or works to, utilities apparatus | ||
Removal of utility apparatus | ||
Provision of drainage and associated works | ||
1a | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
Provision of new public right of way | ||
5, 6 | Provision of drainage and associated works | |
7 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of new public right of way | ||
Provision of worksite and access for construction and maintenance | ||
14 | Provision of flood mitigation measures | |
19, 21 to 25, 27 | Provision of environmental mitigation | |
28 | Provision of environmental mitigation | |
Provision of new public right of way | ||
29 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
30, 33 to 35, 38 | Provision of worksite and access for construction | |
18, 20 | Diversion or installation of, or works to, utilities apparatus | |
Parish of Turweston | 3, 4, 45, 46 | Provision of new public right of way |
11 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100 | Provision of worksite and access for construction | |
18, 21, 89, 91 | Provision of environmental mitigation | |
29 | Diversion or installation of, or works to, utilities apparatus | |
62, 73 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Removal of utility apparatus | ||
81 | Provision of worksite and access for construction and maintenance | |
37 | Diversion and installation of overhead electric lines | |
38, 104, 106 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
40, 57 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
42, 61, 67 | Diversion and installation of overhead electric lines | |
43, 48 | Diversion and installation of overhead electric lines | |
Provision of new public right of way | ||
49 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
65 | Provision of worksite and access for construction | |
Removal of utility apparatus | ||
Provision of balancing pond and associated works and access for maintenance | ||
84 | Provision of worksite and access for construction | |
Provision of balancing pond and associated works and access for maintenance | ||
88 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
90 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of balancing pond and associated works and access for maintenance | ||
102, 110 | Provision of drainage and associated works | |
109 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
AP2-1 to AP2-4 | Reinstatement of businesses or facilities | |
County of Northamptonshire District of South Northamptonshire Parish of Whitfield | 1 | Provision of balancing pond and associated works and access for maintenance |
Diversion and installation of overhead electric lines | ||
4, 9, 13, 14 | Provision of drainage and associated works | |
6 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
Provision of electricity supply system, and access | ||
10 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
Provision of new public rights of way | ||
Provision of drainage and associated works | ||
16, AP2-3 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
20, 35 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
26 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
30 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
17 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
25 | Provision of flood mitigation measures | |
Provision of new public right of way | ||
27 | Provision of flood mitigation measures | |
28 | Provision of environmental mitigation | |
29, 37, 40, 42, 48 to 50 | Provision of worksite and access for construction | |
41 | Provision of balancing pond and associated works and access for maintenance | |
44 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Parish of Brackley | 1 | Provision of balancing pond and associated works and access for maintenance |
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
4, 6 | Provision of worksite and access for construction and maintenance | |
7 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
9 | Provision of worksite and access for construction | |
12 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
13 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
14, 15 | Diversion or installation of, or works to, utilities apparatus | |
Parish of Radstone | 1, 2, 22 | Provision of worksite and access for construction |
5, 7a | Provision of worksite and access for construction | |
Provision of new public right of way | ||
6a, 6b, 20 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
9 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
7 | Diversion or installation of, or works to, utilities apparatus | |
Removal of utility apparatus | ||
8a, 16a, 16c, 18a, 18c, 40, 41, 47 | Provision of environmental mitigation | |
10, 17, 21, 23, 38, AP2-4, AP2-6 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
19, 26, 32, 33 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of balancing pond and associated works and access for maintenance | ||
27, 37a, 37b, 41a | Provision of balancing pond and associated works and access for maintenance | |
28, 29 | Provision of flood mitigation measures | |
30 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
Provision of environmental mitigation | ||
Provision of new public right of way | ||
Removal of utility apparatus | ||
36 | Provision of environmental mitigation | |
Removal of utility apparatus | ||
AP2-7 | Provision of new public right of way | |
46 | Provision of flood mitigation measures | |
Parish of Greatworth | 1 | Provision of new public right of way |
3 | Provision of drainage and associated works | |
Provision of flood mitigation measures | ||
4 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
5 | Provision of flood mitigation measures | |
8, 11, 15, 75, 76 | Provision of environmental mitigation | |
9 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
12, AP2-1 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
Removal of utility apparatus | ||
13 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
Removal of utility apparatus | ||
Provision of worksite and access for construction | ||
19 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
15a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
16, 17, 17a, 38 | Diversion or installation of, or works to, utilities apparatus | |
18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5 | Provision of worksite and access for construction | |
10 | Provision of environmental mitigation | |
Provision of new public right of way | ||
20, 21 | Provision of drainage and associated works | |
23 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
Removal of utility apparatus | ||
30, 70, 73 | Provision of worksite and access for construction | |
Removal of utility apparatus | ||
24 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
Removal of utility apparatus | ||
25 | Diversion or installation of, or works to, utilities apparatus | |
Removal of utility apparatus | ||
39a, 39b | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Removal of utility apparatus | ||
26 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction | ||
28, 31, 32, 34, 52, 56, 83, 99 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
29a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Removal of utility apparatus | ||
Provision of drainage and associated works | ||
Provision of balancing pond and associated works and access for maintenance | ||
33 | Provision of balancing pond and associated works and access for maintenance | |
43 | Provision of flood mitigation measures | |
Diversion or installation of, or works to, utilities apparatus | ||
44 | Provision of worksite and access for construction and maintenance | |
57, 61a | Provision of worksite and access for construction and maintenance | |
Provision of new public right of way | ||
Parish of Marston St Lawrence | 4, 23 | Provision of environmental mitigation |
5, 8, 11, 14 | Provision of worksite and access for construction | |
7, 9 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
15 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
17 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
AP4-1 | Provision of drainage and associated works | |
Parish of Sulgrave | 1 | Provision of environmental mitigation |
Provision of new public right of way | ||
Parish of Thorpe Mandeville | 3 | Provision of new public right of way |
Provision of environmental mitigation | ||
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
4, 16, 48, 54 | Provision of worksite and access for construction | |
18, 47 | Diversion or installation of, or works to, utilities apparatus | |
15, 31, 35 | Provision of environmental mitigation | |
25, 41, 42 | Provision of drainage and associated works | |
26 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of balancing pond and associated works and access for maintenance | ||
Removal of utility apparatus | ||
28, 33, 36, 40, 43 | Provision of flood mitigation measures | |
29, 51 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
60, 62 | Provision of balancing pond and associated works and access for maintenance | |
69 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Removal of utility apparatus | ||
Diversion or installation of, or works to, utilities apparatus | ||
71 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
AP2-3 | Provision of a turning head | |
Provision of access for construction | ||
Parish of Culworth | 1 | Diversion or installation of, or works to, utilities apparatus |
7, 8, 13, 16 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
11 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
12, 20, 23 | Provision of environmental mitigation | |
17 | Provision of worksite and access for construction | |
Provision of electricity supply system and access | ||
18 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
Provision of new public right of way | ||
19, AP4-1 | Provision of balancing pond and associated works and access for maintenance | |
21a | Provision of worksite and access for construction and maintenance | |
22, 25, 44 | Provision of worksite and access for construction | |
29 | Provision of drainage and associated works | |
34 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
39 | Provision of flood mitigation measures | |
Parish of Chipping Warden and Edgcote | 2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2 | Provision of environmental mitigation |
35, 36, 39 | Diversion or installation of, or works to, utilities apparatus | |
11 | Provision of worksite and access for construction | |
Provision of flood mitigation measures | ||
3, 14, 41 | Provision of flood mitigation measures | |
15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13 | Provision of worksite and access for construction | |
18a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
25 | Provision of worksite and access for construction and maintenance | |
47, AP2-1 | Provision of balancing pond and associated works and access for maintenance | |
58 | Provision of environmental mitigation | |
Provision of new public right of way | ||
65a | Provision of environmental mitigation | |
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
71, AP1-3, AP2-15 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
72a, AP2-21 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
94a, 99 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
AP2-3, AP2-5, AP2-13 | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
AP2-14 | Provision of a turning head | |
AP2-9 | Provision of drainage and associated works | |
AP4-3 | Provision of drainage and associated works | |
AP4-10, AP4-11 | Provision of access for construction | |
Parish of Aston Le Walls | 3, 32, AP4-1 | Provision of worksite and access for construction |
9 | Diversion or installation of, or works to, utilities apparatus | |
10 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
17 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
20 | Provision of environmental mitigation | |
23, 25, AP2-1 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
28a, 31, AP2-2, AP2-3 | Provision of balancing pond and associated works and access for maintenance | |
39, AP2-4 | Provision of drainage and associated works | |
Parish of Boddington | 11, 29, 39, 52, 54, 66, AP2-1, AP4-3 | Provision of drainage and associated works |
3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2 | Provision of worksite and access for construction | |
2a, 40a, 87, 96, 98, 114, 123b, AP2-2 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
18 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Provision of worksite and access for construction | ||
97, 100a, 107a, 109a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
85 | Diversion or installation of, or works to, utilities apparatus | |
16, 56, 86 | Provision of flood mitigation measures | |
91 | Diversion or installation of, or works to, utilities apparatus | |
Provision of environmental mitigation | ||
25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121 | Provision of environmental mitigation | |
97a and 99 | Diversion or installation of, or works to, utilities apparatus | |
Removal of utility apparatus | ||
101 | Provision of worksite and access for construction and maintenance | |
14a | Provision of balancing pond and associated works and access for maintenance | |
Provision of flood mitigation measures | ||
22 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Provision of worksite and access for construction | ||
28 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of balancing pond and associated works and access for maintenance | ||
61 | Provision of environmental mitigation | |
Removal of utility apparatus | ||
69 | Provision of balancing pond and associated works and access for maintenance | |
74 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Removal of utility apparatus | ||
81 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
103a | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of drainage and associated works | ||
Provision of worksite and access for construction and maintenance | ||
County of Warwickshire District of Stratford-on-Avon Parish of Stoneton | 5, 7, 8, 13, 14, 16a, 28 | Provision of environmental mitigation |
15 | Diversion or installation of, or works to, utilities apparatus | |
16, 18 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
19 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
6b, 9b, 22, 24 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Parish of Wormleighton | 21 | Provision of environmental mitigation |
12, AP2-4 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
11, 15, 17, 18, 20 | Provision of worksite and access for construction and maintenance | |
13 | Diversion or installation of, or works to, utilities apparatus | |
23, 25 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction | ||
26 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction | ||
Provision of access for construction and maintenance of utility diversions | ||
28 | Provision of environmental mitigation | |
Provision of access for construction and maintenance of utility diversions | ||
31b | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
34a, 47 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
50 | Diversion or installation of, or works to, utilities apparatus | |
Provision of environmental mitigation | ||
52 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
55 | Provision of worksite and access for construction | |
Parish of Radbourn | 2, 13b, 19, 28 | Provision of worksite and access for construction |
3 | Provision of worksite and access for construction | |
Reprofiling of ground | ||
Provision of drainage and associated works | ||
6 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
7 | Provision of worksite and access for construction | |
Reprofiling of ground | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
8, 8c | Provision of flood mitigation measures | |
8b | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Reprofiling of ground | ||
Provision of new public right of way | ||
9 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
Provision of environmental mitigation | ||
11 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction and maintenance | ||
Provision of new public right of way | ||
13a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
15 | Provision of environmental mitigation | |
16 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
5 | Diversion or installation of, or works to, utilities apparatus | |
Provision of flood mitigation measures | ||
Provision of access for construction and maintenance of utility diversions | ||
8d | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Parish of Ladbroke | 5, 19, 20, 25 to 27 | Diversion or installation of, or works to, utilities apparatus |
7, 12, 15, 39, 41, 42, 52 | Provision of environmental mitigation | |
8, 18 | Reprofiling of ground | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
24, 28, 32 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction | ||
29, 33, 71, 72 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
35, 56, 62, 63, 76 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
36, 61 | Provision of worksite and access for construction | |
37, AP4-2, AP4-3 | Provision of new public right of way | |
53, 59, 69 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
66 | Provision of balancing pond and associated works and access for maintenance | |
AP4-1 | Minor highway alterations | |
Parish of Southam | 5, 31, 63, 65, 70, 72, 90, 93 | Provision of environmental mitigation |
54, 56, 58, 60 to 62, 87, AP1-1, AP1-2 | Diversion or installation of, or works to, utilities apparatus | |
6, 9, 111 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
13, 94, 95 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
8, 14, 103 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
24, 32 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
34, 39, 55, 68, 80 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
16, 41, 53, 91 | Provision of worksite and access for construction | |
28, 29 | Provision of drainage and associated works | |
45 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
47 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
49, 51, 52, AP4-1 to AP4-3 | Provision of new public right of way | |
75 | Provision of environmental mitigation | |
Provision of access for construction and maintenance of utility diversions | ||
100 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of flood mitigation measures | ||
107 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of flood mitigation measures | ||
112, 118 | Provision of worksite and access for construction and maintenance | |
Parish of Long Itchington | 1, 15, 19, 30a, 35a, 37, 47, AP4-4 | Provision of environmental mitigation |
2 | Provision of worksite and access for construction and maintenance | |
6 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
7 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
7a | Provision of drainage and associated works | |
9 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of access for construction and maintenance of utility diversions | ||
12, 49, 50, 52, 63, 64 | Diversion or installation of, or works to, utilities apparatus | |
20, 22, 31, 32 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
53 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction and maintenance | ||
48, 57 | Provision of worksite and access for construction | |
58 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
59, 61 | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
11a | Removal of utility apparatus | |
Parish of Ufton | 2 | Provision of environmental mitigation |
Diversion or installation of, or works to, utilities apparatus | ||
8, 21, 23, 24 | Diversion or installation of, or works to, utilities apparatus | |
9 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
15 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Drainage and associated work | ||
11, 18 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
Provision of flood mitigation measures | ||
AP4-4 to AP4-7 | Provision of access for construction | |
District of Warwick Parish of Offchurch | 4, 6, 32, 49, 50, 51a, 54a | Provision of environmental mitigation |
7, 10, 98a | Provision of worksite and access for construction and maintenance | |
11 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
12, AP2-1 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Provision of drainage and associated works | ||
13, 19, 28, 36, 42 to 44, 53a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
15 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
18 | Provision of environmental mitigation | |
Minor highway alterations | ||
21, 45, 58, 59b, 60, 62 | Provision of worksite and access for construction | |
23 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
24 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
27 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
29, 66, 89 | Diversion or installation of, or works to, utilities apparatus | |
37, 73 | Provision of balancing pond and associated works and access for maintenance | |
57a | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
68, 70, 84 | Reprofiling of ground | |
Provision of worksite and access for construction | ||
69 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction | ||
71, 75 | Provision of new public right of way | |
78, 79, 87 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
Diversion or installation of, or works to, utilities apparatus | ||
80 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
Provision of access for construction and maintenance of utility diversions | ||
91a | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of flood mitigation measures | ||
92a | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
47a | Provision of a turning head | |
51b | Provision of a turning head | |
Provision of environmental mitigation | ||
AP2-2, AP2-3 | Minor highway alterations | |
Parish of Cubbington | 1a | Provision of balancing pond and associated works and access for maintenance |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of environmental mitigation | ||
Provision of worksite and access for construction and maintenance | ||
19, 21, 41, 46, 49, 53, 57, 61, 65 | Provision of worksite and access for construction | |
23, 27, 28, 50, 52, 67 | Provision of environmental mitigation | |
4 | Diversion or installation of, or works to, utilities apparatus | |
5, 6 | Provision of access for construction and maintenance | |
Provision of access for construction and maintenance of utility diversions | ||
9 | Provision access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
11a, 14, 15 | Provision of environmental mitigation | |
Drainage and associated works | ||
Provision of worksite and access for construction | ||
32 | Provision of drainage and associated works | |
Provision of worksite and access for construction | ||
35 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Installation of ground anchors | ||
39, 48 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
44 | Provision of new public right of way | |
47 | Provision of access for construction and maintenance | |
AP4-3 | Provision of environmental mitigation | |
Parish of Weston Under Wetherley | 1, 2 | Provision of worksite and access for construction |
Diversion or installation of, or works to, utilities apparatus | ||
4, 5a, AP4-1 to AP4-3 | Provision of environmental mitigation | |
AP4-4 | Provision of worksite and access for construction and maintenance | |
Parish of Stoneleigh | 1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8 | Provision of worksite and access for construction |
8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11 | Provision of environmental mitigation | |
21, 24, 28, 29, 31, 34, 43, 77a, 83 | Diversion or installation of, or works to, utilities apparatus | |
22, 42, 144, 158, 163 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
33, 62 | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10b | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
55 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
63 | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
73, AP4-1 | Provision of drainage and associated works | |
79a, 87, 112, 139 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
84 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
136, 141 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
97, 100, 143 | Provision of worksite and access for construction and maintenance | |
99 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
104 | Provision of balancing pond and associated works and access for maintenance | |
105 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
132 | Provision of flood mitigation measures | |
133, AP4-12 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
140b, 146 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
166, 182 | Provision of environmental mitigation | |
Provision of new public right of way | ||
171a | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
178 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
184 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
Parish of Kenilworth | 12, 30a, AP2-3 | Provision of environmental mitigation |
13, 16, 21, AP2-1, AP2-2 | Provision of worksite and access for construction | |
5, 6, 23, 25a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
9, 11, 15 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
20 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
Parish of Burton Green | 4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12 | Provision of environmental mitigation |
Provision of worksite and access for construction | ||
7, 19, 59, 63, AP4-1 to AP4-4 | Provision of environmental mitigation | |
11, 21, AP1-1a | Provision of worksite and access for construction | |
28a, 28b, 28c | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
29, 31 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
32, AP2-3 | Provision of worksite and access for construction and maintenance | |
33a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
Provision of new public right of way | ||
35 | Reinstatement of businesses or facilities | |
72 | Provision of environmental mitigation | |
Provision of new public right of way | ||
77 | Provision of new public right of way | |
98 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
AP2-1 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
AP2-6 | Provision of passing places | |
District of North Warwickshire Parish of Great Packington | 1, 6 | Provision of worksite and access for construction |
7, 8 | Provision of balancing pond and associated works and access for maintenance | |
Parish of Little Packington | 2 | Provision of environmental mitigation |
Provision of balancing pond and associated works and access for maintenance | ||
4 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
10, 12, 15, 16 | Diversion and installation of overhead electric lines | |
17, 19 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
AP1-1 | Reinstatement of businesses or facilities | |
Parish of Coleshill | 1c | Provision of environmental mitigation |
Diversion and installation of overhead electric lines | ||
1f, 1g, 1r | Provision of balancing pond and associated works and access for maintenance | |
1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22 | Diversion and installation of overhead electric lines | |
33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565a | Diversion or installation of, or works to, utilities apparatus | |
38 | Provision of balancing pond and associated works and access for maintenance | |
48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589a | Provision of worksite and access for construction | |
50 | Diversion and installation of overhead electric lines | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of balancing pond and associated works and access for maintenance | ||
116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28 | Provision of environmental mitigation | |
51, 440, 495a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
73 | Provision of environmental mitigation | |
Removal of existing utilities | ||
546a | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
74, 321, 452a, 452b, 546 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
75, 233a, 322, 377, 391, 396 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion and installation of overhead electric lines | ||
112b | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion and installation of overhead electric lines | ||
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
127a | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
108a, 310, 315, 354, 506 to 508, 580a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
100, 427 | Provision of worksite and access for construction and maintenance | |
164 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Diversion and installation of overhead electric lines | ||
283, 289, 297, 312a, 335, 346, 366, 369 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
188 | Provision of balancing pond and associated works and access for maintenance | |
Provision of worksite and access for construction | ||
195, 196 | Provision of worksite and access for construction | |
Diversion and installation of overhead line equipment | ||
199 | Provision of balancing pond and associated works and access for maintenance | |
Diversion and installation of overhead line equipment | ||
247, 257a | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of new public right of way | ||
253, 388, 416, 451, 459, 460, 502 | Provision of environmental mitigation | |
Diversion and installation of overhead line equipment | ||
308, 318, 467 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
358 | Diversion and installation of overhead line equipment | |
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of balancing pond and associated works and access for maintenance | ||
404, 409 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
432 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
412 | Provision of environmental mitigation | |
Diversion and installation of overhead line equipment | ||
419, 517a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of new public right of way | ||
481 | Provision of environmental mitigation | |
Provision of new public right of way | ||
491a, 491b | Provision of environmental mitigation | |
Provision of new public right of way | ||
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
511, 559a, 559b, AP2-20 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of balancing pond and associated works and access for maintenance | ||
526a, 526b | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
593a, 593b | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead line equipment | ||
439, 485, 486 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
492, 500 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Parish of Water Orton | 6, 132 | Provision of worksite and access for construction and maintenance |
Diversion or installation of, or works to, utilities apparatus | ||
9a, 10, 27, 28, 37, 40, 43a, 82a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
13a, 42, 50, 57, 64, 65, 67 to 69, 74 | Provision of environmental mitigation | |
23, 34, 35, 38, 39, 41, 77a | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
43, AP4-5 | Reinstatement of businesses or facilities | |
44, 89a, 126, 130, 142, AP4-25, AP4-26 | Provision of worksite and access for construction | |
48 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of balancing pond and associated works and access for maintenance | ||
52 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
53, 54, 56 | Provision of balancing pond and associated works and access for maintenance | |
76 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
100a, 100b, 100c, 118 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
119a, 123 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
124a, 124b, 129, 139a | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20 | Diversion and installation of overhead electric lines | |
138a | Diversion or installation of, or works to, utilities apparatus | |
133, 140, 143 | Provision of worksite and access for construction and maintenance | |
155a, 155b | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
Provision of balancing pond and associated works and access for maintenance | ||
AP4-14, AP4-16, AP4-17 | Provision of worksite and access for construction | |
Minor highway alterations | ||
Parish of Shustoke | AP4-1 to AP4-3, AP4-5, AP4-6 | Provision of environmental mitigation |
Parish of Curdworth | 1a, 49, 70, 72, 77, 78, 80, 106, 215 | Diversion or installation of, or works to, utilities apparatus |
2 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
3a, 6, 7, 113a, 201, 202, 223, 241, 244 | Provision of worksite and access for construction | |
5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32 | Diversion and installation of overhead electric lines | |
13, AP2-6 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9 | Provision of environmental mitigation | |
10a, 25a, 26 to 28, 31, 32, 45, 48, 69 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
35, 191, 194 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246 | Provision of worksite and access for construction and maintenance | |
51a, 68a | Provision of balancing pond and associated works and access for maintenance | |
Diversion and installation of overhead electric lines | ||
65a, 66a, 81a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Diversion and installation of overhead electric lines | ||
71 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
67a, 83, 83a, 90 to 92 | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
88, 209, 233, 247 | Provision of new public right of way | |
98, 101, 103 | Installation of ground anchors | |
99, 103a | Installation of ground anchors | |
Provision of access for utility works | ||
108a | Provision of environmental mitigation | |
Provision of access for utility works | ||
153, 164, 251, 254, 256 | Diversion or installation of, or works to, utilities apparatus | |
Provision of environmental mitigation | ||
228 | Removal of utility apparatus | |
249 | Provision of new public right of way | |
Provision of environmental mitigation | ||
252 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
AP2-10 | Provision of access for maintenance | |
Parish of Lea Marston | 1 to 4, 13, 16 | Diversion or installation of, or works to, utilities apparatus |
12, 14 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4 | Provision of environmental mitigation | |
18 | Provision of balancing pond and associated works and access for maintenance | |
44, 47, 49, AP2-23 | Provision of new public right of way | |
66 | Provision of new public right of way | |
Provision of worksite and access for construction | ||
67 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
72a, 72b, 73 | Provision of new vehicular right on existing public right of way | |
74a | Provision of environmental mitigation | |
Provision of new public right of way | ||
55b, 68b | Provision of environmental mitigation | |
Minor highway alterations | ||
78a, AP2-22 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
Provision of environmental mitigation | ||
AP2-24 | Provision of new public right of way | |
Parish of Kingsbury | 2, AP2-1, AP2-2 | Provision of environmental mitigation |
Parish of Middleton | 4, 108 | Provision of environmental mitigation |
Provision of flood mitigation measures | ||
27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21 | Provision of environmental mitigation | |
100, AP2-10a | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
Provision of balancing pond and associated works and access for maintenance | ||
21, 30, 32 | Diversion and installation of overhead electric lines | |
110, 169a | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of worksite and access for construction and maintenance | ||
Provision of flood mitigation measures | ||
38, 66 | Diversion or installation of, or works to, utilities apparatus | |
41 | Provision of flood mitigation measures | |
52 | Provision and renewal of railway systems for operational purposes and drainage | |
11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11b | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
AP2-9 | Provision of new public right of way | |
107 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
Provision of worksite and access for construction and maintenance | ||
112, AP2-5 | Provision of balancing pond and associated works and access for maintenance | |
113 | Provision of balancing pond and associated works and access for maintenance | |
Provision of worksite and access for construction and maintenance | ||
124, 129, AP2-5a | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
128 | Provision of balancing pond and associated works and access for maintenance | |
Provision of worksite and access for construction | ||
County of Staffordshire District of Lichfield Parish of Drayton Bassett | 2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4 | Provision of environmental mitigation |
28 | Diversion or installation of, or works to, utilities apparatus | |
7, 23, 29, 50, 86 | Diversion and installation of overhead electric lines | |
13a, AP4-1 | Provision of worksite and access for construction and maintenance | |
16 | Provision of worksite and access for construction | |
19a, AP2-6 | Provision of balancing pond and associated works and access for maintenance | |
22, 24 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
Provision of worksite and access for construction | ||
30 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
33 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
53, 92, 94, 102, AP2-7 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
58, 59, 63, 68, 71, 80 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
93 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
99 | Provision of environmental mitigation | |
Provision of new public right of way | ||
106 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
109, 117, AP2-8 to AP2-10 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction | ||
114, AP2-2 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of worksite and access for construction | ||
Parish of Fazeley | 3, 6, 8 | Diversion and installation of overhead electric lines |
Parish of Hints with Canwell | 15, 17, 18, 87, 88, AP2-20 | Provision of worksite and access for construction and maintenance |
20 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17 | Provision of environmental mitigation | |
23, 125, 129 | Diversion or installation of, or works to, utilities apparatus | |
24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
25, 28 | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Diversion and installation of overhead electric lines | ||
30, 33, 38, 45, 47, 48 | Diversion and installation of overhead electric lines | |
35 | Diversion and installation of overhead electric lines | |
Provision of new public right of way | ||
Provision of worksite and access for construction | ||
Provision of environmental mitigation | ||
37, 39 | Diversion and installation of overhead electric lines | |
Provision of new public right of way | ||
55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Provision of worksite and access for construction | ||
58, AP2-22, AP2-23, AP2-24a | Provision of drainage and associated works | |
61 | Implementation of woodland management measures | |
65, 143 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
70 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
75a, 75b | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of new public right of way | ||
78a, 78b, 96a | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
80 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
82a | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
Implementation of woodland management measures | ||
86 | Provision of balancing pond and associated works and access for maintenance | |
94 | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
101 | Provision of environmental mitigation | |
Provision of new public right of way | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of worksite and access for construction | ||
116 to 118, 123 | Provision of worksite and access for construction | |
131a | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
153, 155 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
157a, 159 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
Provision of environmental mitigation | ||
Parish of Weeford | 7, 24, 27 | Provision of environmental mitigation |
12, 16, 21 | Provision of worksite and access for construction | |
14 | Provision of access for construction and maintenance | |
20 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
22 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
AP1-5, AP1-8, AP1-10, AP1-11 | Diversion and installation of overhead electric lines | |
AP2-1 | Provision of drainage and associated works | |
Parish of Swinfen and Packington | 11, 16, 23 | Provision of environmental mitigation |
11a, AP2-1, AP2-2 | Provision of drainage and associated works | |
12, 15, 29 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
20 | Provision of environmental mitigation | |
Provision of new public right of way | ||
17a, 18a, 19, 22 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
33, 34, 42 | Provision of worksite and access for construction | |
36, 39 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
37 | Diversion or installation of, or works to, utilities apparatus | |
Parish of Whittington | 5, 17, 63, 67, AP2-25, AP2-26 | Diversion or installation of, or works to, utilities apparatus |
19a, 20a, 23, 101a, AP2-2 to AP2-4 | Provision of environmental mitigation | |
92a, 92b, AP2-5, AP2-6 | Provision of environmental mitigation | |
Provision of balancing pond and associated works and access for maintenance | ||
28, 29, 31, 100a, 104a, 105a, 107, 112, 114a | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
32, 47, 48 | Implementation of woodland management measures | |
37, 41 | Implementation of woodland management measures | |
Provision of new public right of way | ||
42, 46 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Implementation of woodland management measures | ||
52, 54, 116a | Provision of worksite and access for construction and maintenance | |
58, 64, 66, 98a | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utilities apparatus | ||
79, 91, AP2-28, AP2-29 | Provision of worksite and access for construction | |
81a | Provision of worksite and access for construction | |
Provision of balancing pond and associated works and access for maintenance | ||
25a | Provision of environmental mitigation | |
Provision of access for maintenance | ||
AP2-10, AP2-11, AP2-38 | Diversion or installation of, or works to, utilities apparatus | |
Provision of flood mitigation measures | ||
AP2-20 | Provision of drainage and associated works | |
94a | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
103a | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Parish of Fradley and Streethay | AP2-1, AP2-21 | Provision of environmental mitigation |
AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138 | Provision of worksite and access for construction | |
AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
AP2-119, AP2-120, AP2-122 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of drainage and associated works | ||
AP2-61, AP2-62, AP2-64 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
AP2-40, AP2-43, AP2-68, AP2-71, AP2-163 | Provision and renewal of railway systems for operational purposes and drainage | |
AP2-19, AP2-20, AP2-23 | Diversion or installation of, or works to, utilities apparatus | |
AP2-16 | Provision of environmental mitigation | |
Provision and renewal of railway systems for operational purposes and drainage | ||
Provision of drainage and associated works | ||
AP2-117 | Provision of new public right of way | |
Parish of Curborough and Elmhurst | AP4-3 to AP4-7 | Diversion or installation of, or works to, utility apparatus |
Parish of Lichfield | AP4-3 | Diversion or installation of, or works to, utility apparatus |
Parish of Longdon | 4 to 6, 8 to 10, 13, 14 | Diversion and installation of overhead electric lines |
Parish of Kings Bromley | 1, 4 | Provision and renewal of railway systems for operational purposes and drainage |
119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46a | Provision of worksite and access for construction and maintenance | |
AP2-54 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
Provision of worksite and access for construction | ||
AP2-33, AP2-35a, AP2-35b, AP2-35c | Provision of worksite and access for construction | |
Provision of environmental mitigation | ||
Provision of drainage and associated works | ||
52a, 52b, 121 | Provision of worksite and access for construction | |
165, AP2-52, AP2-52a, AP2-53 | Provision of environmental mitigation | |
AP2-46b, AP2-46c | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9 | Diversion or installation of, or works to, utilities apparatus | |
62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1 | Diversion and installation of overhead electric lines | |
83, 90 | Diversion and installation of overhead electric lines | |
Provision of environmental mitigation | ||
85a, 86 | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
88 | Provision of access for construction | |
91, 195, 196 | Provision of drainage and associated works | |
95, 168, 187 | Provision of worksite and access for construction and maintenance | |
Provision of environmental mitigation | ||
102, AP2-35a | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
128a | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
AP2-31a | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Provision of environmental mitigation | ||
Diversion or installation of, or works to, utilities apparatus | ||
138, 139, 142 | Diversion or installation of, or works to, utilities apparatus | |
Provision of worksite and access for construction | ||
148 | Diversion or installation of, or works to, utilities apparatus | |
Provision of environmental mitigation | ||
Provision of worksite and access for construction | ||
161, 171 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
130b | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
Provision of drainage and associated works | ||
140c | Diversion or installation of, or works to, utilities apparatus | |
Diversion and installation of overhead electric lines | ||
Provision of balancing pond and associated works and access for maintenance | ||
Provision of drainage and associated works | ||
Parish of Armitage with Handsacre | 1, 4 | Provision of worksite and access for construction |
11, 14, 15 | Provision of worksite and access for construction | |
Provision of drainage and associated works | ||
18, 20, 24, AP2-1 to AP2-3 | Provision of worksite and access for construction and maintenance | |
Parish of Colton | 10, 16, 17 | Provision and renewal of railway systems for operational purposes and drainage |
Borough of Stafford Parish of Colwich | 24, AP2-1 | Provision and renewal of railway systems for operational purposes and drainage |
Metropolitan Borough of Solihull Parish of Berkswell | 2a, 4, 28a, AP2-4 | Provision of environmental mitigation |
Provision of worksite and access for construction | ||
6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9 | Provision of worksite and access for construction | |
24, 26b, 47, 54, 71, 72 | Diversion and installation of overhead electric lines | |
31 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
35 | Provision of environmental mitigation | |
Provision of worksite and access for construction and maintenance | ||
Diversion or installation of, or works to, utilities apparatus | ||
Provision of electricity supply system and access | ||
36a, 36b | Provision of environmental mitigation | |
Diversion or installation of, or works to, utilities apparatus | ||
37 | Provision of electricity supply system and access | |
42, AP2-10, AP2-11 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
43 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Installation of ground anchors | ||
53 | Provision of new public right of way | |
55 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
Provision of worksite and access for construction | ||
Provision of new public right of way | ||
59 | Provision of worksite and access for construction | |
Provision of new public right of way | ||
60, 64 and 69 | Provision of drainage and associated works | |
Provision of worksite and access for construction | ||
63 | Provision of environmental mitigation | |
Provision of drainage and associated works | ||
32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14 | Provision of environmental mitigation | |
129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236 | Provision of worksite and access for construction | |
130a, 142 | Provision and renewal of railway systems for operational purposes and drainage | |
143 | Provision of a worksite and access for construction and maintenance | |
Provision of balancing pond and associated works and access for maintenance | ||
140, 141, 162, 175, 206, 211, 220, 230 | Provision of worksite and access for construction and maintenance | |
147, 151, 152, 153, 155 | Provision of worksite and access for construction and maintenance | |
Diversion or installation of, or works to, utility apparatus | ||
Provision of environmental mitigation | ||
158 | Provision of flood mitigation measures | |
Provision of worksite and access for construction and maintenance | ||
172, 221, 222 | Provision of flood mitigation measures | |
Provision of worksite and access for construction | ||
195, 204, 208, 238 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
223, 233 | Provision of balancing pond and associated works and access for maintenance | |
Parish of Meriden | 3 | Provision of environmental mitigation |
Provision of worksite and access for construction | ||
Parish of Hampton-in-Arden | 1 | Provision of worksite and access for construction and maintenance |
Provision of new public right of way | ||
2 | Provision of environmental mitigation | |
4, 6, AP2-6 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24 | Provision of worksite and access for construction | |
8, 26, 34, 45, 55 | Provision of balancing pond and associated works and access for maintenance | |
9 | Provision of drainage and associated works | |
16a, 17a, 18a, AP2-8, AP2-10, AP2-11 | Provision of worksite and access for construction | |
Provision of flood mitigation measures | ||
22 | Provision of worksite and access for construction and maintenance | |
24, 43 | Provision of a turning head | |
36, 41 | Provision of worksite and access for construction and maintenance | |
Provision of balancing pond and associated works and access for maintenance | ||
35, 42 | Provision of worksite and access for construction and maintenance | |
Provision of balancing pond and associated works and access for maintenance | ||
Provision of new public right of way | ||
46a | Provision of balancing pond and associated works and access for maintenance | |
Provision of new public right of way | ||
47a | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utility apparatus | ||
49 | Provision of flood mitigation measures | |
25b, 25c | Minor highway alterations | |
37a | Provision of balancing pond and associated works and access for maintenance | |
Provision of drainage and associated works | ||
Provision of environmental mitigation | ||
47b | Provision of worksite and access for construction | |
Diversion of installation of or works to, utilities apparatus | ||
Provision of new public rights of way | ||
Provision of worksite and access for construction | ||
AP2-26 | Provision of drainage and associated works | |
Parish of Bickenhill | 2, 3 | Provision of balancing pond and associated works and access for maintenance |
6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76 | Provision of worksite and access for construction | |
37, 40, 41b, 62, 69a | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
41 | Provision of worksite and access for construction and maintenance | |
Diversion and installation of overhead electric lines | ||
12 | Provision of balancing pond and associated works and access for maintenance | |
11 | Provision of balancing pond and associated works and access for maintenance | |
Minor highway alterations | ||
42a, 42b, 42c, 57a, 57b, 57c | Provision and renewal of railway systems for operational purposes and drainage | |
58 | Diversion or installation of, or works to, utilities apparatus | |
71 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
Provision of balancing pond and associated works and access for maintenance | ||
71b | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion and installation of overhead electric lines | ||
Provision of balancing pond and associated works and access for maintenance | ||
85 | Provision of environmental mitigation | |
Diversion and installation of overhead electric lines | ||
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
87 | Provision of environmental mitigation | |
90 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
88 | Provision of balancing pond and associated works and access for maintenance | |
Diversion or installation of, or works to, utilities apparatus | ||
91 | Diversion or installation of, or works to, utilities apparatus | |
Reinstatement of businesses or facilities | ||
91a | Reinstatement of businesses or facilities | |
Parish of Dickens Heath | AP4-1 | Reinstatement of businesses or facilities |
Parish of Chelmsley Wood | 6 | Provision of worksite and access for construction and maintenance |
City of Birmingham | 1a | Diversion and installation of overhead electric lines |
3a, 4b, 4c, AP2-11, AP2-12 | Provision of worksite and access for construction | |
5a | Provision of environmental mitigation | |
12 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
8 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion or installation of, or works to, utilities apparatus | ||
9 | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
9a and 9b | Provision of environmental mitigation | |
Provision of flood mitigation measures | ||
Diversion and installation of overhead electric lines | ||
13a, 15, 29, 32, 33 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Provision of flood mitigation measures | ||
14, 28 | Provision of environmental mitigation | |
Provision of worksite and access for construction | ||
Diversion and installation of overhead electric lines | ||
Provision of flood mitigation measures | ||
16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401 | Provision of worksite and access for construction | |
23, 24, 27 | Provision of worksite and access for construction | |
Diversion and installation of overhead electric lines | ||
26 | Provision of environmental mitigation | |
41 | Provision of balancing pond and associated works and access for maintenance | |
Provision of environmental mitigation | ||
46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479 | Provision of worksite and access for construction | |
Diversion or installation of, or works to, utility apparatus | ||
63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28 | Reinstatement of businesses or facilities | |
67 | Provision of worksite and access for construction | |
Provision and renewal of railway systems for operational purposes and drainage | ||
102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24 | Diversion or installation of, or works to, utility apparatus | |
157c, 157e, 157g, 274a, 322, 355, 363, 376 | Provision and renewal of railway systems for operational purposes and drainage | |
223 | Provision of worksite and access for construction | |
Provision of access for construction and maintenance | ||
268 | Provision and renewal of railway systems for operational purposes and drainage | |
Diversion or installation of, or works to, utility apparatus | ||
269, 271 to 273, 324, 419 | Provision of worksite and access for construction | |
Provision of balancing pond and associated works and access for maintenance | ||
300d, 300e | Removal of utility apparatus | |
19, 304, 305, 306, 326, 326a | Provision of balancing pond and associated works and access for maintenance | |
332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31 | Provision of worksite and access for construction and maintenance | |
367, 368 | Provision and renewal of railway systems for operational purposes and drainage | |
Provision of worksite and access for construction and maintenance | ||
437 | Provision of worksite and access for construction | |
Provision of a turning head | ||
317 | Minor highway alterations | |
City of Manchester | 1 to 6 | Modification to depot |
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: