The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section. A version of a provision is prospective either:
Commencement Orders listed in the ‘Changes to Legislation’ box as not yet applied may bring this prospective version into force.
There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Railways (Interoperability) Regulations 2006. Any changes that have already been made by the team appear in the content and are referenced with annotations.
Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.
Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):
Prospective
1. EC verification is the procedure whereby a notified body checks and certifies, at the request of a contracting entity or of its authorised representative established within the Community, that a subsystem:
complies with the High-Speed Directive or the Conventional Directive;
complies with the other regulations deriving from the Treaty, and
may be put into operation.
2. The subsystem is checked at each of the following stages:
overall design;
construction of subsystem, including, in particular, civil-engineering activities, constituent assembly, overall adjustment;
final testing of the subsystem.
3. The notified body responsible for EC verification draws up the certificate of conformity intended for the contracting entity or its authorised representative established within the Community, which in turn draws up the EC declaration of verification intended for the supervisory authority in the Member State in which the subsystem is located and/or operates.
4. The technical file accompanying the declaration of verification must be made up as follows:
for infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete;
for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.;
list of interoperability constituents, as referred to in Article 3 of the High-Speed Directive or Article 3 of the Conventional Directive, incorporated into the subsystem;
copies of the EC declarations of conformity or suitability for use with which the abovementioned constituents must be provided in accordance with Article 13 of the High-Speed Directive or Article 13 of the Conventional Directive and accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications;
the certificate from the notified body responsible for EC verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with the applicable Directive, and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.
5.1 The aim of EC monitoring is to ensure that the obligations deriving from the technical file have been met during production of the subsystem.
5.2 The notified body responsible for checking production must have permanent access to building sites, production workshops, storage areas and, where appropriate, prefabrication or testing facilities and, more generally, to all premises which it considers necessary for its task. The contracting entity or its authorised representative within the Community must send it or have sent to it all the documents needed for that purpose and, in particular, the implementation plans and technical documentation concerning the subsystem.
5.3 The notified body responsible for checking implementation must periodically carry out audits in order to confirm compliance with the High-Speed Directive or Conventional Directive. It must provide those responsible for implementation with an audit report. It may require to be present at certain stages of the building operations.
5.4 In addition, the notified body may pay unexpected visits to the worksite or to the production workshops. At the time of such visits the notified body may conduct complete or partial audits. It must provide those responsible for implementation with an inspection report and, if appropriate, an audit report.
6. The complete file referred to in paragraph 4 must be lodged with the contracting entity or its authorised agent established within the Community in support of the certificate of conformity issued by the notified body responsible for verification of the subsystem in working order. The file must be attached to the EC declaration of verification which the contracting entity sends to the Safety Authority.
A copy of the file must be kept by the contracting entity throughout the service life of the subsystem. The file must be sent to any other Member State that requests a copy.
7. Each notified body must periodically publish relevant information concerning:
requests for EC verification received;
certificates of conformity issued;
certificates of conformity refused.
8. The files and correspondence relating to the EC verification procedures must be written in English or in a language accepted by the contracting entity.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: