- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made).
6.—(1) In constructing or maintaining any of the scheduled works, the promoter may—
(a)deviate laterally from the lines or situations shown on the works and land plans within the Order limits relating to that work shown on those plans; and
(b)deviate vertically from the levels shown on the sections—
(i)to any extent not exceeding 3 metres upwards; and
(ii)to any extent downwards as may be necessary or expedient.
(2) In constructing or maintaining any work or part of a work shown on the works and land plans as being situated in a street and for which no limits of deviation are shown on those plans, the promoter may deviate laterally within the boundaries of that street.
(3) The promoter may, in constructing or maintaining the authorised tramway, lay down—
(a)double lines of rails in place of single lines;
(b)single lines of rails in place of double lines;
(c)interlacing lines of rails in place of double or single lines; or
(d)double or single lines of rails in place of interlacing lines.
(4) The power in paragraph (3) shall not be exercised in the case of the authorised street tramway without the consent of the street authority, but such consent shall not be unreasonably withheld.
(5) The promoter may in constructing or maintaining the authorised street tramway lay down such number of switches and crossings as may be necessary or expedient.
(6) The promoter may in constructing and maintaining the authorised tramroad provide within the limits of deviation for the tramroad such number of lines of rails and sidings, switchings and crossings as may be necessary or expedient.
(7) Without limiting the scope of paragraph (1)—
(a)in constructing and maintaining Works Nos. 3, 5, 6, 6A, 10, 10A, 10B, 12, 15 and 15A the promoter may, to the extent it thinks fit, deviate from the design of the bridges shown on the sections, including by varying the number of any supporting columns or other structures, the distances between them and the height or clearance above the level of any land underneath the bridges; and
(b)in constructing and maintaining the scheduled works the promoter may, to the extent it thinks fit, deviate laterally from their points of commencement and termination shown on the works and land plans.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: