Article 20
Part of Work No. 5(c)— works to protect the existing river wall.
Work No. 5(d)— works to strengthen or support the existing river wall landward of the Putney Embankment Foreshore temporary slipway.
Work No. 6(b)(iii)— strengthening and alteration of existing river wall to the south of Whiffin Wharf, and strengthening or replacing the existing river wall to the south of Hurlingham Wharf and Carnwath Road Industrial Estate.
Work No. 8(b)(ii)— strengthening and alteration of the existing river wall to the south of Bell Lane Creek and works to protect and or strengthen the river wall on the north side of Bell Lane Creek.
Work No. 11(c)(iii)— replacement or other works to protect or strengthen the existing flood defence on the western boundary of the site.
Part of Work No. 12(c)— works to protect the existing river wall.
Part of Work No. 13(b)(iii)— works to protect or strengthen the existing river wall.
Part of Work No. 14(c)(ii)— works to protect or strengthen the existing river wall to east and west of Work No. 14(c)(i) and the existing Middle Wharf jetty.
Work No. 15(c)(ii)— works to protect and strengthen the existing slipway and existing river wall.
Part of Work No. 16(c)— works to protect the existing river wall and adjoining structures.
Part of Work No. 17(b)— works to protect the existing river wall and adjoining structures.
Part of Work No. 18— works to replace or protect the boundary wall on the west side of the existing facilities building.
Part of Work No. 19(b)— works to protect or strengthen the river wall and adjoining structures at the western end of the site.
Part of Work No. 19(b)(i)— works to replace, protect or strengthen the existing river wall to the west of Fountain Green Square.
Part of Work No. 23(b)— works to protect or strengthen the existing Docklands Light Railway viaduct.
Part of Work No. 23(b)(i)— works to protect or strengthen the existing river wall.
Part of Work No. 24(b)— works to protect or strengthen the existing river wall.
Work No. 24(b)(v)— works to protect or strengthen the existing river wall.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: