Search Legislation

The Environmental Permitting (England and Wales) Regulations 2016

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for: SCHEDULE 25B

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Environmental Permitting (England and Wales) Regulations 2016. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 25B:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

Regulation 35(1)

[F1SCHEDULE 25BE+WSpecified generators

This schedule has no associated Explanatory Memorandum

ApplicationE+W

1.  This Schedule applies in relation to every specified generator from the permitting date.

Interpretation – specified generatorsE+W

2.(1) In this Schedule—

“generator” means any combustion plant which is used for the purpose of generating electricity, but does not include any generator that is mobile unless it is connected to—

(a)

an electricity transmission system or distribution system, or

(b)

other apparatus, equipment or appliances at a site, and is performing a function that could be performed by a generator that is not mobile;

“specified generator” means—

(a)

a generator, other than an excluded generator, with a rated thermal input—

(i)

more than or equal to 1 megawatt and less than 50 megawatts, or

(ii)

in the case of a generator used to meet a capacity agreement or an agreement to provide balancing services, less than 50 megawatts;

(b)

where two or more generators falling with paragraph (a)(i) or (ii) are operated—

(i)

on the same site,

(ii)

by the same operator, and

(iii)

for the same purpose,

those generators together, provided that the rated thermal input of those generators together is less than 50 megawatts; or

(c)

where two or more generators, other than excluded generators—

(i)

are operated as set out in paragraph (b)(i) to (iii), and

(ii)

together have a rated thermal input more than or equal to 1 megawatt and less than 50 megawatts, even if one or more of the generators has a rated thermal input of less than 1 megawatt,

those generators together.

(2) For the purposes of paragraph (1)—

“excluded generator” means—

(a)

generators subject to the provisions of Chapter II or Chapter III of the Industrial Emissions Directive,

(b)

generators operating with a defined nuclear safety role under a nuclear site licence issued by the Office for Nuclear Regulation,

(c)

back-up generators operated for the purpose of testing for no more than 50 hours per year,

(d)

generators installed on an offshore platform situated on, above or below those parts of the sea adjacent to England and Wales from the low water mark to the seaward baseline of the United Kingdom territorial sea,

(e)

generators installed on a gas storage or unloading platform as defined in regulation 2 of the Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013;

“mobile”, in relation to a generator, means designed to move or be moved whether on roads or other land.

(3) In sub-paragraph (2), “offshore platform” means any fixed or floating structure which—

(a)is used for the purposes of or in connection with the production of petroleum, and

(b)in the case of a floating structure, is maintained on a station during the course of production,

but does not include any structure where the principal purpose of the use of the structure is the establishment of the existence of petroleum or the appraisal of its characteristics, quality or quantity or the extent of any reservoir in which it occurs.

(4) In sub-paragraph (3), “petroleum” includes any mineral oil or relative hydrocarbon and natural gas existing in its natural condition in strata but does not include coal or bituminous shales or other stratified deposits from which oil can be extracted by destructive distillation.

Interpretation – relevant dates and permitting datesE+W

3.(1) The “relevant date” in relation to a generator means—

(a)1st January 2019, in the case of a Tranche B generator;

(b)1st October 2019, in the case of a Tranche A generator with a rated thermal input greater than 5 megawatts which—

(i)has an emission of nitrogen oxides of equal to or greater than 500mg/Nm3, and

(ii)operates for more than 50 hours per year;

(c)1st January 2025, in the case of a Tranche A generator with a rated thermal input greater than 5 megawatts which—

(i)has an emission of nitrogen oxides of less than 500mg/Nm3, or

(ii)operates for less than or equal to 50 hours per year;

(d)1st January 2030, in the case of a Tranche A generator with a rated thermal input equal to or less than 5 megawatts.

(2) The “permitting date”—

(a)in relation to a specified generator falling within paragraph 2(1)(a), is the relevant date in relation to that specified generator;

(b)in relation to a specified generator falling within paragraph 2(1)(b) or (c), is the earliest of the relevant dates in relation to the generators comprising that specified generator.

(3) For the purposes of sub-paragraph (1)—

“Tranche A generator” means a generator—

(a)

with a rated thermal input equal to or greater than 1 megawatt and less than 50 megawatts—

(i)

which came into operation before 1st December 2016,

(ii)

which is the subject of a capacity agreement arising from the 2014 or 2015 capacity auctions (whether or not the generator came into operation before 1st December 2016), or

(iii)

for which a Feed-in Tariff preliminary accreditation application was received by the Gas and Electricity Markets Authority before 1st December 2016;

(b)

with a rated thermal input of less than 1 megawatt—

(i)

which is the subject of a capacity agreement arising from the 2014, 2015 or 2016 capacity auctions (whether or not the generator came into operation before 1st December 2016),

(ii)

for which a Feed-in Tariff preliminary accreditation application was received by the Gas and Electricity Markets Authority before 1st December 2017; or

(iii)

which is the subject of an agreement to provide balancing services entered into before 31st October 2017,

provided that a generator ceases to be a Tranche A generator if it is the subject of a capacity agreement, or an agreement for provision of balancing services, where that agreement is entered into after 31st October 2017 and remains in force after 31st December 2018;

“Tranche B generator” means any generator which is not a Tranche A generator or an excluded generator (and includes a specified generator which has ceased to be a Tranche A generator).

(4) For the purposes of sub-paragraph (1), in the case of a generator which is comprised in a specified generator falling within paragraph 2(1)(b) or (c), the generator is deemed to have the total rated thermal input of all the generators comprised in the specified generator.

Interpretation - generalE+W

4.  In this Schedule—

“back-up generator” means a generator operated for the sole purpose of maintaining power supply at a site during an on-site emergency;

“balancing services” means any services procured by the transmission system operator in order to balance demand and supply, and to ensure the security and quality of electricity supply, across the national transmission system for Great Britain;

“capacity agreement” has the meaning given in regulation 30 of the Electricity Capacity Regulations 2014;

“capacity auction” means an auction under Part 4 of the Electricity Capacity Regulations 2014;

“distribution system” has the meaning given in section 4(4) of the Electricity Act 1989;

“emission limit value” means the maximum permissible quantity of a substance contained in the waste gases from a generator which may be discharged into the air during a given period;

“Feed-in Tariff preliminary accreditation application” means an application for preliminary accreditation made under Part 3 of the Feed-in Tariffs Order 2012;

“nitrogen oxides” means nitric oxide and nitrogen dioxide;

“nuclear site licence” has the meaning given in section 1 of the Nuclear Installations Act 1965;

“transmission system” has the meaning given in section 4(4) of the Electricity Act 1989;

“transmission system operator” means the person operating the national transmission system for Great Britain;

any reference to emissions expressed in mg/Nm3 is to those emissions defined in accordance with the first paragraph of Annex II of the Medium Combustion Plant Directive.

Environmental permit conditions: generalE+W

5.(1) Subject to paragraph 6, the regulator must exercise its relevant functions in relation to specified generators so as to ensure that they are operated, from the permitting date, in such a way that—

(a)there is compliance with an emission limit value for nitrogen oxides of 190mg/Nm3;

(b)where secondary abatement is required to ensure compliance with the requirement in paragraph (a), the emission limit value for nitrogen oxides is met—

(i)in the case of a Tranche A generator or a Tranche B generator which was, but has ceased to be, a Tranche A generator, within 20 minutes of the specified generator commencing operation, or

(ii)in the case of any other Tranche B generator, within 10 minutes of the specified generator commencing operation,

and in every case emissions must be monitored at least every three years;

(c)there is no persistent emission of dark smoke, where “dark smoke” has the meaning given in section 3(1) of the Clean Air Act 1993.

(2) Where compliance with air quality aspects of an environmental quality standard requires stricter conditions for the operation of a specified generator, or a generator comprised in a specified generator falling within paragraph 2(1)(b) or (c), from the permitting date the regulator must include additional or stricter measures in the permit to comply with those standards, including (if necessary) a stricter emission limit value than that specified in paragraph (1)(a).

(3) In the case of a specified generator falling within paragraph 2(1)(b) or (c), the requirements of sub-paragraph (1) must be met by each generator comprising that specified generator only from the relevant date relating to that generator.

Exceptions to environmental permit conditionsE+W

6.(1) Paragraph 5 does not apply in relation to a specified generator falling within paragraph 2(1)(a), or a generator comprised in a specified generator falling within paragraph 2(1)(b) or (c), that is—

(a)used at a site which it is not reasonably practicable to connect to the distribution system;

(b)a back-up generator in respect of which, in the opinion of the regulator, the operator has demonstrated a genuine need to carry out routine testing for more than 50 hours per year.

(2) Paragraph 5 does not apply—

(a)until 1st January 2025 in relation to a Tranche A generator not falling within sub-paragraph (1)—

(i)with a rated thermal input greater than 5 megawatts,

(ii)with nitrogen oxide emissions of 500mg/Nm3 or greater, and

(iii)that operates for more than 50 hours per year;

(b)in relation to a Tranche A generator—

(i)with a rated thermal input greater than 5 megawatts,

(ii)with nitrogen oxide emissions of 500mg/Nm3 or greater,

(iii)that operates for more than 50 hours per year, and

(iv)that is operated only for the purpose of a capacity agreement entered into before 1st December 2016,

for the period in which that capacity agreement remains in force, or until 1st January 2025, whichever is later.

(3) Where a generator falls within sub-paragraph (1) or (2), the regulator must exercise its functions from the relevant date to ensure that the operation of the generator will not give rise to an exceedance of the limit values for nitrogen dioxide specified—

(a)in the case of a generator operated in England, in Schedule 2 to the Air Quality Standards Regulations 2010, and

(b)in the case of a generator operated in Wales, in Schedule 1 to the Air Quality Standards (Wales) Regulations 2010.

(4) Paragraph 5 does not apply in relation to a Tranche A generator—

(a)with a rated thermal input greater than 5 megawatts which—

(i)has an emission of nitrogen oxides of less than 500mg/Nm3, or

(ii)operates for no more than 50 hours per year; or

(b)with a rated thermal input greater than or equal to 1 megawatt but no greater than 5 megawatts,

where it is operated only for the purpose of a capacity agreement entered into before 1st December 2016, during the period in which that capacity agreement remains in force.

(5) Paragraph 5 does not apply in relation to a Tranche A generator with a rated thermal input of less than 1 megawatt where it is operated only for the purpose of a capacity agreement entered into before 31st January 2017, during the period in which that capacity agreement remains in force.

(6) For the purposes of sub-paragraphs (2), (4) and (5), a generator comprised in a specified generator falling within paragraph 2(1)(b) or (c) is deemed to have the total rated thermal input of all the generators comprised in that specified generator.]

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources