Search Legislation

The Environmental Permitting (England and Wales) Regulations 2016

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for: Paragraph 7

 Help about opening options

Alternative versions:

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Environmental Permitting (England and Wales) Regulations 2016. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 3 Paragraph 7:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

[F1Low-environmental-risk burials at new cemeteries or new extensions of cemeteries: EnglandE+W

This section has no associated Explanatory Memorandum

7.(1) For the purpose of paragraph 8(a)(i) of Schedule 2, the description is any burial of human remains, other than a burial of human ashes from crematoria, within a new cemetery or new extension of a cemetery.

(2) In sub-paragraph (1), “new cemetery or new extension of a cemetery” means a development which, by virtue of section 57 of the Town and Country Planning Act 1990, required planning permission authorising a change of use of land to permit burials which was granted on or after 2nd October 2023.

(3) For the purpose of paragraph 8(a)(ii) of Schedule 2, the conditions in relation to a burial of that description are that the operator ensures that—

(a)any activity relating to the burial must not cause pollution of surface water or groundwater,

(b)the burial is not within 10m of any field drain, including any dry ditch,

(c)the grave has at least 1m clearance between the base of the grave and the top of the water table,

(d)the burial is not undertaken directly into groundwater,

(e)the grave is not dug in unaltered or unweathered bedrock,

(f)the grave is not dug in an area susceptible to groundwater flooding,

(g)the burial is not within 30m of any spring or watercourse,

(h)the burial is not in, or within 50m of, a protected site,

(i)the burial is not in an ancient woodland,

(j)the new cemetery or extension in question does not have more than 2500 burials per hectare, in proportion to the total area of the new cemetery or extension,

(k)no part of the new cemetery or extension in question is within a groundwater Source Protection Zone 1,

(l)no part of the new cemetery or extension in question is within 250m of any well, spring or borehole that is used to supply water for domestic drinking or food production purposes,

(m)the new cemetery or extension is located either—

(i)entirely on strata which are unproductive strata,

(ii)entirely on strata which are a secondary B aquifer or entirely on strata which are secondary undifferentiated rocks, where the number of burials is less than 100 burials per annum,

(iii)entirely on a secondary A aquifer, where the number of burials is less than 50 burials per annum,

(iv)entirely on a principal aquifer and not in a groundwater Source Protection Zone 2, where the number of burials is less than 30 burials per annum, or

(v)on any combination of strata mentioned in paragraphs (i) to (iv), subject to sub-paragraph (4), and

(n)the new cemetery or extension does not need ongoing active control measures to be in place to protect the environment.

(4) Where a new cemetery or extension is, pursuant to sub-paragraph (3)(m)(v), partly located on one of the strata mentioned in sub-paragraph (3)(m)(ii), (iii) or (iv), the restriction on the numbers of burials per annum in sub-paragraph (3)(m)(ii), (iii) or (iv) (as the case may be) applies to the area of the new cemetery or extension located on that strata.

(5) In sub-paragraph (3)—

groundwater flooding” means flooding where the water table beneath the ground rises and causes water to seep out at ground level;

groundwater Source Protection Zone 2” means a zone—

(a)

within—

(i)

250m of a point at which water is abstracted for domestic or food production purposes from underground strata where the maximum allowable annual volume as authorised by a licence under section 24 of the Water Resources Act 1991 or allowed by virtue of section 27 of that Act (as the case may be) divided by 365 is less than 2,000 m3 per day, or

(ii)

500m of a point at which water is abstracted for domestic or food production purposes from underground strata where the maximum allowable annual volume as authorised by a licence under section 24 of the Water Resources Act 1991 divided by 365 is equal to or greater than 2,000 m3 per day, or

(b)

defined by a 400-day travel time for groundwater to reach a groundwater abstraction point that is used to supply water for domestic or food production purposes,

whichever is larger;

principal aquifer” means geological strata which—

(a)

exhibit a high intergranular or fracture permeability, and

(b)

provide a high level of water storage and support water supply or base flow to rivers, lakes and wetlands on a strategic scale;

secondary A aquifer” means permeable strata capable of supporting water supplies at a local rather than strategic scale;

secondary B aquifer” means predominantly lower permeability strata including where they have, in part, the ability to store and yield limited amounts of groundwater by virtue of localised features such as fissures, thin permeable horizons or weathering;

secondary undifferentiated rocks” means rock deposits or strata with variable permeability and storage properties which are not consistently a secondary A aquifer or secondary B aquifer;

unproductive strata” means geological strata which—

(a)

have a low permeability that has negligible significance for water supply or river base flow, and

(b)

consist of deposits that naturally offer protection to any aquifers that may be present beneath.]

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources