Search Legislation

The Environmental Permitting (England and Wales) Regulations 2016

Changes over time for: CHAPTER 1

 Help about opening options

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Environmental Permitting (England and Wales) Regulations 2016. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Schedule 3 Part 1 Chapter 1:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

CHAPTER 1E+WInterpretation of Part 1

InterpretationE+W

1.—(1) In this Part—

agricultural land” has the meaning given in section 109(1) of the Agriculture Act 1947 M1 and, for the purposes of the descriptions in paragraphs U10 and U11, includes land used for the production of timber or other non-food crops;

anaerobic digestion” means the mesophilic and thermophilic biological decomposition and stabilisation of biodegradable waste which—

(a)

is carried on under controlled anaerobic conditions, and

(b)

results in stable sanitised material that can be applied to land for the benefit of agriculture or to improve the soil structure or nutrients in land;

associated storage” means storage of waste that—

(a)

is associated with the use, treatment or disposal of waste, and

(b)

takes place at the place where the use, treatment or disposal is carried on;

bank” means a bank, wall or embankment adjoining or confining, or constructed for the purposes of or in connection with, any channel and includes all land between the bank and low-watermark;

construction” means the carrying on of building or engineering work which includes the repair, alteration, maintenance or improvement of an existing work and preparatory or landscaping works;

impermeable surface” means a surface or pavement constructed and maintained to a standard sufficient to prevent the transmission of liquids beyond the surface;

inland waters” has the meaning given in section 221(1) of the 1991 Act;

List of Wastes” means the list of wastes established by Commission Decision 2000/532/EC replacing Decision 94/3/EC establishing a list of wastes pursuant to Article 1(a) of Council Directive 75/442/EEC on waste and Council Decision 94/904/EC establishing a list of hazardous waste pursuant to Article 1(4) of Council Directive 91/689/EEC on hazardous waste M2, as amended from time to time;

place of production” means, in relation to any waste, the place where the waste was originally produced;

Plant Health notice” means a notice served under—

(a)

article 13 of the Plant Health (Phytophthora ramorum) (Wales) Order 2006 M3;

(b)

article 31 of the Plant Health (Forestry) Order 2005 M4;

(c)

article 32 of the Plant Health (England) Order 2015 M5;

(d)

article 32 of the Plant Health (Wales) Order 2006 M6;

“relevant waste”, where it appears in any paragraph in this Part, means waste that—

(a)

falls within a code specified in the first column of the table in the paragraph, and

(b)

is of a type specified in the second column of the table;

scrap metal” has the meaning given in section 21 of the Scrap Metal Dealers Act 2013 M7;

sealed drainage” means a drainage system with an impermeable surface which ensures that—

(a)

no liquid will run off the surface otherwise than via the system, and

(b)

except where they may be lawfully discharged, all liquids entering the system are collected in a sealed sump;

secondary containment” means a bund or any other system for preventing waste which has leaked from the primary container from escaping from the place where it is stored or treated.

(2) In this Part, a six-digit code used to refer to a waste is a reference to the waste specified by the six-digit code in the List of Wastes, except insofar as the waste in this Part in relation to such a code does not include some of the types of waste specified by the code in the List.

(3) Where a bund is used as secondary containment—

(a)the bund must have an impermeable lining and—

(i)have a capacity of not less than 110% of the original container's storage capacity, or

(ii)if there is more than one container within the containment system, have a capacity of not less than 110% of the largest container's storage capacity or 25% of the aggregate storage capacity, whichever is the greater, and

(b)reasonable precautions must be taken to ensure that the capacities specified in paragraph (a) are maintained at all times.

(4) When interpreting this Part, a container, lagoon or other place is secure in relation to waste kept in it if—

(a)all reasonable precautions are taken to ensure that the waste cannot escape from it, and

(b)members of the public are unable to gain access to the waste.

(5) Where a quantity limit is specified in relation to more than one operation (storage, use or treatment) in any one specific or additional condition, that quantity limit applies to all of those operations on an aggregate basis.

(6) Where a waste operation is carried on by waste mobile plant, the quantity limits specified in any specific or additional specific condition in any Chapter of this Part apply in relation to each place where the operation is carried on.

(7) The quantity limits specified in any specific condition in paragraphs U1, U2, U10, U11, U12 and U15 that relate to the use or storage of waste over a specified period apply for that period regardless of whether more than one establishment or undertaking carries on the operation at the same place over that period.

(8) In this Part—

(a)a reference to any of paragraphs U1 to U16 is a reference to a paragraph numbered 1 to 16 in Section 2 of Chapter 2 (use of waste);

(b)a reference to any of paragraphs T1 to [F1T33] is a reference to a paragraph numbered 1 to [F233] in Section 2 of Chapter 3 (treatment of waste);

(c)a reference to any of paragraphs D1 to D8 is a reference to a paragraph numbered 1 to 8 in Section 2 of Chapter 4 (disposal of waste);

(d)a reference to any of paragraphs S1 to S3 is a reference to a paragraph numbered 1 to 3 in Section 2 of Chapter 5 (storage of waste).

Textual Amendments

F1Word in Sch. 3 Ch. 1 para. 1(8)(b) substituted (1.10.2020) by The Waste (Circular Economy) (Amendment) Regulations 2020 (S.I. 2020/904), regs. 1(1), 21(4)(a)(i)

F2Word in Sch. 3 Ch. 1 para. 1(8)(b) substituted (1.10.2020) by The Waste (Circular Economy) (Amendment) Regulations 2020 (S.I. 2020/904), regs. 1(1), 21(4)(a)(ii)

Marginal Citations

M2OJ No L 226, 6.9.2000, p 3, as last amended by Commission Decision 2014/955/EU (OJ No L 370, 30.12.2014, p 44).

M3S.I. 2006/1344 (W. 134), to which there are amendments not relevant to these Regulations.

M4S.I. 2005/2517; relevant amending instruments are S.I. 2011/1043, 2013/755 (W. 90), 2014/2420 and 2015/1723 (W. 235).

M5S.I. 2015/610, to which there are amendments not relevant to these Regulations.

M6S.I. 2006/1643 (W. 158), amended by S.I. 2011/1043; there are other amending instruments but none is relevant.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources