Search Legislation

The Utilities Contracts Regulations 2016

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes to legislation:

The Utilities Contracts Regulations 2016, CHAPTER 1 is up to date with all changes known to be in force on or before 05 June 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Part 1 Chapter 1:

Changes and effects yet to be applied to the whole Instrument associated Parts and Chapters:

Whole provisions yet to be inserted into this Instrument (including any effects on those provisions):

  • reg. 21(1)(c)(i)(aa) words substituted by S.I. 2019/560 reg. 9(12)(a)(i) (This amendment not applied to legislation.gov.uk. Affecting Regulations revoked (20.11.2020) by S.I. 2020/1319, regs. 1(3), 2(a))
  • reg. 21(1)(c)(i)(bb) words substituted by S.I. 2019/560 reg. 9(12)(a)(ii) (This amendment not applied to legislation.gov.uk. Affecting Regulations revoked (20.11.2020) by S.I. 2020/1319, regs. 1(3), 2(a))

CHAPTER 1E+W+N.I.CITATION, COMMENCEMENT, EXTENT, DEFINITIONS AND SUBJECT-MATTER

Citation, commencement and extentE+W+N.I.

1.—(1) These Regulations may be cited as the Utilities Contracts Regulations 2016.

Commencement

(2) Except for the provisions mentioned in paragraphs (3) and (4), these Regulations come into force on 18th April 2016.

(3) Paragraphs (1) to (7) of regulation 40 come into force—

(a)for the purposes of regulations 45(6), 52(13), 54(4), 73(4) and 124(2)(a) on 18th April 2016

(b)for the purposes of regulation 55(7), on 18th April 2017;

(c)for all other purposes, on 18th October 2018.

(4) Regulation 55(7) comes into force on 18th April 2017.

Extent

(5) These Regulations do not extend to Scotland.

DefinitionsE+W+N.I.

2.—(1) In these Regulations—

accelerated open procedure” means an open procedure in which the utility has exercised the power conferred by regulation 45(5) to fix a time limit for the receipt of tenders which is shorter than the minimum specified in regulation 45(2).

ancillary purchasing activities” means activities consisting of the provision of support to purchasing activities, in particular in the following forms—

(a)

technical infrastructure enabling utilities to award public contracts or to conclude framework agreements for works, supplies or services;

(b)

advice on the conduct or design of procurement procedures;

(c)

preparation and management of procurement procedures on behalf and for the account of the utility concerned;

call for competition” means a call for competition made in a manner permitted by regulation 44(4) or, where relevant, one of the notices referred to in regulation 91(1) or a contest notice;

candidate” means an economic operator that has sought an invitation or has been invited to take part in a restricted or negotiated procedure, a competitive dialogue or an innovation partnership;

central purchasing body” means a utility, within the meaning of regulation 5, or a contracting authority, within the meaning of regulation 2(1) of the Public Contracts Regulations, which provides centralised purchasing activities and which may also provide ancillary purchasing activities;

centralised purchasing activities” has the meaning given by regulation 55(10);

F1...

contest notice” means the notice referred to in regulation 95(1);

“contracts”, except as provided for in regulation 122(10), means contracts for pecuniary interest concluded in writing between one or more utilities and one or more economic operators and having as their object the execution of works, the supply of products or the provision of services.

contract notice” means the notice referred to in regulation 69 or, where relevant, 91(1)(a);

contracting authorities” has the meaning given to it by regulation 4;

[F2“covered by regulation 3(2)”, in relation to an activity, an element, a part of a contract, or procurement, means that regulation 3(2)—

(a)

applies to that activity, element, part or procurement, or

(b)

would do so if these Regulations applied;]

CPV” means the Common Procurement Vocabulary as adopted by Regulation (EC) No. 2195/2002 of the European Parliament and of the Council M1 as amended from time to time;

Defence and Security Regulations” means the Defence and Security Public Contracts Regulations 2011 M2;

“design contests” except as provided for in regulation 122(10), means those procedures which enable a utility to acquire, mainly in the fields of town and country planning, architecture, engineering or data processing, a plan or design selected by a jury after being put out to competition with or without the award of prizes;

[F3“devolved Northern Ireland authority” means a contracting authority whose functions are wholly or mainly functions which could be conferred by provision included in an Act of the Northern Ireland Assembly made without the consent of the Secretary of State (see sections 6 to 8 of the Northern Ireland Act 1998);

“devolved Welsh authority” has the meaning given by section 157A of the Government of Wales Act 2006;]

disabled”, in relation to a person, means a disabled person within the meaning of the Equality Act 2010 M3 and, in relation to a worker, means a disabled person who is a worker;

“dynamic purchasing system” except as provided for in regulation 122(10), means the system referred to in regulation 52;

economic operator” means any person, or a utility, or a group of such persons or utilities or both, including any temporary associations of undertakings, which offers the execution of works or a work, the supply of products or the provision of services on the market;

[F4“electronic document” has the meaning given in Article 3(35) of Regulation (EU) No 910/2014 of the European Parliament and of the Council on electronic identification and trust services for electronic transactions in the internal market;]

electronic means” means electronic equipment for the processing (including digital compression) and storage of data which is transmitted, conveyed and received by wire, by radio, by optical means or by other electromagnetic means;

[F5“electronic signature” has the meaning given in Article 3(10) of Regulation (EU) No 910/2014 of the European Parliament and of the Council on electronic identification and trust services for electronic transactions in the internal market;]

F6...

European standard” means a standard adopted by a European standardisation organisation and made available to the general public;

“framework agreement” except as provided for in regulation 122(10), has the meaning given by regulation 51(2);

GPA” means the Agreement on Government Procurement [F7signed at Marrakesh on 15th April 1994, as amended on or before [F830th October 2023]];

[F9“GPA party” means any country, state or separate customs territory that is—

(a)

listed in Schedule A1; or

(b)

a member State of the EU;]

innovation” means the implementation of a new or significantly improved product, service or process, including but not limited to production, building or construction processes, a new marketing method, or a new organisational method in business practices, workplace organisation or external relations including with the purpose of helping to solve societal challenges or to support F10... sustainable and inclusive growth;

international standard” means a standard adopted by an international standardisation organisation and made available to the general public;

F11...

label” means any document, certificate or attestation confirming that the works, products, services, processes or procedures in question meet certain requirements;

label requirements” means the requirements to be met by the works, products, services, processes or procedures in question in order to obtain the label concerned;

legal person” means a person, whether governed by private law or public law, other than a natural person;

life cycle” means all stages which are consecutive or interlinked, including research and development to be carried out, production, trading and its conditions, transport, use and maintenance, throughout the existence of the product or the works or the provision of the service, from raw material acquisition or generation of resources to disposal, clearance and end of service or utilisation;

national standard” means a standard adopted by a national standardisation organisation and made available to the general public;

Official Journal” means the Official Journal of the European Union;

periodic indicative notice” means the notice referred to in regulation 67 F12...;

procurement” means the acquisition by means of a works, supply or service contract of works, supplies or services by one or more utilities from economic operators chosen by those utilities, provided that the works, supplies or services are intended for the pursuit of one of the activities referred to in regulations 9 to 15;

procurement document” means any document produced or referred to by the utility to describe or determine elements of the procurement or the procedure, including the contract notice F13... or the notices on the existence of a qualification system where they are used as a means of calling for competition, the technical specifications, the descriptive document, proposed conditions of contract, formats for the presentation of documents by candidates and tenderers, information on generally applicable obligations and any additional documents;

Public Contracts Regulations” means the Public Contracts Regulations 2015 M4;

F14...

F15...

“selection criteria”, means, except in regulation 96, selection criteria set out by the utility in accordance with regulations 78 or 80, or both;

service contracts” means contracts which have as their object the provision of services other than those referred to in the definition of “works contracts”;

standard” means a technical specification, adopted by a recognised standardisation body, for repeated or continuous application, with which compliance is not compulsory;

supply contracts” means contracts which have as their object the purchase, lease, rental or hire-purchase, with or without an option to buy, of products, whether or not the contract also includes, as an incidental matter, siting and installation operations;

technical specifications” has the meaning given by regulation 60(3);

tenderer” means an economic operator that has submitted a tender;

TFEU” means the Treaty on the Functioning of the European Union M5;

F16...

[F17“the UK e-notification service” has the meaning mentioned in regulation 71(6), and references (in whatever terms) to the submission of notices to that service are to be construed in accordance with the provisions applied (and adapted) by regulation 71(6);]

Utilities Contracts Directive” means Directive 2014/25/EU of the European Parliament and of the Council M6;

“utilities” except as provided for in regulation 122(10), has the meaning given to it by regulation 5;

VAT” means value added tax;

a work” means the outcome of building or civil engineering works taken as a whole which is sufficient in itself to fulfil an economic or technical function; but “works” is to be interpreted in accordance with paragraph (2);

working day” means a day other than a Saturday, Sunday, Christmas Day, Good Friday or bank holiday within the meaning of the Banking and Financial Dealings Act 1971 M7;

works contracts” means contracts which have as their object any of the following—

(d)

the execution, or both the design and execution, of works related to one of the activities specified in Schedule 1;

(e)

the execution, or both the design and execution, of a work;

(f)

the realisation by whatever means of a work corresponding to the requirements specified by the utility exercising decisive influence on the type or design of the work; and

“written” or “in writing” means any expression consisting of words or figures which can be read, reproduced and subsequently communicated, including information transmitted and stored by electronic means.

(2) Except in Part 5 any other expression used both in these Regulations and in the Utilities Contracts Directive has the meaning that it bears in that Directive.

(3) In these Regulations (except regulation 72(4)), any reference to a period of time, however expressed, is to be interpreted subject to the following requirements—

(a)the period must include at least 2 working days; and

(b)where the period is to be calculated from the moment at which an action takes place or other event occurs, the day during which that action takes place or that event occurs is not be counted in the calculation of that period.

(4) In these Regulations (except regulation 72(4)), any reference to a period of time, however expressed, is to be interpreted subject to the requirement that where the period—

(a)is to be calculated by counting forwards in time from a given date or event, and

(b)would (but for this paragraph) have ended on a day which is not a working day,

the period is to end at the end of the next working day.

Textual Amendments

Marginal Citations

M1OJ No L 340, 16.12.2002, p1. last amended by Commission Regulation (EC) No 596/2009 of the European Parliament and of the Council (OJ No L 188, 18.7.2009, p14).

M2S.I. 2011/1848, amended by S.S.I. 2011/2053, 2013/1431, 2015/102.

M5OJ No C 115, 9.5.2008, p47.

M6OJ No L 94, 28.3.2014, p243.

Subject-matter and scopeE+W+N.I.

3.—(1) Parts 1 to 4 establish rules on the procedures for procurement by utilities with respect to contracts and design contests which—

(a)have a value estimated to be not less than the threshold mentioned in regulation 16, and

(b)are not excluded from the scope of Parts 1 to 4 by any other provision in Chapters 2 and 3 of this Part.

[F18(2) Parts 1 to 4—

(a)do not oblige the United Kingdom to supply information the disclosure of which it considers contrary to the essential interests of its security;

(b)do not preclude the United Kingdom from taking such measures as it considers necessary for the protection of the essential interests of its security which are connected with the production or trade in arms, munitions and war material, provided that such measures do not adversely affect the conditions of competition regarding products which are not intended for specifically military purposes.

(2A) The arms, munitions and war material to which paragraph (2)(b) applies are, subject to paragraph (2C), those included in the 1958 List.

(2B) Subject to the effect of any regulations made under paragraph (2C), any measures which, if they had been taken immediately before IP completion day, would have been covered by Article 346 of TFEU shall be regarded as measures covered by paragraph (2).

(2C) The Secretary of State may make regulations providing that the 1958 List is to be treated for the purposes of Parts 1 to 4 as if it were changed in respects specified in the regulations.

(2D) In this regulation, “the 1958 List” means the list of arms, munitions and war material adopted by the Council of the European Economic Community in its decision 255/58 of 15th April 1958.]

(3) The scope of Parts 1 to 4 does not include non-economic services of general interest.

Contracting authoritiesE+W+N.I.

4.—(1) In these Regulations, “contracting authorities” means State, regional or local authorities (including the Crown, but not including Her Majesty in her private capacity), bodies governed by public law or associations formed by one or more such authorities or one or more such bodies governed by public law.

(2) “Bodies governed by public law” means any bodies that have all of the following characteristics—

(a)they are established for the specific purpose of meeting needs in the general interest, not having an industrial or commercial character;

(b)they have legal personality; and

(c)they have any of the following characteristics—

(i)they are financed, for the most part, by the State, regional or local authorities, or by other bodies governed by public law;

(ii)they are subject to management supervision by those authorities or bodies; or

(iii)they have an administrative, managerial or supervisory board, more than half of whose members are appointed by the State, regional or local authorities, or by other bodies governed by public law.

UtilitiesE+W+N.I.

5.—(1) For the purpose of these Regulations, utilities are entities which—

(a)are contracting authorities or public undertakings and which pursue one of the activities referred to in regulations 9 to 15;

(b)are not contracting authorities or public undertakings, but whose activities include an activity referred to in regulations 9 to 15 and operate on the basis of special or exclusive rights granted by a competent authority.

Public undertaking

(2) In this regulation, “public undertaking” means any undertaking over which contracting authorities may exercise directly or indirectly a dominant influence by virtue of—

(a)their ownership of that undertaking;

(b)their financial participation in that undertaking; or

(c)the rules which govern that undertaking.

(3) For the purposes of paragraph (2), a dominant influence on the part of contracting authorities is presumed in any of the following cases in which those authorities, directly or indirectly—

(a)hold the majority of the undertaking's subscribed capital;

(b)control the majority of the votes attaching to shares issued by the undertaking;

(c)can appoint more than half of the undertaking's administrative, management or supervisory body.

Special or exclusive rights

(4) In this regulation, “special or exclusive rights” mean rights granted by a competent authority by way of any legislative, regulatory or administrative provision, the effect of which is to limit the exercise of activities referred to in regulations 9 to 15 to one or more utilities, and which substantially affects the ability of other entities to carry out such activity.

(5) For the purposes of paragraph (4), rights which have been granted by means of a procedure in which—

(a)adequate publicity has been ensured; and

(b)where the granting of those rights was based on objective criteria

shall not constitute “special or exclusive rights”.

(6) The procedures referred to in paragraph (5) include—

(a)procurement procedures with a prior call for competition in accordance with—

(i)these Regulations;

(ii)the Public Contracts Regulations;

(iii)the Concessions Contracts Regulations 2016 M8; or

(iv)the Defence and Security Regulations;

(b)procedures pursuant to other legal acts of the EU listed in Annex II of the Utilities Contracts Directive as amended from time to time, ensuring adequate prior transparency for granting authorisations on the basis of objective criteria.

Marginal Citations

Mixed procurement covering the same activityE+W+N.I.

6.—(1) In the case of mixed contracts which have as their subject-matter different types of procurement all of which are covered by these Regulations—

(a)contracts which have as their subject-matter two or more types of procurement (works, services or supplies) shall be awarded in accordance with the provisions applicable to the type of procurement that characterises the main subject-matter of the contract in question; and

(b)in the case of—

(i)mixed contracts consisting partly of services to which Chapter 1 of Part 3 applies and partly of other services, or

(ii)mixed contracts consisting partly of services and partly of supplies,

the main subject-matter shall be determined according to which of the estimated values of the respective services, or of the respective services and supplies is the highest.

(2) In the case of contracts which have as their subject-matter procurement covered by these Regulations and procurement not covered by these Regulations—

(a)where the different parts of a given contract are objectively separable—

(i)utilities may choose to award separate contracts for the separate parts or to award a single contract;

(ii)where utilities choose to award separate contracts for the separate parts, the decision as to which legal regime applies to any one of such separate contracts shall be taken on the basis of the characteristics of the separate part concerned; and

(iii)where utilities choose to award a single contract, these Regulations apply to the ensuing mixed contract, irrespective of—

(aa)the value of the parts that would otherwise fall under a different legal regime, and

(bb)which legal regime those parts would otherwise have been subject to;

(iv)where the decision is taken to award a single contract then that mixed contract will, where it contains elements of supply, works and service contracts and of concessions, be awarded in accordance with these Regulations, provided that the estimated value of the part of the contract which constitutes a contract covered by these Regulations, calculated in accordance with regulation 17, is equal to or greater than the relevant threshold mentioned in regulation 16.

(b)where the different parts of a given contract are objectively not separable, the applicable legal regime shall be determined on the basis of the main subject-matter of that contract;

(3) But where part of a given contract is covered by [F19regulation 3(2)] or the Defence and Security Regulations, regulation 25 applies instead of paragraph (1) or (2).

Procurement covering several activitiesE+W+N.I.

7.—(1) In the case of contracts intended to cover several activities, utilities may choose to award separate contracts for the purposes of each separate activity or to award a single contract.

(2) Where utilities choose to award separate contracts, the decision as to which rules apply to any one of such separate contracts shall be taken on the basis of the characteristics of the separate activity concerned.

(3) Despite regulation 6 and subject to paragraph (5), where utilities choose to award a single contract paragraphs (6) and (7) apply.

(4) But where one of the activities concerned is covered by the Defence and Security Regulations or [F20covered by regulation 3(2)], regulation 26 applies instead of paragraphs (6) and (7).

(5) The choice between awarding a single contract or awarding a number of separate contracts shall not be made with the objective of excluding the contract or contracts from the scope of these Regulations or, where applicable, the Public Contracts Regulations or the Concession Contracts Regulations 2016.

(6) A contract which is intended to cover several activities shall be subject to the rules applicable to the activity for which it is principally intended.

(7) In the case of contracts where it is objectively impossible to determine for which activity the contract is principally intended, the applicable rules shall be determined in accordance with the following—

(a)the contract shall be awarded in accordance with the Public Contracts Regulations, if one of the activities for which the contract is intended is subject to these Regulations and the other to the Public Contracts Regulations;

(b)the contract shall be awarded in accordance with these Regulations, if one of the activities for which the contract is intended is subject to these Regulations and the other to the Concessions Contracts Regulations 2016;

(c)the contract shall be awarded in accordance with these Regulations, if one of the activities for which the contract is intended is subject to these Regulations and the other is not subject to either these Regulations, the Public Contracts Regulations or the Concessions Contracts Regulations 2016.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources