Scheme design

5.—(1) The authorised development must be carried out in general accordance with the general arrangement plans. The authorised development will not be in general accordance with the general arrangement plans if any departure from the general arrangement plans would give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.

(2) The authorised development must be designed in accordance with the parameters specified in Table 1 below and the works plans and implemented in accordance with approved plans and any other approvals given by the relevant planning authority pursuant to these requirements.

Table 1
Work TypeParameterPart(s) of the authorised developmentMaximum value(s) and unit
AGIMaximum fenced area of Ince AGIWork No. 11,800m2
AGIMaximum fenced area of Stanlow AGIWork No. 92,656m2
AGIMaximum fenced area of Northop Hall AGIWork No.451,155m2
AGIMaximum fenced area of Flint AGIWork No.485,600m2
AGIMaximum height of buildings and structuresWork Nos. 1, 9, 45 and 485m from ground level
AGIMaximum width of new permanent accessesWork Nos. 2, 8, 10, 46 and 496m
AGIMaximum height of fencing and gatingWork No. 1, 9, 45, 483m from ground level
BVSMaximum fenced area of BVSWork No. 20, 26, 36, 51, 53, 551,050m2
BVSMaximum height of buildings and structuresWork Nos. 20, 26, 36, 51, 53 and 555m from ground level
BVSMaximum height of fencing and gatingWork Nos. 20, 26, 36, 51, 53 and 553m from ground level
BVSMaximum width of new permanent accessesWork No. 21, 27, 37, 52, 54 and 563m
Construction compoundMaximum height of fencing and gatingWork No. 6B, 15A, 19A, 30A, 30D, 31A, 41A and 44C2.4m from ground level
Construction CompoundMaximum fenced area of Stanlow CompoundWork No. 6B66,000m2
Construction CompoundMaximum fenced area of Picton Lane CompoundWork No. 15A32,000m2
Construction CompoundMaximum fenced area of Chorlton Lane CompoundWork No. 19A41,000m2
Construction CompoundMaximum fenced area of Wood Farm CompoundWork No. 30D90,000m2
Construction CompoundMaximum fenced area of Sealand Road CompoundWork No. 30A48,000m2
Construction CompoundMaximum fenced area of River Dee CompoundWork No. 31A43,000m2
Construction CompoundMaximum fenced area of Shotton Lane CompoundWork No. 41A37,000m2
Construction CompoundMaximum fenced area of Northop Hall CompoundWork No. 44C35,000m2

(3) The buildings and structures identified in Table 1 must only be constructed within the area for the Work No. of which they form part as shown in the works plans.

(4) Each of Work Nos. 1, 9, 20, 26, 36, 45, 48, 51, 53 and 55 may not be commenced until, for that Work No. the following details have been submitted to and approved by the relevant planning authority:

(a)the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings and structures;

(b)details of permanent accesses to the public highway;

(c)details of any external lighting; and

(d)details of the noise ratings of any external machinery or potentially noisy installations (such as fans).

(5) No part of Work No. 43E may be commenced until details of the design and construction methodology of any works have been submitted to and approved by the relevant planning authority following consultation with Natural Resources Wales.

(6) The details submitted under sub-paragraph (5) must be accompanied by flood risk assessment showing the maximum water level reached in a 1 in 100 year event plus 40% climate change scenario. The soffit level of the embedded pipe bridge over the Alltami brook must be set no less than 300 millimetres above that maximum water level. The flood consequences assessment must also demonstrate that the impacts of the proposal on flood risk elsewhere can be managed to an acceptable level.

(7) Where the position of the abutments of Work No. 43E require the stopping up of part of the current route of Footpath 414/39A, the details submitted under sub-paragraph (5) must include a scheme setting out the alternative route and specification for the permanent diversion of the part of public right of way Footpath 414/39A to be stopped up, and setting out how that alternative is to be legally created.

(8) The works listed in sub-paragraph (4) and (5) must be implemented in accordance with the details approved under this paragraph.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources