Article 26

SCHEDULE 8Land in which only new rights etc., may be acquired

(1) Number of plot shown on land plans(2) Purpose for which rights may be acquired

1-01

1-01a

1-02

1-03

1-04

1-06

1-06a

1-06b

1-06c

1a-01

1a-02

1a-03

1a-04

12-21

13-01

13-02

13-03

13-04

13-05

13-06

13-10

13-11

14-21

14-22

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to—

(a) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land;

(b) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights;

(c) use, maintain and improve a means of access including visibility splays, and retain, maintain, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway;

(d) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus, public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development);

(e) construct, lay down, use and remove temporary access roads or road surfacing including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out;

(f) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary barriers for the protection of fauna; and

(g) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development.

3-04

3-05

3-06

3-07

3-08

3-09

3-10

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to—

(h) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land;

(i) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights;

(j) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway;

(k) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus, public and private drains, connections to watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development);

(l) remove and discharge water from the Land and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace a drainage scheme on the Land (the “drainage works”);

(m) inspect, use mechanical excavation (including directional drilling and/or digging), reinstate, remove, move or alter such part or parts of any drainage system on the Land for the purposes of the drainage works (including connecting the drainage works to any land drain as at the date of the drainage works);

(n) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works;

(o) make such investigations in or on the Land as required for the purposes of the drainage works;

(p) use or resort to trenchless installation techniques including (but not limited to) directional drilling in connection with the drainage works;

(q) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works;

(r) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out;

(s) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works;

(t) retain, repair, improve, renew, remove, relocate and plant trees, shrubs, and hedgerows, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;

(u) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and

(v) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to:

(w) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline;

(x) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development;

(y) prevent, without the written consent of the undertaker, the carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and

(z) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the drainage works, ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.

1-21

2-02a

2-04a

5-08

6-27

7-02b

7-03

7-03a

11-07

12-04

12-06

14-11

14-14a

14-20

15-02a

15-09

15-10

15-14

16-28a

16-29

16-30

17-17

17-18

17-19

20-09

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to—

(aa) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land;

(bb) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights;

(cc) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; effect access to the highway including to construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway;

(dd) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development);

(ee) remove and discharge water from the Land and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace a drainage scheme on the Land (the “drainage works”);

(ff) inspect, use mechanical excavation (including directional drilling and/or digging), reinstate, remove, move or alter such part or parts of any drainage system on the Land for the purposes of the drainage works (including connecting the drainage works to any land drain as at the date of the drainage works);

(gg) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works;

(hh) make such investigations in or on the Land as required for the purposes of the drainage works;

(ii) use or resort to trenchless installation techniques including (but not limited to) directional drilling in connection with the drainage works;

(jj) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works;

(kk) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out;

(ll) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works;

(mm) install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;

(nn) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and

(oo) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to:

(pp) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline;

(qq) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development;

(rr) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and

(ss) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the drainage works, ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.

6-07

6-08

6-09

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to—

(tt) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land;

(uu) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights;

(vv) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; effect access to the highway including to construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway;

(ww) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works;

(xx) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works;

(yy) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out;

(zz) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works;

(aaa) remove and relocate trees, shrubs, hedgerows,;

(bbb) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and

(ccc) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development.

28-03

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to—

(ddd) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land;

(eee) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights;

(fff) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works;

(ggg) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works;

(hhh) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development);

(iii) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out;

(jjj) install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping;

(kkk) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and

(lll) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to:

(mmm) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline;

(nnn) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development;

(ooo) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and

(ppp) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the ecological or environmental mitigation areas without the prior written consent of the undertaker.

9-04

16-03a

1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of surveying or investigating the land.

2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to:

(qqq) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline;

(rrr) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development; and

(sss) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources