This Order provides for the construction and operation of an offshore wind farm and ancillary works on the bed of Swansea Bay off the coast between Porthcawl and Port Talbot and for the connection of those works via an onshore substation to the electricity distribution system.
A copy of the works plans, land plans, sections and of the book of reference prescribed by rule 12(1), (2), (3) and (5) of the Transport and Works (Applications and Objections Procedure) (England and Wales) Rules 2000, and certified in accordance with article 34 of this Order, may be inspected at the offices of Scarweather Sands Ltd., PO Box 824, Alexandra Gate, Rover Way, Cardiff, CF24 2SD.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area. The revised version is currently only available in English.
Original (As Enacted or Made) - English: The original English language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Original (As Enacted or Made) - Welsh:The original Welsh language version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.