Chwilio Deddfwriaeth

The Water Protection Zone (River Dee Catchment) (Procedural and Other Provisions) Regulations 1999

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)

Rhagor o Adnoddau

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Interpretation

  4. 3.Application

  5. 4.Obtaining protection zone consent

  6. 5.Applications for protection zone consent

  7. 6.Procedure upon receipt of applications for protection zone consent

  8. 7.Consideration and determination of applications

  9. 8.Reference of applications to the Secretary of State

  10. 9.Applications for variation of protection zone consent conditions

  11. 10.Applications for the continuation of protection zone consent

  12. 11.Revocation of consents and alteration and imposition of conditions

  13. 12.Appeals

  14. 13.Consents register

  15. 14.Charges in connection with protection zone consent

  16. 15.Inquiries

  17. Signature

    1. SCHEDULE 1

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR PROTECTION ZONE CONSENT

      1. 1.The following is required— (a) a site map;

      2. 2.The site map required by paragraph 1(a) shall be a...

      3. 3.The substance location plan required by paragraph 1(b) shall be...

      4. 4.The substance specification statement required by paragraph 1(c) shall contain...

      5. 5.The safety and emergency statement required by paragraph 1(d) shall...

      6. 6.The process specification statement required by paragraph 1(e) shall contain...

    2. SCHEDULE 2

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR VARIATION OF PROTECTION ZONE CONSENT

      1. 1.(1) The following is required— (a) a copy of the...

      2. 2.The relevant consent referred to in sub-paragraph 1(1)(a) is the...

      3. 3.The safety and emergency statement required by sub-paragraph 1(1)(e) shall...

    3. SCHEDULE 3

      INFORMATION AND OTHER DOCUMENTATION REQUIRED IN RELATION TO APPLICATIONS FOR CONTINUATION OF PROTECTION ZONE CONSENT

      1. 1.The following is required— (a) a copy of the relevant...

      2. 2.The change of control plan required by paragraph 1(a) shall...

      3. 3.The relevant consent referred to in paragraph 1(a) is the...

      4. 4.The safety and emergency statement required by paragraph 1(d) shall...

  18. Explanatory Note

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill